FIND PERSONALIZED JOBS
Sign up to Zippia and discover your career options with your personalized career search.
Sorry, we can't find that. Please try a different city or state.

Planning Engineer

This job has expired and is no longer available.
APPLY NOW
Apply Now
×
FIND
PERSONALIZED JOBS

Sorry, we can't find that. Please try a different city or state.

CONTENT HAS
BEEN UNLOCKED
Close this window to view unlocked content
or
find interesting jobs in

Log In

Log In to Save

Sign Up to Save

Sign Up to Dismiss

Sign Up

SIGN UP TO UNLOCK CONTENT

or

The email and password you specified are invalid. Please, try again.

Email and password are mandatory

Forgot Password?

Don't have an account? Sign Up

reset password

Enter your email address and we will send you a link to reset your password.

Back to Log In

Log In

Log In to Save

Sign Up to Save

Sign Up to Dismiss

Sign up to save the job and get personalized job recommendations.

Sign up to dismiss the job and get personalized job recommendations.

or

The email and password you specified are invalid. Please, try again.

Email and password are mandatory

Already have an account? Log in

reset password

Enter your email address and we will send you a link to reset your password.

Back to Log In

Company Saved

Answer a few questions and view jobs at that match your preferences.

Where do you want to work?

Job Saved

See your Saved Jobs now

or

find more interesting jobs in

Job Dismissed

Find better matching jobs in

Your search has been saved!

Top 50 Planning Engineer Skills

Below we've compiled a list of the most important skills for a Planning Engineer. We ranked the top skills based on the percentage of Planning Engineer resumes they appeared on. For example, 11.7% of Planning Engineer resumes contained Project Management as a skill. Let's find out what skills a Planning Engineer actually needs in order to be successful in the workplace.

These are the most important skills for a Planning Engineer:

1. Project Management

demand arrow
high Demand
Here's how Project Management is used in Planning Engineer jobs:
  • Direct the evaluations of major control systems as performed by others, interface with operating organizations, engineering and project management.
  • Implement Project Management approach to all major system implementations, major plant modifications/replacements and shutdowns activities.
  • Collaborated closely with senior engineers, project management and product development to impact technology systems.
  • Prepared project management manuals for department.
  • Facilitated the processing of over 400 projects in the AT&T Mobility Lab as Lab planning Engineer & Project Management.
  • Assist the project management in addressing issues and concerns pertaining to progress, scheduling and overall project execution.
  • Performed project management role for the construction of outside plant and inside plant facilities.
  • Project Management Lead for global loss & damage initiative tasked with improving customer experience.
  • Prepared project management manuals (Cost and Planning) for the department.
  • Monitor critical activities based on the project schedule and advise project management.
  • Performed Construction Project Management activities for Project Parthenon 1 and 2.
  • Address grief report in project management tool.
  • Coordinated with design-build construction teams for project management of deliverables and budget.
  • project management and design of copper mining facilities
  • Attend & prepared Project Management meeting, Financial meeting, presentation of project monthly and other works as needed 10.
  • Risk and Decision Analysis Tools: @RISK Project Management Tools: PRIMAVERA and MS PROJECT.
  • Served on the project management team at Fluor in Irvine, California.
  • Provided technical expertise and project management for sales and pre-sales support.
  • SAP (Materials Management Module) Project Management - Best Practices OTHER
  • Attend & prepared Project Management meeting, Financial meeting 9.

