FIND PERSONALIZED JOBS
Sign up to Zippia and discover your career options with your personalized career search.
Sorry, we can't find that. Please try a different city or state.

Master Scheduler

This job has expired and is no longer available.
APPLY NOW
Apply Now
×
FIND
PERSONALIZED JOBS

Sorry, we can't find that. Please try a different city or state.

CONTENT HAS
BEEN UNLOCKED
Close this window to view unlocked content
or
find interesting jobs in

Log In

Log In to Save

Sign Up to Save

Sign Up to Dismiss

Sign Up

SIGN UP TO UNLOCK CONTENT

or

The email and password you specified are invalid. Please, try again.

Email and password are mandatory

Forgot Password?

Don't have an account? Sign Up

reset password

Enter your email address and we will send you a link to reset your password.

Back to Log In

Log In

Log In to Save

Sign Up to Save

Sign Up to Dismiss

Sign up to save the job and get personalized job recommendations.

Sign up to dismiss the job and get personalized job recommendations.

or

The email and password you specified are invalid. Please, try again.

Email and password are mandatory

Already have an account? Log in

reset password

Enter your email address and we will send you a link to reset your password.

Back to Log In

Company Saved

Answer a few questions and view jobs at that match your preferences.

Where do you want to work?

Job Saved

See your Saved Jobs now

or

find more interesting jobs in

Job Dismissed

Find better matching jobs in

Your search has been saved!

Top 50 Master Scheduler Skills

Below we've compiled a list of the most important skills for a Master Scheduler. We ranked the top skills based on the percentage of Master Scheduler resumes they appeared on. For example, 8.4% of Master Scheduler resumes contained Production Capacity as a skill. Let's find out what skills a Master Scheduler actually needs in order to be successful in the workplace.

These are the most important skills for a Master Scheduler:

1. Production Capacity

demand arrow
high Demand
Here's how Production Capacity is used in Master Scheduler jobs:
  • Create the manufacturing Master Schedule based on multiple site customer delivery requirements, production capacity and scheduling constraints.
  • Maintained integrity of master production schedule based on customer demand and forecast while assuring production capacity availability.
  • Developed in-depth experience in effective management of tight schedules due to limited production capacity and high demand.
  • Reviewed material availability and evaluated production capacity to ensure level production flow.
  • Verify production capacity, demand, and make production recommendations.
  • Managed Monthly Production Capacity Calculations 4.
  • Planned and coordinated what product should be built to build based customer need, production capacity and material availability.
  • Utilize the production capacity, taking into consideration the sales forecast, historical sales, and new business opportunities.
  • Plan and establish production work schedules to meet delivery time that best utilize company production capacity.
  • Develop the daily production schedule, using customers demand that met production capacity and shipping commitments.
  • Create and maintain Master Schedule for material and production capacity in order to satisfy customer.
  • Provide schedule based on raw material lead times & production capacity.
  • Developed replenishment strategies using Transfer orders to replenish stock of Finished Goods for quick shipment during times of limited production capacity.
  • Processed all incoming orders, monitoring production capacity levelsusingSAP and excel spreadsheets.
  • Reviewed, and adjusted daily production capacity based on incoming demand.
  • Evaluate production capacity and produce revenue forecasts for the Drilling plant using Primavera P6.

Show More

7 Production Capacity Jobs

No jobs at selected location

2. MRP

demand arrow
high Demand
Here's how MRP is used in Master Scheduler jobs:
  • Scheduled company-wide fabrication, assembly and subcontractors and performed planning implementation using Oriole Respond and MRP II software.
  • Responded to forecast and demand requirements in MRP II system and coordinated with manufacturing, sales, and engineering support.
  • Provided master schedule updates and worked closely with Site Manager and other senior staff on MRP reports and data.
  • Maintained and updated the Vantage Material Requirements Planning (MRP) system data according to the analysis results.
  • Execute order processing from MRP output by timely release of purchase orders and work orders.
  • Performed regular MRP system maintenance and audit to ensure system accuracy and data quality.
  • Developed and performed the MPS/MRP at SAP R/3 system for assigned Brand Product.
  • Ensured MRP explosion to proper component level, update item attributes as required.
  • Purchased all material, colorant, components, and packaging using JBA MRP.
  • Used SAP MRP to maintain inventory through transaction postings and cycle counts.
  • Put into practice the proper procedures for MRP supply/demand and exception signals.
  • Performed master scheduling functions utilizing an MRP system for 3 product lines.
  • Refined MRP system to help achieve 90% on time delivery.
  • Loaded and generated the MRP, working closely with the Buyers.
  • Maintained component planning and ordering parameters in MRP system.
  • Create master schedule for Service Department with QAD MRP.
  • Utilized MRP system to determine monthly Master Schedules.
  • Led manufacturing team during implementation of MRPII software system, resulting in a less than 10 month cutover.
  • Initiated and maintained Excel based MRPs for development products not yet supportable by Oracle.
  • Bill of Material verification for raw materials with variance between Cycle Count and MRP system Routing verifications as needed.

Show More

5 MRP Jobs

No jobs at selected location

3. Project Management

demand arrow
high Demand
Here's how Project Management is used in Master Scheduler jobs:
  • Developed data collection process to gather information across Research and Development, Field Engineering, and Project Management operations.
  • Rendered strategic project planning and scheduling to support business and project management projects under a government contract.
  • Project Management: Examined policy issues and strategic planning and conducted analyses of wide-ranging complex issues.
  • Develop project management maturity including policies, procedures and training.
  • Communicated completion date expectations to sales and project management departments.
  • Communicate material issues with Project Management.
  • Work with project management and sister company to ensure we have all the appropriate demand signals in place to order parts.
  • Slashed $2 million in program costs by managing with Concerto, a critical chain project management based software program.
  • Performed as Subject Matter Expert for use of MS Project, integration of Program plan, Project Management Methodology
  • Supported Manufacturing, Engineering, Quality Assurance, Purchasing, and Project Management to solve complex problems.
  • Supported Project management team in various reviews including audits performed by GAO and various oversight groups.
  • Worked with IT Manager to introduce new system modules for Purchasing, Inventory and Project Management.
  • Define, Design, and Plan - Project Management and Resource Planning - Master Scheduler.
  • Communicate to Sales and Project Management any scheduling issues and recovery plan to satisfy demand.
  • Converted planning from Project Management to MRP driven requirements using JD Edwards ERP.
  • Possess a strong understanding of project management concepts and MS Project software.
  • Interfaced with Project Management, Purchasing, Engineering, and Production teams.
  • Train and develop project management employees.
  • Create and manage multiple discreet and Level of Effort production schedules utilizing EPM (Enterprise Project Management) techniques.
  • Develop and conduct training on MS Project, Kanban and Lean Project Management.

Show More

16 Project Management Jobs

No jobs at selected location

4. Customer Service

demand arrow
high Demand
Here's how Customer Service is used in Master Scheduler jobs:
  • Coordinated with customer service representatives and engineering on job scheduling from initial orders through shipping.
  • Ensured that Master Production Schedule supported approved production inventory plan with focus on customer service.
  • Minimized cost of parts and maintain minimum/maximum inventory levels while optimizing Customer Service.
  • Received Special Recognition Award for exemplary customer service on mobile applications program.
  • Improved customer service level from 73% to 98.5% through ongoing plant-wide continuous improvement efforts and implementation of operational initiatives.
  • Work closely with sales, customer service, and directly with customers in order to fulfill the customer's needs.
  • Interacted daily with sales, customer service, manufacturing, materials, engineering, and shipping and receiving departments.
  • Interfaced with customer service, production and purchasing (material) department to expedite orders per customer immediately requests.
  • Offer customer service to satisfy demand and ensure availability of resources (raw material and capacity for production).
  • Produced and managed the Aftermarket parts forecast to meet a 95% customer service level.
  • Worked with customer service to prioritize orders and manage daily backlog reports.
  • Work with other departments and customer service to meet daily requirements.
  • Managed inventory level to fulfill customer service level of 95 percent.
  • Work with customer service to ensure customer changes are best met.
  • Achieved 98% + customer service levels across five brands.
  • Work closely with customer service to ensure timely deliveries.
  • Communicate promise date to customer service and production.
  • Provide customer service for other Faurecia locations, such as Franklin Ohio, Taylor Michigan, and Louisville Kentucky.
  • Provide feedback in a timely manner to customer service regarding the ability to meet the requested changes.
  • Create and schedule production orders Monitor existing inventory and incoming inventory Coordinate with production, purchasing, customer service and clients

Show More

3 Customer Service Jobs

No jobs at selected location

5. Inventory Control

demand arrow
high Demand
Here's how Inventory Control is used in Master Scheduler jobs:
  • Value stream management from order entry through final shipping Inventory Control Production Scheduling BOM maintenance Supplier management and expediting
  • Managed inventory control and materials production flow for complex production projects involving thousands of aerospace parts.
  • Supervised Material Planning & Inventory Control function responsible for planning multiple, major government/military programs.
  • Implemented and managed an excess inventory control system and provided ongoing project analysis.
  • Implemented an inventory control process and an inventory accuracy measurement plan.
  • Organized and lead inventory control audits and year-end physical inventory.
  • Trained material handling and inventory control personnel on process.
  • Hired as an Accounts Payable Clerk, but quickly moved into Receiving Clerk and promoted to Inventory Control and into Scheduling.
  • Analyze and identify requirement patterns to take advantage of cost savings through sourcing techniques along with inventory control.
  • Developed and maintained custom database for material planning, forecasting, inventory control and improved SO shipping.
  • Master Scheduler Perform all production and inventory control functions for the entire wireless product line.
  • Managed the analysis and reporting of inventory, production plans, scheduling and inventory control.
  • Managed all direct material scheduling, inventory control for the molding and assembly departments.
  • Created and maintain inventory control system, created SOP for each machine.
  • Complete inventory control of turns, cycle counts/adjustments, ending inventories.
  • Coach and mentored Planning and Inventory Control staff
  • Inventory Control Manager, MRP trainer.
  • Inventory Control, Production Control.
  • Answer and received calls concerning customer orders and dates dispatched Inventory control over finished items produced.
  • Involved in entering work orders and schedules for shop employees Effective inventory control and training other personnel.

