Automatically apply for jobs with Zippia
Upload your resume to get started.
Cement finisher skills for your resume and career
15 cement finisher skills for your resume and career
1. Sidewalks
Sidewalk is a pathway placed beside roadways for pedestrians to walk on. Sidewalks are typically made of cement and are found within residential areas or small towns for people to use while walking around. Sidewalks are not often found next to highways or fast-moving roads as the speed of the vehicles creates loud noises and high wind.
- Supervised Labor Foreman and Laborers on construction and maintenance for city sidewalks, curbs and gutters.
- Set up forms for curbs and gutters, sidewalks, driveways, approaches.
2. Finishers
- Trained and managed 10 finishers and achieved significant improvements in their productivity.
- Concrete finishers place the concrete either directly from the concrete wagon chute, concrete pump, concrete skip or wheelbarrow.
3. Construction Sites
A piece of land where constructional activities are to be conducted is termed as a construction site.
- Led developments and staff logistics by acting as a go-to at construction sites; received noteworthy praise on tasks.
- Examine and inspect work progress, equipment, and construction sites to verify safety and to ensure that specifications are met.
4. Smooth Surfaces
- Wet concrete surface, and rub with stone to smooth surface and obtain specified finish.
- Finished and smooth surface such as floor sidewalk curbs gutters patch voice and use saws to cut materials
5. Expansion Joints
Expansion joints are set in cement to forestall cracks framed because of the change of temperature. Concrete goes through expansion because of hot temperature in a limited area that prompts cracks. Expansion joints are present in bridges, asphalts, structures, buildings, walkways, rail routes, channeling networks, boats, and many different structures.
- Molded expansion joints and edges.
- Molded expansion joints and edges.
6. Rebar
- Build steel cage made of rebar, to be placed inside metal forms to build various sized bridges.
- Build in-ground pools and spas, worked with rebar, plumbing, and cement.
Choose from 10+ customizable cement finisher resume templates
Build a professional cement finisher resume in minutes. Our AI resume writing assistant will guide you through every step of the process, and you can choose from 10+ resume templates to create your cement finisher resume.7. Bull Float
- Smooth concrete surface using a hand towel, long handled bull float or powered float.
- Used straight edges and bull floats to pour concrete floors and other flatwork.
8. CDL
- Cement finisher CDL Curb, stamped concrete, exposed agregate and flat work.
9. Screeds
- Surface preparation for waterproofing and finishing, established elevation and grades, setting of screeds and forms for cement and concrete.
- Smooth and finish freshly poured cement or concrete, using floats, trowels, screeds, or powered cement finishing tools.
10. Concrete Structures
- Construct wood forms curbs and for concrete construction projects Broke and dug out existing concrete structures for repair and reconstruction.
- Construct and repair concrete block walls and structures Breakup/Excavation of existing concrete structures for repair and reconstruction.
11. Trowels
- Experience in placement and finishing of concrete using magic screed, walk-behind trowel machine, and ride-on trowel machine.
- Smooth and finish freshly poured cement or concrete, using floats, trowels, or powered cement finish tools.
12. DIG
- Dig and prepare ground for pouring concrete.
- Dig footings, janitorial duties as well.
13. Retaining Walls
- Finish concrete structures such as sidewalks, retaining walls, and driveways.
- Construct and pour retaining walls inside basements; form and pour outside concrete retaining walls to resist the lateral pressures.
14. Shovels
- Direct the casting of the concrete and supervise laborers who use shovels or special tools to spread it.
- Direct the casting of the concrete and supervise laborers who use shovels or special tools to spread it.
15. BOB Cat
- Formed concrete walls, finished concrete floors, and operated heavy equipment such as excavators, bob cats and fork lifts
- Operated Bob Cat, Damper, Pavement Saw, Vibrator and Chip hammer.
5 Cement Finisher resume examples
Build a professional cement finisher resume in minutes. Browse through our resume examples to identify the best way to word your resume. Then choose from 5+ resume templates to create your cement finisher resume.
What skills help Cement Finishers find jobs?
Tell us what job you are looking for, we’ll show you what skills employers want.
List of cement finisher skills to add to your resume

The most important skills for a cement finisher resume and required skills for a cement finisher to have include:
- Sidewalks
- Finishers
- Construction Sites
- Smooth Surfaces
- Expansion Joints
- Rebar
- Bull Float
- CDL
- Screeds
- Concrete Structures
- Trowels
- DIG
- Retaining Walls
- Shovels
- BOB Cat
- Construction Projects
- Power Grinders
- Jointers
- Caulking
- Rakes
- Formwork
- Straight Edge
- Building Forms
- Safety Rules
- Drill Holes
- Position Truck
- Construction Equipment
- Tie Steel
- Patch Voids
- DUG
- Concrete Saws
- Excavations
- Concrete Pours
- Cement Mixers
- Tampers
- Restore Surface
Updated January 8, 2025