Show More

8 Project Management Jobs

No jobs at selected location

2. Manpower

demand arrow
high Demand
Here's how Manpower is used in Planning Engineer jobs:
  • Coordinated with contractors, vendors and site personnel for procuring material and manpower by utilizing optimization and total quality management techniques.
  • Experience in handling the Manpower effectively and organizing different teams to achieve the desired production quantity effectively.
  • Optimized plant maintenance and manpower scheduling using spreadsheet forecasting models.
  • Review and evaluate manpower and equipment utilization.
  • Prepared Progress Report, Status of Manpower & Equipment utilities of Subcontractor based on Plan, Evolve & eliminate critical activity.
  • Planned manpower, operation flow, tools and materials requirements to ensure the production line could produce 3K parts per day.
  • Prepare and analyze budget, cost, and manpower estimates and assist with developing funding strategies and resolving budget conflicts.
  • Reviewed and verified engineering schedules, progress curves, manpower histograms and progress measurement systems.
  • Allocated manpower, coordinated, monitored, and rotated as per planned schedule.
  • Prepared daily manpower and equipment reports, weekly and monthly progress reports.
  • Prepare the cost study for materials, spare parts & manpower.
  • Prepare schedule, manpower, and quantity progress and performance reports.
  • Analyze subcontractor plans and schedules, manpower and sequencing of work.
  • Allocated manpower in each team of each activity.
  • Reviewed contractor work schedules and manpower loading.
  • Allocate manpower, equipment etc.
  • Time and material estimates Manpower estimates.
  • Attended HSE study sessions, HAZOP, HAZID/ENVID/OHRA Experience in effective utilization of Manpower Resources Management for optimum gain of output.
  • Developed resource requirements for fabrication / construction plans (e.g., manpower, equipment, etc.).
  • Mine planning for equipment, manpower and production on longwall and miner development.

Show More

3. Infrastructure

demand arrow
high Demand
Here's how Infrastructure is used in Planning Engineer jobs:
  • Company delivers project based services related to energy, infrastructure and process industries.
  • Managed multiple projects involving both internal and vendor resources affecting national production infrastructure.
  • Handle day-to-day production planning of pressure vessels and developing infrastructures activities.
  • Collected HSD from capacity planning team developers and database infrastructure.
  • Perform quarterly infrastructure capacity analysis to highlight constraints.
  • Performed site surveys of existing infrastructure.
  • Direct IP Infrastructure team on installation and scheduling of hardware associated with new sites, backbone connections and peering capacity.
  • Analyze application load test results to determine the capability of the current infrastructure and help re-size the production environment.
  • Assist mine projects team with infrastructure locations to ensure infrastructure plans do not conflict with the stockpiling area.
  • Experience in the construction of pump houses and infrastructures work, irrigation projects and architecture projects.
  • Network architect the Cisco FWSM implementation for server layer core infrastructure for Safeway data centers and DMZ
  • Planned for wire center infrastructure, network media and digital loop carrier systems.
  • Involved in more than 8 datacenter and core infrastructure successful projects Developed departmental processes, policies and corporate standard and specification.
  • Coupled with sector designs, plan the accompanying infrastructure needed to maintain mine power and dewatering requirements.
  • Monitor the health and performance of the VMware infrastructure and the virtual machine inventory.
  • PROJECT HANDLED: Project undertaken: Building Contractors, and infrastructure Roadworks and Bridges Construction Doha, Qatar
  • Planned and Developed the infrastructure integration between Avantel and Axtel Companies.
  • Maintained EIVR architecture and infrastructure workflows (Visio).
  • Maintained EIVR architecture and infrastructure workflows(Visio).
  • Name of employer GCN Grupo Construtor do Norte (Portuguese contractor) Type of business or sector Infrastructure