Show More

1 Inventory Control Jobs

No jobs at selected location

Job type you want
Full Time
Part Time
Internship
Temporary

6. Raw Materials

demand arrow
high Demand
Here's how Raw Materials is used in Master Scheduler jobs:
  • Perform Demand Trends Analysis and evaluate its consequences on E&O Itemization on FG's, Raw Materials and Components.
  • Procured $13 million annually in raw materials that included steel and other metals, graphite, and paper facings.
  • Managed staff of raw materials planning, internal production and outside purchased product master schedulers, analysts and administrators.
  • Set up MPS functionality in SAP to calculate manufacturing lead times, capacity, raw materials and production.
  • Arranged and accelerated the flow of component parts and raw materials according to the plants needs and priorities.
  • Assisted with Purchasing of raw materials from China and local vendors along with plant and maintenance parts.
  • Purchased raw materials needed for the production area as well as finished goods for our distribution center.
  • Requisitioned raw materials and vendor processes, as required to support schedule and maintain desired inventory levels.
  • Establish lead times for Finished Goods Assemblies and raw materials to ensure accuracy of ATP within Oracle.
  • Record production data, including volume produced, consumption of raw materials, and quality measures.
  • Determined manpower, equipment, and raw materials needed to cover production demand on daily basis.
  • Calculate resulting requirements for raw materials, purchased parts and packaging supplies based on MRP methodology.
  • Review, monitor finish good as well as purchase raw materials form domestic and overseas vendors.
  • Planned, scheduled and receipted raw materials for 100 million cast pounds/year facility.
  • Lead team to reduced MOH Raw Materials levels from 5 to 1 E.O.Q.
  • Scheduled all contract production and procurement of raw materials and support items.
  • Procured packaging materials, raw materials, and labels.
  • Order all raw materials for plant wide use.
  • Generated NCMs for the raw materials used in the department.
  • Expedited raw materials and directed interplant finished good shipments to keep inventory costs within budgeted goals.

Show More

1 Raw Materials Jobs

No jobs at selected location

7. New Product Development

demand arrow
high Demand
Here's how New Product Development is used in Master Scheduler jobs:
  • Scheduled production factoring in work orders, maintenance, new product development, equipment availability and capacity.
  • Support new product development through cooperative scheduling of model introductions and prototypes.
  • Coordinated and participated in meetings to discuss new product development and scheduling.
  • Interfaced with engineering to support introduction of new product development.
  • Support in-house manufacturing and new product development.
  • Interfaced with engineering to support introduction of new product development as well as document changes in the Bill of Materials.
  • Worked directly with Nabisco product managers on new product development including R&D trials and production validation.
  • Assigned item numbers for new lab and production trials in coordination of new product development.
  • Work with Engineering on new product development for material demand.
  • Represented Materials Group on New Product Development Teams.

Show More

8. Production Schedules

demand arrow
high Demand
Here's how Production Schedules is used in Master Scheduler jobs:
  • Key operations team member accountable for developing daily and weekly production schedules linking daily production quantities to daily customer demand.
  • Create and maintain daily production schedules to ensure efficient utilization of production machinery while maintaining customer requirements.
  • Maintained and distributed daily and weekly production schedules.
  • Arrange for delivery, assembly, and distribution of supplies in order to expedite flow of materials and meet production schedules.
  • Plant closed * Developed master production schedules to improve on-time deliveries from 65% to 100%.
  • Work with management to reduce inventory levels and create JIT (Just In Time) production schedules.
  • Developed the Master Production Schedules for the Air Data Product line of over 200 products.
  • Managed daily production schedules and ordered raw material for Electronic Fuel Injection and Manifold teams.
  • Managed and maintained accuracy of the Master production schedules for all production lines.
  • Develop weekly production schedules for Toyota and Honda product lines.
  • Managed material and production schedules to ensure on time delivery.
  • Evaluate production plans and complete daily production schedules.
  • Distribute production schedules or work orders to departments.
  • Plan and establish effective production schedules.
  • Translate Sales forecasts into production schedules using defined planning parameters Work with Production area and track daily adherence.
  • Developed daily production schedules, measured performance and ontime delivery.
  • Create Production schedules based on customer EDI for all Faurecia's Gladstone Plant's mufflers and GM production lines.
  • Analyze MRP Data Reports to create weekly production schedules based on requirements and capacities.
  • Develop master production schedules based on sales forecast, manufacturing constraints and cGMP's.
  • Prioritized production schedules to reduce set-up costs by marrying up items with like routings.

Show More

8 Production Schedules Jobs

No jobs at selected location

9. ERP

demand arrow
high Demand
Here's how ERP is used in Master Scheduler jobs:
  • Evaluate data inclusive of enterprise requirements for planning information.
  • Maintain level and efficient capacity loads through all work centers, utilizing resources and tools in the ERP system.
  • Generated $20,000 savings per year by implementing Quality Module of Visual ERP Enterprise Resource Planning.
  • Implemented and improved business processes related to Enterprise Resource Planning (ERP) and Master Scheduling.
  • Maintain customer planning/release information via manual release, EDI or fax into ERP System.
  • Selected as key member of pilot team for year-long implementation of Oracle ERP system.
  • Used SAP R/3 ERP version 4.6 to assist in the planning and scheduling process.
  • Assist Enterprise Directorate in developing Master Schedule and assist with its stand up.
  • Interfaced with SAP consultants and was member of global SAP ERP implementation team.
  • Managed MRP planning module and assisted in planning/ resolving ERP system issues.
  • Input configuration, BOM, build plan into SAP ERP system.
  • Utilized SAP/ERP software, MS Office applications and MRP planning software.
  • Trained five plant schedulers on the use of ERP system.
  • Migrate schedules to MS Project 2013 Enterprise Server environment.
  • Project manager for implementation of the new ERP solution.
  • Develop and maintain NGA Enterprise IT/IS schedule.
  • Provided monthly feedbacks from counterpart of the external customer so that issues arising from the project schedule are easily resolved.
  • Direct reports: None Accomplishments: Initiated use of MPS and Cycle Counting, improved use of ERP in planning.
  • Create and maintain all routings, Implement Oracle ERP solutions.
  • Assist Transition of Primavera Enterprise Integration with SAP.

Show More

21 ERP Jobs

No jobs at selected location

10. Customer Orders

demand arrow
high Demand
Here's how Customer Orders is used in Master Scheduler jobs:
  • Generate and maintain daily master production schedule based on released customer orders.
  • Scheduled customer orders, developed and managed production forecasts.
  • Worked with plant schedulers at three manufacturing facilities to manage short term/long term capacities to minimize any delay of customer orders.
  • Generated, maintained and controlled the Master Schedule based on marketing forecast, shipping projections, customer orders and available resources.
  • Modified daily consumption of MRP by distribution site and made adjustments to ensure customer orders were met on time.
  • Master Scheduler - Advanced Forming Technology - Scheduled day to day production from customer orders to final shipments.
  • Determined the impact of daily customer orders and adjusted the Daily production schedule to ensure maximum order fulfillment.
  • Managed the fulfillment of customer orders from the time of entry to the delivery of the product.
  • Monitor changes to customer orders/forecasts, and their potential impact to the master production schedule.
  • Set Up visual scheduling boards for plant production on customer orders and provide training.
  • Conducted weekly cross-functional team meetings to assess capacity needs to meet customer orders.
  • Created detailed master schedules based on forecast and actual customer orders.
  • Planned & scheduled customer orders on up to 9 extrusion lines.
  • Managed demand flow of customer orders into the production plan.
  • Enter and manage customer orders into a master schedule.
  • Managed MPS and prioritized critical customer orders and demand.
  • Schedule customer orders and enter into the Master Schedule.
  • Manage all customer orders by working closely with the supply chain and sales teams to provide best possible production ship dates.
  • Assigned delivery dates daily to customer orders for the plastic material handling equipment end of this multimillion dollar company.
  • Schedule customer orders to meet their required deliver date and notify customer service of any issues meeting dates.

Show More

2 Customer Orders Jobs

No jobs at selected location

11. Safety Stock Levels

demand arrow
high Demand
Here's how Safety Stock Levels is used in Master Scheduler jobs:
  • Designed master production plan stemming from accepted recommendation of ordering policies, safety stock levels, and observing rough-cut capacity.
  • Defined and established safety stock levels to maximize corporate investments while mitigating risk associated with excess and obsolete inventory.
  • Recommend and establish safety stock levels that are required to stabilize production and ensure on-time delivery to customers.
  • Managed delivery of finished inventory to affiliates based on market needs and safety stock levels.
  • Developed and established statistical safety stock levels for selected critical product groups.
  • Review sales history and inventory turnover to forecast safety stock levels.
  • Perform Inventory Management processes to ensure Safety stock levels.
  • Educated employees on inventory management techniques, including lot sizing, developing proper safety stock levels, and forecasting.
  • Calculated safety stock levels based on rolling sales analysis to ensure that the correct product mix is achieved.
  • Calculated and set up safety stock levels - reducing on hand inventory by over $250,000.
  • Coordinate production with EDI demand and safety stock levels to maintain customer requirements.
  • Established minimum runs and safety stock levels in the MRP/ERP database.
  • Load the forecast and establish safety stock levels for all products.
  • Determined lot sizes and safety stock levels based on customer usage.
  • Review material shortages, stock outages, and safety stock levels.
  • Manage the finished goods and safety stock levels.
  • Maintain safety stock levels on finished goods.
  • Manage the safety stock levels.

Show More

3 Safety Stock Levels Jobs

No jobs at selected location

12. Critical Path Analysis

demand arrow
high Demand
Here's how Critical Path Analysis is used in Master Scheduler jobs:
  • Updated status of activity completion and employed critical path analysis and other scheduling techniques to assess schedule performance.
  • Performed Critical Path Analysis and communicated results to project team and program managers.
  • Established critical path to major program milestones and performed critical path analysis.
  • Performed critical path analysis to identify critical tasks.
  • Performed value-added schedule analysis and critical path analysis.
  • Performed critical path analysis and global what-if analysis.
  • Run critical path analysis (CPM) on fully networked schedules and provided Monthly analysis in support of projects execution.
  • Provided critical path analysis to Project Management Team (PMT) to assist in risk analysis and decision making.
  • Perform critical path analysis for various projects and the effects of any deviation the go live date.
  • Maintained status and updates to schedule, performed critical path analysis and prepared and implements work-around plans.
  • Conduct critical path analysis and work closely with the IPT to manage tasks and work flow.
  • Modified the nine existing schedules being used by adding logic to facilitate critical path analysis.
  • Performed Critical path analysis identifying issues and work with team to provide solutions and workarounds.
  • Performed weekly critical path analysis, schedule reviews, and schedule health metrics.
  • Performed Critical Path Analysis and reported results to Project Team.
  • Perform critical path analysis and provide feedback to key internal stakeholders regarding potential impact to overall program deliverables.
  • Created monthly and ad-hoc critical path analysis and risk management.

Show More

25 Critical Path Analysis Jobs

No jobs at selected location

13. Logistics

demand arrow
high Demand
Here's how Logistics is used in Master Scheduler jobs:
  • Improved facility performance in Germany and Tunisia by comprehensively analyzing logistics processes and fully restructuring plant operations through Lean/Six Sigma methodologies.
  • Coordinated activities to support manufacturing, including logistics * Diversified customer base resulting in increased annual sales * ISO9001 Internal Auditor
  • Provided assistant to other managerial level in Supply Chain and Logistics department.
  • Increased efficiency by streamlining and simplifying logistics tasks.
  • Directed production scheduling, logistics controls, and safety and environmental compliance activities for a world leader in foam manufacturing.
  • Implemented safe work practices and ensured compliance with OSHA, DOT and RB Safety and Regulations to all logistics operations.
  • Generated capacity plan, forecasts, production build schedule, steel finish inspection, logistics, and delivery of products.
  • Monitor material inventories, track progress of production and resolve any logistics, procurement, supplier and manufacturing constraints.
  • Single point of contact for production scheduling resolving any procurement, logistics and supplier or manufacturing constraints.
  • Involved rerouting logistics through port strikes another other unexpected issues to protect customer without impact.
  • Managed scheduling, planning, and logistics, providing exceptional service to customers.
  • Direct product distribution and logistics from 3 manufacturing plants into 4 distribution centers.
  • Master Scheduler for Lightning division and key SAP user for Logistics Department.
  • Seek help from the logistics department if there are any issues.
  • Maintain, update, and implement changes to logistics management software.
  • Action Registers and PBL (Performance Based Logistics).
  • Communicate with Logistics team form all Customer shipments.
  • Freight logistics pricing & arrangement.
  • Maintain statues reports for upper management Schedule shipments of finished product Coordinate with outside logistics company in arranging shipments
  • Supported back-end logistics process (warehousing, kitting, cycle counting, Kanban replenishment.

Show More

3 Logistics Jobs

No jobs at selected location

14. Customer Requirements

demand arrow
high Demand
Here's how Customer Requirements is used in Master Scheduler jobs:
  • Optimize process efficiency through integration of activities of the operations functions and assets to maximize capacity and meet customer requirements.
  • Lead the Materials Manufacturing Department in providing quality product on time to meet both internal and external customer requirements.
  • Generated and maintained production schedules to meet customer requirements while maximizing profitability through effective equipment and staffing utilization.
  • Communicate to Materials and Manufacturing when customer shipments must be changed to meet customer requirements.
  • Integrated activities to optimize process efficiency, maximize available capacity, and satisfy customer requirements.
  • Develop and implement data input process to transition customer requirements into company ERP system.
  • Detail Scheduled daily Mill production to meet both internal and external customer requirements.
  • Maintained materials, components, and equipment to satisfy customer requirements.
  • Support customer requirements and service level objectives and inventory targets.
  • Instituted Best Practices encompassing customer requirements.
  • Maintain inventory levels to customer requirements.
  • Planned weekly production schedules, coordinating with plant leadership to counter challenges in order to meet changing customer requirements.
  • Managed product allocation to multiple sites to effectively support customer requirements, meeting short and long term goals.
  • Analyze, create and balance build schedules, ensuring customer requirements are met based on fluctuating releases.
  • Supervised and trained three union employees responsible for picking, packing and shipping customer requirements.
  • Create a weekly and daily schedule for production to meet customer requirements.
  • Modified changes to Bill of Materials as needed to support customer requirements.
  • Produced over 25000 individual work orders per year to support customer requirements.
  • Led meetings with Customer Service and Purchasing representatives to expedite production orders to meet new customer requirements.
  • Maintained customer requirements for electronic communication and oversaw compliance with customer traffic routings.

Show More

15. Customer Demand

demand arrow
average Demand
Here's how Customer Demand is used in Master Scheduler jobs:
  • Analyzed and satisfied customer demand and delivery requirements via web-based order management, system access and direct customer interface.
  • Developed and maintained master production schedules based on marketing, customer demands and manufacturing constraints for custom packing machinery.
  • Create a master production schedule that satisfies customer demand while maintaining optimum inventory levels, and resource utilization.
  • Developed a monthly master production schedule which satisfied customer demand while carrying minimum levels of inventory.
  • Analyzed customer demand and maintained accurate production schedules, within capacity constraints.
  • Review customer demand and requirements and forecast demand.
  • Coordinated the production process to meet customer demand receive dates by closely working with purchasing, plant management and sales force.
  • Assist in raw material acquisition for parts needed in time to meet customer demand and still keep inventory costs down.
  • Develop short-term and long-term production plans for $84 million office board manufacturer in order to meet customer demand.
  • Created and managed Master Production Schedule in support of customer demand, sales forecast and established finished goods levels.
  • Participated in the purchasing process for assigned commodities in support of the plant schedule and customer demand.
  • Fulfilled customer demand and on time delivery requirements for quality products in support of the sales plan.
  • Convert MPS into Production Schedules in order to meet customer demand and maintain set stocking levels.
  • Generated a monthly Full MRP run and weekly selective MRP runs to include customer demand changes.
  • Created the master schedule incorporating customer demand, forecast data and the production plan.
  • Monitor and maintain inventory of spec stock based on past and current customer demand.
  • Work with Production on daily and weekly priorities to meet customer demand.
  • Analyze historical data and current customer demand by products line.
  • Analyze customer demand and review capacity to level load production.
  • Coordinated with buyers to ensure subassemblies and component parts were accounted for production and shipped in accordance with customer demand.

Show More

22 Customer Demand Jobs

No jobs at selected location

16. Production Planning

demand arrow
average Demand
Here's how Production Planning is used in Master Scheduler jobs:
  • Managed majority of application-specific integrated circuit (ASIC) master scheduling and production planning activities with overseas-owned manufacturing facility.
  • Assisted in designing and implementing master scheduling criteria for a new production planning computer system.
  • Report on production planning status with historical metrics to identify trends and propose suggested adjustments.
  • Managed production planning, forecasting, inventory management, performance measurement, and reporting.
  • Presented information and recommendations to upper management on production planning and capacity issues.
  • Directed Production Planning function for headquarters facility.
  • Support S&OP process by analyzing the site capacities and developing production planning through RCCP (using ESOP).
  • Used SAP Advanced Planner and Optimizer (APO), Production Planning and Detailed Scheduling (PP/DS) modules.
  • Coordinated with Singapore Supply Planning, Production Planning, and Engineering to stabilize and maintain production schedule compliance.
  • Streamlined production planning dept reducing weekly overtime to a minimum of 5 hours from 20-25.
  • Trained personnel in all aspects of production planning, master scheduling, and shipping.
  • Worked in the production planning division with responsibilities in both production and shipping areas.
  • Managed the Master Scheduling role for production planning at 330,000+ annual ton facilities.
  • Worked heavily with Contracts, Marketing, Production Planning and Control.
  • Direct Supervision of 5-member Production Planning & Purchasing Team.
  • Managed Plant Production Planning, Purchasing and Logistics teams.
  • Trained and developed the production planning staff.
  • Implemented SAP/ERP system planning module for Production Planning Department and converted legacy MRP data.
  • Established company's 1st production planning team, including conducting all team-member trainings.
  • Developed "mini" MPS program for capacity and production planning and eliminated need for full MRP runs.

Show More

21 Production Planning Jobs

No jobs at selected location

17. IMS

demand arrow
average Demand
Here's how IMS is used in Master Scheduler jobs:
  • Coordinate and incorporate into the IMS any engineering design refinements or rework efforts incurred during product development.
  • Coordinated with major suppliers and partners to collect and deliver schedule information related to, and integrated with, the IMS.
  • Coordinated solicitation of schedule status with schedulers to acquire accurate status updates and schedule changes to be prepared within the IMS.
  • Review IMS updates performed by other PMMI IMS team members to ensure accuracy and contribute recommendations to improve the documents.
  • Develop an Integrated Master Schedule (IMS) with networked, detailed tasks necessary to ensure successful program execution.
  • Incorporate contractual and programmatic changes into the IMS in order to maintain realistic, Current contract schedule baselines.
  • Align IMS with SAP production schedules to include tasks, logic, and lag and lead times.
  • Manage freight claims department and engineering to develop better packaging based off of trending claims.
  • Integrate schedule revisions provided by the project teams into the IMS Team master IMS documents.
  • Developed training curricula, new methodologies, tools, financial reports, IMS/IMP and documentation.
  • Receive Class A JIMS and Traffic Orders from Customer and distribute to correct personnel.
  • Obtained status updates from Program Control Analysts and integrated status into the IMS.
  • Identify tasks, dependencies and relationships between projects for IMS schedule build out.
  • Integrated Baseline Change Requests (BCR) into the IMS.
  • Provided status of the IMS for monthly reporting.
  • Performed schedule health analysis on the IMS.
  • Recovered over $500,000 in freight claims.
  • Created resource loaded baselined detailed technical schedules for inclusion into the IMS.
  • Meet monthly CDRL requirements for IMS submittals for each program.
  • Create and maintain detailed IMS for military engines production.

Show More

25 IMS Jobs

No jobs at selected location

18. Kanban

demand arrow
average Demand
Here's how Kanban is used in Master Scheduler jobs:
  • Coordinated between capacity planning constraints and sales and operations planning of KanBan customers requirements.
  • Set up KanBan replenishment policies.
  • Designed, implemented and monitored successful kanban program EXPEDITOR, Federal Standard Corporation, Minneapolis, Minnesota.
  • Worked closely with a lean manufacturing consultant to implement lean manufacturing principles and to develop Kanbans.
  • Utilize Kanban and lean manufacturing techniques to increase organizational performance.
  • Introduced Lean principles in injection molding (Kanban Presses) to improve change over times by 27%.
  • Created kanban of finished good rubber sheeting for a 2 day delivery to customers.
  • Created new scheduling format involving eKanban for successful scheduling of new product lines.
  • Develop a Kanban system to support the 80/20 rule for all product lines.
  • Increased WIP turns through vendor Kanban systems and Lean material flow.
  • Lead the implementation of a pull system (Kanban).
  • Trained all Planner / Buyers on Dynamic Kanban Techniques.
  • Developed and implemented the Standard Work for Kanban Calculators.
  • Created Kanban cards used by associates to re-order parts.
  • Helped develop a working Kanban system.
  • Managed Finished Goods Kanban Levels 3.
  • Calculated inventory levels (Kanbans) for cabinet components in order to balance inventory levels to forecasted demand.
  • Improved kanban process through implementation of zip-line scheduling boards, updating of kanban procedures and development of a kanban database.
  • Monitor Kanban level for Lennox Mfg.
  • Implemented Kanban manufacture for OEM's Freightliner, Navistar, Peterbilt, and Volvo

Show More

19. BOM

demand arrow
average Demand
Here's how BOM is used in Master Scheduler jobs:
  • Team Leader for the MPS/MRP, WIP, BOM, and Inventory modules of the Oracle manufacturing applications implementation team.
  • Design and Maintenance of Item Masters, BOM's, and Routers for all product lines.
  • Updated bill of material (BOM), routing specifications, per new design, rev.
  • Developed project status reports for both Bombardier and SEPTA management using P3 and Excel.
  • Enhanced techniques for trouble shooting MRP and Data port Problems, live BOM audits.
  • Evaluate BOM for all products prior to first build and pinpointing areas of concern.
  • Create Configured Bills of Material to drive Materials prior to actual BOM upload.
  • Review BOM structures for cost accuracy working close with engineering and purchasing.
  • Compiled Bombardier portion of monthly invoice to NJT from cost-loaded P3 schedule.
  • Handle multiple component & BOM revisions simultaneously, phase material in/out.
  • Maintained all traceable hardware to print and BOM/MOT Specification's.
  • Maintain proper part profiles and provide input to BOM Structure.
  • Communicate with engineering on all BOM discrepancies.
  • Maintained BOM data on MAPICS.
  • Reviewed BOMs for accuracy and when necessary, notified Engineering Services and/or manufacturing of potential inaccuracies or problems.
  • Provided Bombardier portion of monthly Primavera schedule updates and progress narratives to New Jersey Transit developed jointly with LLC partner Bechtel.
  • Created planning BOMs to support complex, configurable, and customized capital equipment solutions.
  • Created planning BOM's to cover the highly configurated, Engineer and build to order modular equipment.
  • Key Accomplishments: Reviewed and corrected BOMs regularly to ensure material consumption was being correctly utilized.
  • Reviewed BOMs and ECNs for new design or production build.

Show More

2 BOM Jobs

No jobs at selected location

20. Capacity Planning

demand arrow
average Demand
Here's how Capacity Planning is used in Master Scheduler jobs:
  • Provided recommendations to resolve capacity issues through use of rough-cut and detailed capacity planning.
  • Establish factory schedules through capacity planning and setting customer priorities with Regional Marketing.
  • Managed Capacity Planning System with responsibility for balancing workload and adjusting resources.
  • Developed five-year sales forecasts for plant production, business and capacity planning.
  • Develop material forecasting and capacity planning models.
  • Attended capacity planning department meetings.
  • Project lead for plant labor reporting system: Set up employee identification, work cells and capacity planning parameters.
  • Reduced LTPO from approximately 10% of sales to less than 2% through on-time starts and capacity planning.
  • Utilized rough-cut capacity planning for the monthly production schedules, and shop floor control for the daily priorities.
  • Create production schedules, work orders and capacity planning to determine personnel, material requirements and material priorities.
  • Provide leadership in the development of Level Load monthly production packages and manage production constraints and capacity planning.
  • Assist in capacity planning of production lines to maintain material flow and 100% on time delivery.
  • Helped to create and train users on custom shortage reports and capacity planning tools.
  • Developed a capacity planning and level schedule approach to loading the production demand.
  • Conduct rough cut capacity planning prior to publish the master schedule.
  • Performed capacity planning studies for all 3 phases of production operations.
  • Conduct rough cut capacity planning for all assets.
  • Master Scheduled/Capacity Planning and management of the entire production Scheduling System for multi plant locations which include all outside processing functions.
  • Manage parts capacity planning in-house vs. subcontract Manage forecast and reorder points (ROP) for Aftermarket Group.
  • Developed capacity planning modelling tool for factory now used throughout Coty world-wide.

Show More

12 Capacity Planning Jobs

No jobs at selected location

21. Production Control

demand arrow
average Demand
Here's how Production Control is used in Master Scheduler jobs:
  • Promoted throughout career to Materials Manager, Purchasing Manager and Production Control Manager.
  • Represented production control department at operational and management meetings.
  • Initiated the Master Scheduling/Production Control Department.
  • Performed production control and operations planning.
  • Coordinate daily production control operations.
  • Worked with program management, marketing, production control, manufacturing and supply chain to determine final master production schedule.
  • Involved development of customer service and production control reporting procedures, Master Scheduling, and training of plant personnel.
  • Control all facets of production control including: new part introduction, external (Outside) processes.
  • Served as Area Manager for Production Control, Outside Processing, Dispatch, and Shipping.
  • Managed 15 production control associates and purchased raw materials for tier 1 automotive supplier.
  • Maintain daily sheet metal and build sheets to system personnel and production control unit.
  • Work within Production Control and other functional groups to ensure internal goals met.
  • Developed reports and work aids to assist shop supervisors for production control.
  • Support all daily activities of the production control department and personnel.
  • Trained new production control personnel on system planning tools and procedures.
  • Provided work direction and guidance to other production control employees.
  • Supervised the daily operations of the Production Control Office.
  • Communicate production control needs to shop floor personnel.
  • Supervised the production control and planning of departments.
  • Oversee operations center with team comprising of buyers, planners, and production controllers driving annual revenues of $120M.

Show More

6 Production Control Jobs

No jobs at selected location

22. Shop Floor

demand arrow
average Demand
Here's how Shop Floor is used in Master Scheduler jobs:
  • Master scheduled both the manufacturing and packaging of all tablet products while leading a team of 8 shop floor schedulers.
  • Acted as the key interface between the shop floor and other relevant departments to ensure scheduling targets are met.
  • Managed all consumables on shop floor, created and maintain the expiration database of all consumables.
  • Ensured the routing and blueprints were correct prior to delivery to shop floor.
  • Established point of usage locations on shop floor to facilitate cycle counting
  • Instituted daily shop floor audits/cycle counts to guarantee system integrity.
  • Managed corrective actions required for all rejected shop floor material.
  • Directed production through 19 shop floor employees on three shifts.
  • Trained shop floor associates how to use the new system.
  • Created standard operating procedures for the shop floor.
  • Managed all work orders introduced to shop floor.
  • Released work orders to shop floor.
  • Communicated changes to shop floor.
  • Created the detail production routing steps, visual indicators, and provided new shop floor layouts with close proximity manufacturing steps.
  • Forecasted and planned machine centers for roll forming machinery, executed work orders to shop floor and scheduled final assembly departments.
  • Worked with Shop Floor orders, Purchase Orders, Outside Processors and Interplant transfers.
  • Master scheduled and shop floor scheduled all finished goods assembly lines.
  • Entered and maintained routings for shop floor.
  • Schedule and release orders to shop floor.
  • Train Operations Personnel on Baan Production Operations and Shop Floor Control during Business Process Re-engineering (BPR) / Baan implementation.

Show More

5 Shop Floor Jobs

No jobs at selected location

23. EVM

demand arrow
average Demand
Here's how EVM is used in Master Scheduler jobs:
  • Possess a strong understanding of Project Management concepts, EVMS, Technical Integration and System Requirements and MS Project software.
  • Track, forecast, and report program cost and earned value (EVMS) performance against the performance measurement baseline.
  • Conduct integrated analysis including schedule variance, EVM, risk, schedule status, and schedule analyses, etc.
  • Updated and produced scheduling management reports for monthly program reviews, including look ahead reports and EVMS analysis.
  • Provided cost and schedule performance management in conjunction with Earned Value Management Systems (EVMS) and methodologies.
  • Develop Earn Value Management (EVM) burn down charts to communicate schedule execution against planned baseline.
  • Implement Earned Value Management (EVM) system to track progress and maintain accurate project cost projection.
  • Integrated, analyzed and reported program performance against plan (EVMS) and supported gate process.
  • Developed IMP and IMS for implementing EVMS for the SODV Program Management Office utilizing MS Project.
  • Experience with earned value measurement (EVM) techniques in cost and schedule performance management.
  • Worked with financial analysts to drive Earned Value Management (EVM) and analyze variances.
  • Track program costs using EVMS to ensure they are in line with the budget.
  • Supported the Company's EVMS Validation effort through DCMA mock interviews and CAM mentoring.
  • Excel to spread resource-loaded hours in the project schedule for EVM calculation purposes.
  • Provided EVMS analysis of program status, monitored and maintained baseline control.
  • Prepared weekly and monthly EVM reports to NASA customers and Lockheed Management.
  • Supervised four schedulers o Managed multiple EVM schedules.
  • Analyze EVM System documentation and provide recommendations for process and procedure improvements and automations.
  • Developed, maintained and statused Integrated Master Schedule and provided EVMS metrics to the FAA Program Management Office.
  • Down loading and reporting recourse progress & timelines for upload into COBRA for EVMS reporting.

Show More

4 EVM Jobs

No jobs at selected location

24. OP

demand arrow
average Demand
Here's how OP is used in Master Scheduler jobs:
  • Monitor continuously all problem inventory, take advantage of conversion opportunities if any and recommend solutions for scrapping and potential.
  • Develop Master Production Schedule in company system to prepare requirements for purchased and manufactured parts.
  • Flow Improvement Manager - Responsible for development and implementation of operations future state vision.
  • Facilitated cross-departmental cooperation with bi-monthly group process meetings utilizing continuous improvement methodologies.
  • Identify and recommend feasible solutions to plan operational issues.
  • Participated in formulating monthly Sales and Operations Plan.
  • Develop and distribute weekly calendar.
  • Prepared rolling 20 week MPS projection, coordinating material releases from suppliers; prepared shop schedules and related metrics.
  • Develop balance between existing and future client demand needs with manufacturing and vendors to ensure completion of client requirements.
  • Developed and maintained project documentation including project plans, action items/issues logs, critical tasks and meeting minutes.
  • Prepare reports required to facilitate and suggest actions to assure optimal execution of supply chain.
  • Developed and maintained a PTO calendar for a total of 250 staff on three shifts.
  • Developed glass and packaging MPS to support market expansion into 25 new commercial accounts.
  • Published the monthly Sales and Operations report package to concerned Management staff.
  • Provided support for satellite proposals for multiple contract awards.
  • Develop quality assurance measures and systematic procedures for ensuring builder representatives have verified contract compliance on specifications.
  • Developed and implemented new planning procedure to accommodate fast-paced, ever-changing prototype orders.
  • Developed, maintained and statused Integrated Master Schedule.
  • Achieved up to $2.9MM under goal by consistently optimizing production via "What-if" analysis for year-end inventory valuations.
  • Authored a War Room with process boards that gave strategic overviews of all units and development in process.

Show More

11 OP Jobs

No jobs at selected location

25. Material Requirements

demand arrow
average Demand
Here's how Material Requirements is used in Master Scheduler jobs:
  • Issue production purchase orders, manage material requirements, and confirm co-packer schedules while considering capacity restrictions.
  • Loaded forecast to Oracle and created corresponding Master Demand Schedule/Master Production Schedule/Material Requirements Plan.
  • Directed Procurement Group with material requirements based on Forecasts and New Product Introduction.
  • Plan production and generate material requirements for finished assemblies, materials and inventory.
  • Manage material requirements to meet scheduled production demands while considering capacity restrictions.
  • Coordinated MPS for product families in conjunction with component material requirements.
  • Promoted from Material Requirements Buyer/Planner to Master Scheduler.
  • Run MRP (Material requirements planning) weekly, if needed, along with associated reports, aide in balancing.
  • Submit material requirements to purchasing three to four weeks out assuring product availability at point of use as scheduled.
  • Maintain new program schedules by coordinating material requirements with the buyer; inspection and testing are properly scheduled.
  • Assist buyers with the verification and the validation of their MRP reports and suggested future material requirements.
  • Worked closely with customers to map the required business processes and material requirements for new product introduction.
  • Maintained status of the New Products master schedule in Excel and entered material requirements into MRP.
  • Team Lead that wrote process that moved this Division into a Material Requirements Planning environment.
  • Provided what if scenario Material Requirements Plan processing as an evaluation and planning tool.
  • Create monthly schedules to determine material requirements for new and UTEX power packs.
  • Work with engineering regarding material requirements for new product design, i.e.
  • Work with the Buyers to meet material requirements for each customer.
  • Instituted forecasting techniques to drive the material requirements planning functions Responsible for day-to-day material requirements planning
  • Communicate material requirements in a timely manner to the buyers to avoid shortages.

Show More

8 Material Requirements Jobs

No jobs at selected location

26. WIP

demand arrow
average Demand
Here's how WIP is used in Master Scheduler jobs:
  • Managed 12 associates in warehousing/materials handling operation accountable for raw stock/WIP/Finished inventory levels.
  • Monitor finished good and WIP levels while using continual improvement activities to reduce inventory levels at all stages of production.
  • Maintain and report metrics for On-Time Delivery, MPS Performance, Days in WIP, Inventory Turns and Revenue.
  • Reduced WIP inventory by setting the production flow at the first operations and manpower requirements on down stream operations.
  • Maintained lean monthly inventory, WIP and OK to ship and reporting to the corporate S&OP.
  • Monitor inventory levels of raw and WIP goods to keep production lines working and inventory at a minimum.
  • Formulated EXCEL milestone schedules, based on routing sequences, to track work in process (WIP).
  • Created WIP Tracker to provide visual production metrics on the floor.
  • Maintain Sandbox activities database and integration processes into the WIP database.
  • Ensured the optimum level of WIP for entire repair process.
  • Managed and instructed the CWIP Company Wide Improvement Program.
  • Reduced WIP Inventory levels by over 300%.
  • Managed and maintained Raw & WIP chassis inventory.
  • Reported to Manager of WIP Planning & Scheduling.
  • Reduced WIP by 4 million dollars in 2008..
  • Reduced average WIP inventory by $65K.
  • Maintain proper WIP levels to minimize cost.
  • Track and monitor movement of shipments/drop shipments of raw materials and WIP and ensure intended recipient receives in a timely manner.
  • Facilitated daily Backorder review, and Bi weekly Set build, shop schedule, and WIP review meetings.
  • Performed weekly and monthly review of Inventory position of Raw, Wip, and Finished goods.

Show More

27. Process Improvement

demand arrow
average Demand
Here's how Process Improvement is used in Master Scheduler jobs:
  • Participated in multiple process improvement initiatives, gap analysis, change management and trained individual contributors before the go- live date.
  • Utilize key performance indicators to monitor and report on forecast accuracy and supply chain execution, and initiate process improvements.
  • Identify and implement system and process improvements within the supply chain to enable overall business process improvement.
  • Implemented successful process improvement plan for repair and warranty cycle to ensure contractual delivery.
  • Collaborate with primary care managers, administrators and staff on continuous process improvement initiatives.
  • Worked on director sponsored projects and/or process improvements (including associated margin analysis).
  • Maintain a Quality Management program to promote continuous process improvement.
  • Participate in projects for process improvement as assigned by management.
  • Spearheaded the implementation of process improvements to optimize operations.
  • Managed design schedules, budgets, financial reviews, process improvement programs, supply chain and trend evaluation.
  • Collaborated with program and project managers to derive and create metrics for process improvement.
  • Reduced customer ship dates provided by 50% through process improvements.
  • Developed and implemented process improvements, reports, and metrics.
  • Supply Planning Function process improvement team lead.
  • Process Improvement Team Leader and member.
  • Introduced PMO office for process improvement.
  • Implement Corrective Actions for Process Improvements.
  • Facilitated kaizen events for procurement and planning process improvement.
  • Initiated process improvements to increase Kanban stocking levels from 57% to 90% within two months.
  • Initiated process improvements and reconfigurations PRODUCTION SCHEDULER, Solar Plastics, Minneapolis, Minnesota.

Show More

2 Process Improvement Jobs

No jobs at selected location

28. Primavera

demand arrow
average Demand
Here's how Primavera is used in Master Scheduler jobs:
  • Automated Primavera and distribution of updated schedules to superintendents, managers, and trade partners.
  • Designed, develop, and maintained detailed resource-loaded schedules in Microsoft Project and Primavera.
  • Functioned as the divisional process manager & master scheduler using Primavera and Microsoft Project.
  • Master Scheduler responsible for populating new Primavera P6 database with program specific data.
  • Developed schedule updating procedure for using the Primavera updating tool Project Reporter.
  • Updated and revised upcoming outage schedule utilizing P3e and Primavera 5.0 in support due to a temporary staffing shortage.
  • Contracted to developed Key Event Milestone (KEM) schedule, utilizing Primavera P6, for Littoral Combat ship.
  • Developed level 3 project schedule (1200 lines) within Primavera P6 and specified goal strategy.
  • Master scheduler for $150 million remodel of RO/RO ship for the Federal Government using Primavera.
  • Utilized Primavera (P6) and MS Project to track manage and update company's projects.
  • Support the roll-out of Primavera and Oracle automation, Schedule reports and templates.
  • Managed the development of the baseline schedule in server-based Primavera P5.
  • Administrated Primavera 5.0 (P3e).
  • Experience with SAP, MAPICS, MS Project and Primavera.
  • Implemented, standardized and integrated Primavera scheduling model to manage all civil/highway construction projects, activities and resources across company.
  • Maintained all project documentation in electronic format using Primavera computer applications [ ] Professional Experience -
  • Worked as Primavera administrator Created resource allocation reports.
  • Selected Contributions: * Software used- Primavera P3-P6, Suretrak, Power Point, Expedition, Claim Digger & MS Office.
  • Create a comprehensive cross departmental Master Schedule to prepare existing infrastructure and systems for redesign/upgrade using Primavera P6.
  • Progress management of EV thru Primavera P6 and the Schedule of Values (SOV), baselining, trending and forecasting.

Show More

8 Primavera Jobs

No jobs at selected location

29. ISO

demand arrow
average Demand
Here's how ISO is used in Master Scheduler jobs:
  • Served as communications liaison between manufacturing, production control, order administration and inventory control.
  • Developed a maximization program utilizing case supervisors to meet OCRC 0-3 monthly contractual obligations.
  • Field Operations outage/shutdown planner, including site supervisory and management support.
  • Communicated scheduled expectations to supervisors for all 3 production shifts.
  • Communicated with supervisors daily to discuss high priority items.
  • Functioned as Deputy Program Manager and Customer Liaison.
  • Acted as Communication Liaison with Sales and Marketing regarding schedule changes that affect customers regarding product, process and market trends.
  • Supported Engineering Group as liaison between resident domestic and international customers and Test Group, coordinating test reviews and schedules.
  • Achieved a $2000.00 gain in lost revenue for old Tel-medicine bills not paid by New York State Prison System.
  • Balance inventory, resources and capacity and act as a liaison in all levels of different department to control MPS.
  • Generated / created work orders, estimates and quotes for clients, supervisors, labor staff, CEO/COO.
  • Published ISO and AS9100 procedures, processes, work instructions and trained service technicians on its use.
  • Perform internal audits to ensure departments are following their process and meet ISO 9001:2008 standards.
  • Notified field supervisors of all training on a daily basis and verified payroll weekly.
  • Continue to maintain and update ISO certification procedures for master scheduling.
  • Serve as a liaison between production operations and other areas.
  • Function as liaison between customer service and marketing department.
  • Participated in the implementation of ISO 9002 certification.
  • Performed internal quality audits for ISO compliance.
  • Worked as liaison between the consulting team and business team to identify the cutover requirements and appropriate resources.

Show More

1 ISO Jobs

No jobs at selected location

30. Material Availability

demand arrow
low Demand
Here's how Material Availability is used in Master Scheduler jobs:
  • Developed and maintained production schedules for finished goods and component items based on equipment, labor and raw material availability.
  • Analyzed, planned, and scheduled production orders based on customer requirements and material availability resulting in on-time delivery
  • Released daily production build schedules based on consumer demand, forecasts, material availability and capacity constraints.
  • Coordinate raw material supply with the procurement team to ensure material availability while maintaining inventory within budget.
  • Analyze schedule changes and material availability to determine impacts to company operations and prepare recommended solutions.
  • Maintained master warehouse schedule in alignment with sales projections, manufacturing capacity, and material availability.
  • Scheduled incoming business to meet customer requirements, line capacity and material availability.
  • Coordinated supply chain operations, and researched and analyzed material availability.
  • Prioritized material requirements for purchasing to assure material availability.
  • Reviewed material availability to support customer demands.
  • Generate and maintain plant schedules in SAP based on marketing forecasts, production capacities, supplier lead-times, and material availability.
  • Created valid, feasible production schedules based on equipment, labor, and raw material availability for 10 production/machining lines.
  • Plan and schedule production builds considering mix, manpower, machine capabilities, material availability, and customer requirements.
  • Review and schedule new customer sale orders based on published lead time, production capacity and material availability.
  • Advised upper management of SIOP, current work in process, material availability and potential production problems.
  • Research material availability for firm planned orders and expedite where necessary to achieve the master schedule.
  • Created all production schedules based on customer need date, asset and material availability.
  • Managed scheduling, production needs and material availability in relation to offsite production management.
  • inventory levels, customer satisfaction, part quality, tool and material availability
  • Analyzed customer orders, material availability, and capacity to reduce labor, increase efficiencies, and make on time deliveries.

Show More

8 Material Availability Jobs

No jobs at selected location

31. Purchase Orders

demand arrow
low Demand
Here's how Purchase Orders is used in Master Scheduler jobs:
  • Received and scheduled purchase orders from other manufacturing facilities and service division for on-time shipment.
  • Processed purchase orders and expedited vendor deliveries of critical parts.
  • Converted purchase requisitions to purchase orders.
  • Followed up on unacknowledged purchase orders finding at least 1 - 2 per week never received.
  • Create and secure approvals for requisitions and purchase orders for assembly raw materials and assembly/test services.
  • Processed purchase orders for the Human Resource department, Sales department, and Accounting department.
  • Manage purchase orders and supplier schedules to assure timely and consistent material flow.
  • Utilize MRP system to determine material requirements and release purchase orders to suppliers.
  • Generated all raw material and outside process (OSP) purchase orders.
  • Follow up on open purchase orders with vendors to ensure timely delivery.
  • Follow up with supplier for non-compliance of purchase orders.
  • Processed all Purchase orders for payment to contract manufactures.
  • Created all the purchase orders for drill rigs.
  • Provide ship dates for customer purchase orders.
  • Reviewed MRP daily and placed purchase orders.
  • Enter and maintain approved purchase orders/contracts.
  • Produce Excel reports to maintain Purchase Orders and Sales Orders.
  • Created purchase orders, routings and bills of materials.
  • Create Purchase Orders to vendors in a timely manner.
  • Manage Cycle Counters Requisitions/Purchase Orders Cost Coding MARTINREA FABCO

Show More

1 Purchase Orders Jobs

No jobs at selected location

32. JIT

demand arrow
low Demand
Here's how JIT is used in Master Scheduler jobs:
  • Recommend inventory levels while working within corporate JIT manufacturing guidelines.
  • Directed and organized JIT delivery of all materials purchased.
  • Assisted in the implementation of an MRP system and JIT programs in addition to order placement, master schedule execution
  • Created and applied Just-In-Time (JIT) supply strategies that increased inventory turnover by 40%.
  • Participated on numerous cost reductions, VMI, JIT, KanBan and third party warehouse project.
  • Keep production quantities at a manageable level using methods such as JIT, etc.
  • Based on JIT / lean principles, this system eliminated work orders and kitting.
  • Monitor key performance metrics, support consignment, JIT, KanBan and VMI programs.
  • Produce weekly audit reports using SAP metrics to ensure Just-in-Time (JIT) delivery.
  • Implemented JIT (Just In Time) Inventory system for Lean Inventory/Production levels.
  • Implemented planning of Just In Time (JIT) mixed model scheduling.
  • Scheduled production in a JIT environment based on current WIP inventory.
  • Directed supplier shipments for JIT delivery of material to production.
  • Coordinated shipping and receiving based on JIT production.
  • Scheduled incoming freight based on JIT requirements.
  • Reduced WIP from $234,000 to less than $30,000 per month using JIT techniques
  • Chaired Increased Thru-Put and Customer Service committees (JIT, Kaban) * Coordinated scheduling activities with department teams.
  • Implemented FIFO / Minmax systems improving JIT program by 30%.
  • Scheduled all daily production for 2 divisions (Sorbents and Wet/Fill) * Maintained JIT inventory for production for Sorbent division.
  • Created assembly build to schedule using Kanban inventory system to sustain adequate JIT shipping requirements.

Show More

33. Inventory Management

demand arrow
low Demand
Here's how Inventory Management is used in Master Scheduler jobs:
  • Established a new inventory management system for stocking manufactured product allowing for greater inventory turns and reduced stock-outs.
  • Initiate and participate in continuous improvement activities related to production planning, customer service and inventory management.
  • Inventory management; ensure inventory accuracy and optimization, to fulfill production need.
  • Streamlined operations, capturing significant savings through changes in inventory management.
  • Plan, coordinate, review all activities related to company goals, involving inventory management, production planning, and scheduling.
  • Managed customer service, MRP, production activity control, capacity planning, inventory management, and purchasing functions.
  • Employed SAP to implement forecasting, capacity planning, dispatching, picking, inventory management and reject processing.
  • Defined and implemented an inventory management system, which included a weekly metrics and tracking system.
  • Create inventory management tools to eliminate excessive inventory and reduce inventory cost by $200,000.00.
  • Streamlined product offloading, inventory management, and cycle count processes by introducing Lean methodologies.
  • Team leader for 3 Lean events in inventory management generating cost out > $250K.
  • Inventory management such as cycle counts, adjustments and processing of work orders.
  • Improved Inventory Management tools for Imported Finished Goods and Raw Materials.
  • Inventory management to include maintaining proper inventory levels/turns and disposition of excess/obsolete inventory in a timely manner.
  • Monitor and update customer interactive inventory management systems (e.g.
  • Maintained the Sales Forecast in the Inventory Management System, Intuitive ERP Reported revenue plan to management on a weekly basis.
  • Managed safety stocks, re-order points, re-order quantity, and other inventory management practices consistent with APICS process workflows.
  • Created and maintained line schedules to establish takt for manufacturing, the supply chain and inventory management.
  • Inventory Management Responsible for the movement, tracking and disposition of finished goods material.

Show More

1 Inventory Management Jobs

No jobs at selected location

34. WBS

demand arrow
low Demand
Here's how WBS is used in Master Scheduler jobs:
  • Developed and implemented enterprise-level WBS to enable tracking of resource allocation against approved work packages across multiple IT projects.
  • Constructed and managed Work Breakdown Structures (WBS) and work scope decomposition to achieve and effectively measure to program objectives.
  • Identified project Work Breakdown Structure (WBS), schedule forecasts, project baselines, program performance and EVM reports.
  • Developed a consolidated WBS using a combination of ship's WBS (SWBS) and the shipyard's WBS.
  • Reviewed and maintained total contract cost in accordance with the project schedule and WBS (Work Breakdown Structure).
  • Created WBS with project team, as well as, created an iterative Project Management Plan.
  • Develop Work Breakdown Structure (WBS) in conjunction with Project Management Team and Team Leaders.
  • Establish work breakdown structure (WBS) for direct and indirect craft activities.
  • Integrated multiple architecture design components onto documentation, IMS/IMS, WBS.
  • Define Sprint activities and Work Breakdown Structures (WBS).
  • Develop and Maintain WBS Dictionary.
  • Create a Program Work Breakdown Structure (PWBS) for the Base Year of the project.
  • Developed Work Breakdown Structures (WBS) in accordance with (IAW) MIL-STD-881C.
  • Support the WBS developed by BD and FEED.
  • Participated in proposal development and developed WBS and IMS/IMP from Contract Data Requirements List (CDRLs) issued by DoD.
  • Developed AASK's first use of MIL-STD-881C compliant WBSs for proposal and implementation.
  • Developed and maintained master schedule project scope, WBS elements, and deliverables.
  • Developed the WBS and Master Schedule for the Tutupan project in Indonesia.
  • Restructered the existing WBS to assist with managing and scheduling the project.
  • Created and maintained project milestones, deliverables, created MS Project schedule, assigned responsibilities and monitored deliverables based on WBS.

Show More

10 WBS Jobs

No jobs at selected location

35. Goods Inventory

demand arrow
low Demand
Here's how Goods Inventory is used in Master Scheduler jobs:
  • Reduced finished goods inventory by 29% through process of analysis and rationalization of existing inventory target levels.
  • Developed and implemented VM scheduling priority system ensuring right sizing of finished goods inventory.
  • Developed a process for forecasting sales and finished goods inventory.
  • Performed planning and scheduling of all manufactured finished goods inventory.
  • Managed finished goods inventory stocking levels at multiple distribution points.
  • Co-Managed Finished Goods Inventory utilizing WalMart Replenishment System.
  • Established and maintained appropriate finished-goods inventory levels.
  • Generated process for reduction of excess finished goods yielding a 42% reduction in finished goods inventory in six months.
  • Maximized the value of the finished goods inventory through effective materials use, QA, and process streamlining.
  • Communicated with customers, monitored raw materials and finished goods inventory achieving 97% on time delivery.
  • Developed cost saving method to reduce excess Finished Goods inventory each month by 5 to 10%.
  • Generated weekly Executive Review Summaries on levels of WIP and finished goods inventory.
  • Maintain low WIP and Finished Goods Inventory levels through proper plannings.
  • Tracked finished goods inventory and WIP on a daily basis.
  • Established and maintained $2MM finished goods inventory utilizing MRP/MPS.
  • Maintain and monitor all parts in finished goods inventory.
  • Control finished goods inventory and work in process.
  • Reduced Finished goods inventory levels by 25%
  • Decreased finished goods inventory for largest account [ ] annually by developing and implementing an effective forecasting method.
  • Reduce Finish Goods inventory levels to "just in time".

Show More

36. Inventory Accuracy

demand arrow
low Demand
Here's how Inventory Accuracy is used in Master Scheduler jobs:
  • Developed and Implemented Inventory Accuracy Improvement plan and Cycle Counting program.
  • Succeeded in increased inventory accuracy and turns during my tenure.
  • Maintained an inventory accuracy > 99.7% with hundreds of thousands of transactions annually and 40- 60K different active part numbers.
  • Implemented a cycle count program that improved inventory accuracy to >95%, eliminating historical deficits of >$750K.
  • Involved in developing and implementing a Cycle Counter program for the Warehouse which increased inventory accuracy by 95%.
  • Realigned process for inventory to be relieved from CNC and machine shop resulting in inventory accuracy at all times.
  • Implemented cycle count Program as a way to improve inventory accuracy on a daily basis.
  • Increased inventory accuracy from 60% to 98% through implementation of cycle counting program.
  • Help create and implement a cycle count program to increase perpetual inventory accuracy.
  • Initiated a stockroom cycle counting program which increased inventory accuracy by 20%.
  • Implemented the use of pick tickets to increase shipping and inventory accuracy.
  • Result: Improved inventory accuracy and reduced shrink by 20%.
  • Maintained inventory accuracy levels at 98% and above.
  • Improved inventory accuracy by 50%.
  • Implemented inventory accuracy Root-cause analysis on inventory losses.
  • Maintain inventory accuracy Effectively and efficiently utilize inventory.
  • Trained staff with Cycle Count and improved inventory accuracy from 75% to 95% during first 6 months of rollout.
  • Maintained 99.9+ inventory accuracy for product lines Ordered Raw Material and components using MRP
  • Started the Bin Mandatory program in Navision to help increase the inventory accuracy.
  • inventory accuracy--97.8% .

Show More

2 Inventory Accuracy Jobs

No jobs at selected location

37. Production Meetings

demand arrow
low Demand
Here's how Production Meetings is used in Master Scheduler jobs:
  • Attend weekly production meetings to understand incoming/upcoming work and evaluate resources required to execute new projects and business.
  • Organized morning production meetings to determine capacity issues with manning and/or machine schedule.
  • Conducted weekly production meetings to coordinate project flow with production supervisors and engineers.
  • Led production meetings with department supervisors to determine status of assigned projects.
  • Generate daily Backlog reports for Production meetings
  • Attend production meetings with engineering, quality and sales to resolve any issues relating to the production of the catalysts.
  • Attended morning production meetings to track unit flow through the shop to ensure on time delivery to customer.
  • Directed daily production meetings with all manufacturing area leads, shipping, and production control personnel.
  • Participate in daily production meetings to review previous day's results and discuss current/future production.
  • Led daily morning production meetings with Customer Service, Purchasing, Operations, and Marketing.
  • Attend production meetings to ensure the production plan and customer request are fulfilled.
  • Attend weekly production meetings as required to discuss component shortages and production problems.
  • Coordinate efforts in weekly production meetings with Manufacturing, Engineering and Sales.
  • Conducted daily production meetings with customer service, production and shipping personnel.
  • Conducted production meetings and adjusted the master schedule, as required.
  • Lead daily production meetings, providing direction and equipment schedules.
  • Attend regular production meetings and advise on customer.
  • Run production meetings on priorities.
  • Review schedule at production meetings.
  • Attended weekly/bi-weekly Production meetings to obtain as well as provide information Supervised clerks to ensure information was entered/saved correctly.

Show More

5 Production Meetings Jobs

No jobs at selected location

38. SKU

demand arrow
low Demand
Here's how SKU is used in Master Scheduler jobs:
  • Provided daily-bucketed schedules by SKU to manufacturing and installed production compliance metrics to measure performance.
  • Developed Sales & Operating Plan summaries for assigned product families and selected SKU's including demand, inventory and production data.
  • Maintained the daily production schedule of 150 different SKU's in a $200 million division of Intel Corporation.
  • Set production run rates over a thirteen week period managing 800 SKU's and ensuring a proper labor pool.
  • Scheduled 100 - 150 Hearing Aid Battery SKU's using forecasts and stock levels on a weekly basis.
  • Led the planning effort to convert manufacturing ending item SKU's to importing from China.
  • Keep SKU on target with inventory levels.
  • Managed total of 1,200 purchased and manufactured SKUs using repetitive, batch and work order processing methodologies.
  • Analyzed history, inventory, and consumption for 350+ SKUs in order to optimize supply plans.
  • Created master production schedule for 500 SKUs on 38 plastic injection machines for office products department.
  • Established SKUs to reduce lead times for our highly repetitious, high-volume, customers.
  • Maintained Master Schedule and Yearly Capacity Plan for 20 work centers and 2,000 skus.
  • Master Scheduler for manufacturing of 30 million cases annually across 12 product lines/270 SKUs.
  • Created and maintained product sku's and their associated bills of materials.
  • Scheduled and maintained the master schedule for 2,500 end item sku's.
  • Managed 623 retail sku's for a $150 million company.
  • Created demand and supply plans for approximately 400 skus.
  • Managed the schedule, forecast, capacity planning and administration of +30K sku's utilizing Epicor MPS and Forecast Pro software.
  • Average daily production exceeded 105,000 during this period - total number of finished goods sku's exceeded 1,000.)
  • Implemented and assisted in the development of Lean Manufacturing processes, Kanban levels and sku rationalization.

Show More

39. Management System

demand arrow
low Demand
Here's how Management System is used in Master Scheduler jobs:
  • Implemented and managed Microsoft Project Server; interfaced project schedules with Clarity business management system.
  • Master Scheduler for manufacturer of environmental controls and power management systems.
  • Developed Project Performance Index as part of Infrastructure Management System
  • Created Warehouse Management System for expendable containers.
  • Well experienced in warehouse management systems.
  • Maintained the warehouse management system.
  • Incorporated the Earned Value Management system to control and manage the cost, resources and time of each project.
  • Implemented cost and schedule Earned Value Management System (EVMS) in accordance with DODI 5000.2.
  • Implemented new yard management system - improved trailer availability and reduced load times 20%.
  • File and maintain controlled documents as required per the guidelines of AS9100 Quality Management System.
  • Manage the company's Quality Management System.
  • Piloted and implemented roll out of new Earned Value Management system using Deltek Cobra software.
  • Manage all equipment data in the CMMS (Computerized Maintenance Management System.
  • Participated in safety management system with no lost time recordable accidents in 14 years.

Show More

3 Management System Jobs

No jobs at selected location

40. Material Shortages

demand arrow
low Demand
Here's how Material Shortages is used in Master Scheduler jobs:
  • Facilitated daily production and manufacturing meetings focused on managing and eliminating risks associated with material shortages and bottlenecks.
  • Developed and implemented a critical shortages process to minimize material shortages and drive purchasing priorities and manufacturing efficiency.
  • Analyzed material shortages and manufacturing lead times to adjust inventory policies and positions.
  • Collaborated with Senior Management to resolve production capacity constraints and material shortages.
  • Worked with appropriate functional groups to resolve material shortages and manufacturing delays.
  • Communicate to Purchasing Department any material shortages and identify inventory fluctuations.
  • Revise production schedules when required due to changes in design, labor, material shortages, backlogs, or other interruptions.
  • Review material shortages, stock outages, and safety stock levels while working with Purchasing and Manufacturing to meet customer requirements.
  • Provide input to functional areas in case of design changes, material shortages, backlogs and other potential schedule interruptions.
  • Decreased material shortages by creating material demand the day the customer orders were entered into the backlog.
  • Coordinate communication through-out plant (raw material shortages, drop-in orders, and schedule changes).
  • Analyze material shortages, review order progress, and adjust plans and schedules as necessary.
  • Revise production schedule as required due to design changes, labor and/or material shortages.
  • Result: Eliminated material shortages, enabling production runs to be completed.
  • Expedite vendor lead times to accommodate material shortages in production.
  • Monitored material shortages and BOM processes.
  • Manage material shortages at the 3PL.
  • Review and expedite material shortages.
  • Report any and all material shortages to respective buyer and follow-up with real time delivery dates.
  • Report impacts of material shortages to Production Manager and develop a make-up plan.

Show More

41. EDI

demand arrow
low Demand
Here's how EDI is used in Master Scheduler jobs:
  • Resolve incoming shipping discrepancies and process rejected/defective parts obtaining corrected paperwork, replacement parts, return authorizations and credits.
  • Saved 200,000 through mixed load optimization, destination consolidation and avoiding unnecessary expedite costs.
  • Generated general clerical and some private billing for Tel-medicine services.
  • Designed material control system for implantable medical products.
  • Managed patient confidential psychiatric and addiction medicine records.
  • Contract position with medical device manufacturer.
  • Coordinate and expedite the flow of work and materials within or between departments of an establishment according to production schedule.
  • Performed bookkeeping and billing support services in support of medical patients and performed weight and height measurements for patients.
  • Teamed in start-up of new product line production, delivered ahead of schedule and meeting or exceeding productivity goals.
  • Place purchase orders and follow up on ship dates, expedites and late orders to meet demand.
  • Assist in preparing insurance forms for medical billing purposes and ensure forms are accurate and complete.
  • Coordinated with packaging, traffic and materials department to expedite component and movements with carriers.
  • Work on project to integrate EDI into QAD manufacturing system to eliminate excessive paperwork.
  • Maintained medical records to include filing and screen medical questionnaires.
  • Expedited time critical shipments as needed to support customer needs
  • Generated vendor releases based on Future 3 EDI.
  • Track on time delivery and expedite information.
  • Collaborated with the HUB onsite transportation representative to expedite inbound and outbound freights for the plant.
  • Enter purchase order acknowledgements, both electronically (EDI process) and manually.
  • Forecasted production based on Future 3 EDI.

Show More

42. Engineering Changes

demand arrow
low Demand
Here's how Engineering Changes is used in Master Scheduler jobs:
  • Coordinated implementation of engineering changes between manufacturing, purchasing, engineering, and customer service.
  • Coordinated implementation of engineering changes and new product introduction to ensure seamless product release.
  • Coordinate engineering changes externally to support customer and internally to prevent plant obsolescence.
  • Developed a process for tracking engineering changes from design to product implementation.
  • Reduced obsolete finished goods materials based on Engineering Changes or Balance Outs
  • Coordinate production schedules for engineering changes.
  • Plant lead for all engineering changes, product balance outs, and new product launches for the Lambda platform.
  • Work with the customer and production to systematically schedule upcoming engineering changes or model year changes.
  • Provide scheduling for engineering changes with the intent of meeting customer and program requirements.
  • Estimated need to reorder supplies due to rejections and engineering changes during manufacturing cycle.
  • Analyzed schedules for proper model, option content, and implementation of engineering changes.
  • Communicate with Engineers in tracking new programs and engineering changes to current product.
  • Maintained engineering changes in QAD system for over 1400 Finished Good part numbers.
  • Facilitate all engineering changes for finished goods and over 500 purchased components.
  • Incorporate Engineering changes and new products into supply chain.
  • Processed engineering changes Drafting and print updates / revisions
  • Coordinated Engineering changes through planning group.
  • Schedule all Engineering changes through Foundry.
  • Analyzed Engineering Changes (EC's) to identify production and schedule impact, and assigned effectivity upon incorporation.
  • Coordinate engineering changes and product mix changes between two factories on an on going basis.

Show More

43. OEM

demand arrow
low Demand
Here's how OEM is used in Master Scheduler jobs:
  • Coordinated with OEM and Distribution sites through order fulfillment to ensure that committed inventory levels were maintained.
  • Identified over 80 OEM recommended components to be brought to stock for servicing equipment through preventative maintenance.
  • Coordinated and expedited flow of materials, from Ramos, MX to OEM's Automotive customers.
  • Worked with OEM suppliers to improve the cost, on time delivery and quality programs.
  • Set up cellular manufacturing for OEM customer, achieving 98% on-time delivery and quality.
  • Scheduled final product for several large OEM accounts, VAR's, and distribution.
  • Worked with local machine shops to spec machine parts that were unavailable from OEM.
  • Schedule engine production according to orders from OEM truck assembly plants.
  • Monitor OEM schedule performance to include weekly and monthly variances.
  • Master Scheduler for OEM Propulsion Engine Assembly Floor.
  • Created Bill of Materials for OEM product.
  • Fall River, WI 9/2003 - 3/2016 Metals fabrication for OEM construction equipment and military vehicle components.
  • Manage inbound chassis coordination working with dealers and OEMs.

Show More

44. Sharepoint

demand arrow
low Demand
Here's how Sharepoint is used in Master Scheduler jobs:
  • Spearheaded the development of SharePoint site for the project management team supporting the Benefit System automation initiative.
  • Developed and maintained SharePoint sites, including project artifact repository and project communications.
  • Utilize SharePoint repository for document management and archive.
  • Restructured SharePoint to fully utilize the applications capabilities.
  • Deploy SharePoint dashboards for the production floor to enable the transition from R&D to production.
  • Managed, communicated, and organized schedules using MS SharePoint while maintaining compliance.
  • Managed schedule of 16,640 2003 SharePoint sites to be upgraded to 2013..
  • Build and maintained creative business intelligence SharePoint sites that displayed C-level dashboards.
  • Supported a client using MS Project Professional and Server 2010 and SharePoint.
  • Managed project documentation and test results in PVCS and SharePoint.
  • Provided SharePoint support for the Project Team.
  • Served as SharePoint Support to Project Team.
  • Launched and maintain internal SharePoint site.
  • Developed a Microsoft SharePoint website that coordinates the pre-production team, quoting, lean initiatives, and manufacturing improvement opportunities.
  • Develop and administer Controls Delivery Team SharePoint Workspace.
  • Proposed and implemented the structure for populating reports and documents to Microsoft Sharepoint for the Demand Planning group.
  • Placed schedules and reports on SharePoint to insure that everyone was notified and had the information they needed.
  • Upload and post current schedules onto Microsoft Sharepoint 2013 weekly using project Server 2013.
  • Developed and maintained various Project Schedules (MS Project 2010) in SharePoint Managed timesheet actual submissions against project schedule.

Show More

1 Sharepoint Jobs

No jobs at selected location

45. Production Floor

demand arrow
low Demand
Here's how Production Floor is used in Master Scheduler jobs:
  • Ensured accuracy on detailed work orders and traveler documentation to production floor and operations.
  • Analyzed system reports that identified production floor capacity constraints.
  • Interfaced with suppliers, production floor, Engineering and shipping to ensure customer dates were met consistently.
  • Establish and monitor a monthly production schedule based on production floor capacity and customer demand.
  • Directed the interface between material supply, production floor, and transportation to customers.
  • Release work orders to production floor ensure that production plans are executed timely.
  • Plan and prioritize product kitting and release of raw material to production floor.
  • Created, managed, and released MIG-wire work orders to the production floor.
  • Implemented engineering BOM changes on the WO's and the production floor.
  • Issue components and replacement parts to the production floor and testing areas.
  • Worked with management to ensure level-loading of work load to production floor.
  • Master schedule shop floor and communicate to production floor daily priorities.
  • Scheduled machine capacity, labor, and materials through the production floor
  • Establish processes to aid on production floor with increased throughput.
  • Work with production floor staff to meet customer demand.
  • Managed the schedule change process for the production floor.
  • Order needed supplies for the production floor.
  • Support production floor with all material requirements for the startup of the GTAT/Apple Inc. Sapphire Growth Process.
  • Removed production floor from excel, and access reports to scheduling program work center loadings gaining uniformity.
  • Core team member to implement method of kanban management of production floor.

Show More

4 Production Floor Jobs

No jobs at selected location

46. Delivery Dates

demand arrow
low Demand
Here's how Delivery Dates is used in Master Scheduler jobs:
  • Obtained and organized customer requested delivery dates from customer service team and material/component receipt dates from purchasing and planning teams.
  • Scheduled parts, overtime requirements and delivery dates with cross-functional departments to ensure on-time and on-budget delivery
  • Calculated requirements based on actual orders and instructed purchasing on raw material needs and delivery dates.
  • Managed machine times against purchase order delivery dates to meet internal and external delivery standards.
  • Scheduled and prioritized workload for manufacturing, finishing, and quality departments in order to ensure customer delivery dates were met.
  • Establish delivery dates 6 to 8 months ahead of the ship dates so the customer can plan their production schedules.
  • Managed various projects which include resource scheduling, project specification & personnel assignment to meet the project delivery dates.
  • Enabled teams to meet cost goals and scheduled delivery dates, while providing better visibility to Senior Leadership.
  • Prioritized work for the Drilling projects group and expedited all projects to meet the customer's delivery dates.
  • Balance and prioritize directly with program managers to commit specific delivery dates to meet project demands.
  • Handled several detailed projects and maintained the scheduled delivery dates of the product efficiently and on-time.
  • Advise demand manager and customer service representatives when delivery dates are at risk.
  • Reduced market lead times and delivery dates to less than four weeks.
  • Created work orders after scheduled delivery dates were approved.
  • Coordinated with vendors to determine best possible delivery dates and shipment routes while meeting requirements of Corporation Procurement Agreements.
  • Determined milestone delivery dates using project schedules and knowledge gained fromworking with Project Team Members.
  • Communicated with internal departments when needed for crucial customer delivery dates.
  • Quote all delivery dates for customer orders to ensure on time delivery while maximizing plant efficiency and throughput.
  • Monitor orders placed to assure best available delivery dates are given.

Show More

3 Delivery Dates Jobs

No jobs at selected location

47. Master Plan

demand arrow
low Demand
Here's how Master Plan is used in Master Scheduler jobs:
  • JOB DESCRIPTION: Master Planning and Scheduling Consultant Provide Master Planning and Scheduling Support to Proposal, EVMS and Business Management.
  • Maintain the integrity of master planning data within SAP including; bills of materials, material masters, and MRP.
  • Develop the company master plan with cross-functional team members from marketing, sales, production and customer service departments.
  • Identify, negotiate, and resolve conflicts between the stakeholders in the Master Planning / Scheduling process.
  • Develop and maintain the Program Integrated Master Plan / Schedule from the RFP or contract delivery requirements.
  • Executed master planning of annual production volumes of over 22 billion tablets and 275 million finished goods.
  • Provide Team Leadership for associate schedulers, review lower level schedules and incorporate into master plan.
  • Assisted in the Integrated Master Schedule and Integrated Master Plan development for multiple proposal efforts.
  • Head responsibility to achieve and sustain adherence to company rules associated with the Master Plan.
  • Developed Project Controls and Integrated Master Planning processes for Program Management Office (PMO).
  • Communicate and advise appropriate departments of changes to the master plan and related schedules.
  • Develop Maintains Integrated Master Schedule (IMS) with respect Integrated Master Plan.
  • Guide and assist in the development and management of Master Planning project schedules.
  • Key interface back to Master Planner and Asset Scheduler when required.
  • Provide training to current and new employees in the Master Planning department
  • Manage Master Planning function in the IC Business Unit.
  • Ensured adherence to master plans and schedules.
  • Develop and monitor Integrated Master Plan.
  • Spearheaded development of a Missile Defense Agency Integrated Master Plan schedule for simulation exercises directly supporting warfighter training requirements
  • Developed and maintained the Program Integrated Master Plan/Schedule associated with the entire project lifecycle, from RFP through project closeout.

Show More

24 Master Plan Jobs

No jobs at selected location

48. Weekly Basis

demand arrow
low Demand
Here's how Weekly Basis is used in Master Scheduler jobs:
  • Interacted with management on a weekly basis presenting real time analysis of plant performance along with proposals for increased efficiency.
  • Monitored customer on-line systems and obtained shipping requirements on a daily and weekly basis.
  • Review the customer release information on a daily and weekly basis to ensure production and shipments are meeting all customer requirements.
  • Develop and Communicate Project Plan schedule of all CD's and prioritize all tasks and activities on a weekly basis.
  • Submit schedules as well as schedule variance to customer as well as internal Program Manager on a weekly basis.
  • Scheduled, adjusted, and released over 100 work orders for the production floor on a weekly basis.
  • Provided briefings on a weekly basis to technical management to address performance to plan and schedule status.
  • Conduct and coordinate status meeting with all project engineers and financial personnel on a weekly basis.
  • Provide monthly sales numbers to management from forecast and actual sales on a weekly basis.
  • Researched and analyzed part requirements on a biweekly basis after running MRP reports.
  • Created and performed worldwide Reporting Metrics presented to management on a weekly basis.
  • Tracked sales and production on weekly basis using Microsoft PowerPoint and Excel.
  • Develop and report schedule metrics to management on a weekly basis.
  • Input manufacturing output data and analysis MRP on a weekly basis.
  • Reviewed open order book with sales representatives on weekly basis.
  • Maintain and provide status reports on a weekly basis.
  • Communicate to Distribution Lead times on a Weekly basis.
  • Executed and released MRP on a weekly basis.
  • Prepare schedule for plant activities on weekly basis.
  • Presented operations effectiveness trends and recommendations for corrective countermeasures to executive management on a weekly basis.

Show More

49. Production Orders

demand arrow
low Demand
Here's how Production Orders is used in Master Scheduler jobs:
  • Expanded operational effectiveness by supporting a third-party vendor with specialized production orders, allowing for rapid delivery times.
  • Scheduled all production activities, created and maintained all production orders and documentation.
  • Purchased and expedited materials for production orders and prototype samples.
  • Created production orders and requested delivery commitment from production manager.
  • Support for all R&D projects through the creation of production orders, schedules and the coordination of shared services.
  • Create and schedule production orders throughout the entire facility to include reconditioning and new product manufacture.
  • Analyze new and existing production orders through EDI interface, and manual purchase orders.
  • Plan and schedule production orders needed to support customer requirements for the Gas Cell.
  • Loaded bill of materials in system and generated production orders.
  • Schedule and reschedule production orders for the Controls Delivery Team.
  • Close production orders and manage errors due to material discrepancies.
  • Verify and modify production orders and plans as needed.
  • Coordinate production orders for six separate work areas.
  • Schedule production orders according to client releases.
  • Create weekly production orders by area.
  • Release production orders on time.
  • Managed and responsible for dispatcher to release production orders and reports in a timely manner.
  • Directed the workflow on the floor for all MRM and CTS production orders.
  • Prioritized and tracked production orders to ensure on time shipments.
  • Review processing schedules and production orders to make decisions concerning inventory requirements to forecasted driven system.

Show More

7 Production Orders Jobs

No jobs at selected location

50. OTD

demand arrow
low Demand
Here's how OTD is used in Master Scheduler jobs:
  • Assessed risk to delivery of schedules, recommending risk reducing actions where required in order to gain better confidence of OTD.
  • Participated in the transformation from a weekly to daily schedule that improved OTD from 88% to 92%.
  • Created and utilized daily Min-Max sheets to support customer production schedules were met with a 97% OTD rating.
  • Developed master loading report with IT for all supervisors to oversee their production ensuring proper loading maintained for OTD.
  • Manage plans for all product lines; ensuring that all customer orders are completed accurately and secured OTD.
  • Assisted in establishing work cell development to improve through put time and improve OTD to customers.
  • Manage and coach the planners and buyers to reduce past due and increase Customer OTD.
  • Provide Operations with an executable schedule while maximizing capacity constraints and track OTD performance.
  • Maintained 97% average Customer OTD to promised ship dates.
  • Maintain corporate KPI's requirement at 98% average on OTD rate from 55% now 95% to 98%.
  • Work with managers and employees to create and maintain order timelines, reduce costs and improve OTD.
  • Improved OTD 88%-91% Provide detailed schedule support in constrained areas.
  • Organize and Schedule Intercompany orders to improve OTD and customer satisfaction.

Show More

Master Scheduler Jobs

NO RESULTS

Aw snap, no jobs found.

20 Most Common Skills For A Master Scheduler

Production Capacity

11.7%

MRP

9.3%

Project Management

8.7%

Customer Service

8.5%

Inventory Control

8.1%

Raw Materials

6.6%

New Product Development

5.8%

Production Schedules

5.7%

ERP

4.4%

Customer Orders

3.5%

Safety Stock Levels

3.2%

Critical Path Analysis

3.2%

Logistics

3.0%

Customer Requirements

2.9%

Customer Demand

2.8%

Production Planning

2.8%

IMS

2.7%

Kanban

2.4%

BOM

2.4%

Capacity Planning

2.3%
Show More

Typical Skill-Sets Required For A Master Scheduler

Rank Skill
1 Production Capacity 8.4%
2 MRP 6.6%
3 Project Management 6.3%
4 Customer Service 6.1%
5 Inventory Control 5.8%
6 Raw Materials 4.7%
7 New Product Development 4.2%
8 Production Schedules 4.0%
9 ERP 3.1%
10 Customer Orders 2.5%
11 Safety Stock Levels 2.3%
12 Critical Path Analysis 2.3%
13 Logistics 2.1%
14 Customer Requirements 2.1%
15 Customer Demand 2.0%
16 Production Planning 2.0%
17 IMS 1.9%
18 Kanban 1.7%
19 BOM 1.7%
20 Capacity Planning 1.7%
21 Production Control 1.5%
22 Shop Floor 1.5%
23 EVM 1.5%
24 OP 1.3%
25 Material Requirements 1.3%
26 WIP 1.3%
27 Process Improvement 1.2%
28 Primavera 1.2%
29 ISO 1.2%
30 Material Availability 1.1%
31 Purchase Orders 1.1%
32 JIT 1.0%
33 Inventory Management 1.0%
34 WBS 1.0%
35 Goods Inventory 1.0%
36 Inventory Accuracy 0.9%
37 Production Meetings 0.9%
38 SKU 0.8%
39 Management System 0.7%
40 Material Shortages 0.7%
41 EDI 0.7%
42 Engineering Changes 0.7%
43 OEM 0.7%
44 Sharepoint 0.6%
45 Production Floor 0.6%
46 Delivery Dates 0.6%
47 Master Plan 0.6%
48 Weekly Basis 0.6%
49 Production Orders 0.6%
50 OTD 0.6%
{[{skill.rank}]} {[{skill.name}]} {[{skill.percentageDisplay}]}%
Show More

3,100 Master Scheduler Jobs

Where do you want to work?

To get started, tell us where you'd like to work.
Sorry, we can't find that. Please try a different city or state.