Show More

5 Infrastructure Jobs

No jobs at selected location

4. Primavera

demand arrow
high Demand
Here's how Primavera is used in Planning Engineer jobs:
  • Develop and show critical activities in Primavera 6 to support status reporting and communication at a management level.
  • Developed Lotus 123/Primavera Finest Hour schedules for construction work.
  • Experienced with Primavera 3 environment.
  • Assist in implementation of the SAP integrated Primavera - Power, Energy & Process (P-PEP) shutdown project scheduling software.
  • Developed, updated and monitored detailed plant outage schedules in Primavera using work order backlog, outage duration and manpower restraints.
  • Oversee subcontractor's daily activities, and weekly update of the integrated construction schedules in Primavera (P6).
  • Prepared detailed time schedules for skeleton and finishes packages for the $22 Million project using Primavera P6.
  • Assign project duration & resources, and prepare Target schedule in Primavera as per Client s project requirement.
  • Prepare the progress report, time schedule and follow up the site activities by using Primavera P6.
  • Input the actual progress of level-3 activities to project master schedule (Primavera 3.1).
  • Project Scheduling was done using Primavera Project Planner (P3) and Microsoft Project.
  • Plan and prepare base line project schedule using Primavera P6 software.
  • Project Planning using Primavera (P6) and SAP Software.
  • Gained good experience with Primavera Project Planner (P3).
  • Issue level-3 three-months look-ahead schedule from Primavera Project Master Schedule.
  • Schedule software included Open Plan and Primavera P3.
  • Produced Project 2/Primavera schedules - maintenance outage tasks for licensed startup.
  • Prepare 3 month look Look Ahead plan in Primavera P6.
  • Excel, Microsoft Project, Primavera etc.)
  • Prepare Schedule in one of Primavera P3, P3e / P6 and / or V5/V6 9.

Show More

1 Primavera Jobs

No jobs at selected location

5. Baseline Schedule

demand arrow
high Demand
Here's how Baseline Schedule is used in Planning Engineer jobs:
  • Perform comparison between baseline schedule with actual costs/resources usage and work performed.
  • Developed standard work practices for developing and maintaining baseline schedules.
  • Prepare re-baseline schedule based on additional works and productivity rate.
  • Conceived baseline schedule for delivery of projects for workshop department.
  • Revise the Baseline Schedule whenever there is a change in the scope or the Sequence of work.
  • Developed detailed Baseline schedule associated with all resources allocated, narrative, cash flow.
  • Developed baseline schedule, weekly and monthly reports for administrated SODIC building project.
  • Assist in the updating of baseline schedule, including executive summary report.
  • Assign budge and resources to the time baseline schedule.
  • Analysed, evaluated, and forecasted current Status against an established baseline schedule.
  • Position: - Senior Planning / Scheduling Engineer Responsibilities: - Preparing the Project Baseline Schedule.

Show More

Job type you want
Full Time
Part Time
Internship
Temporary

6. P6

demand arrow
high Demand
Here's how P6 is used in Planning Engineer jobs:
  • Prepare turnaround schedule in P6 and allocate budgeted quantities, labor and equipment in the daily turnaround-planned activities.
  • Utilized P6 for scheduling, by PMC, as well as the contractors.
  • Review and prepare Schedule Baseline for the each Project packages in P6.
  • Configure P6 Professional client and P6 EPPM applications.
  • Monitor and update the schedule in P6.
  • Utilized P6 to schedule the FEED Phase of the project.
  • Utilized P6.1, MS Office, Adobe Acrobat.
  • Planned construction activities using Primavera P6, developed schedule and monitored progress.
  • Perform Primavera P6 Administrator functions.
  • Prepared multiple outage and shutdown hourly schedules in Primavera P6, which helped brewery achieve goals on time and within budget.
  • Prepare time schedules, resources & updating all job in hand projects by using Primavera (P6).
  • Plan, organize and monitor the construction activities through a detailed construction schedule by PRIMAVERA P6.
  • Used Primavera P6 to Prepare Schedules, Monthly Progress Report For Project Proposal & Detail Design.
  • Monitored and documented progress for 3 towers, reporting all data in Primavera P6.
  • Developed planning software skills through regular use of MS Project and Primavera P6.
  • Prepared PRIMAVERA project schedule in latest ORACLE versioned P6 software, scheduled discipline wise activities responsible to the AREA.

Show More

7. Monthly Reports

demand arrow
high Demand
Here's how Monthly Reports is used in Planning Engineer jobs:
  • Prepare Project's Daily, Weekly & Monthly Reports and coordination with Consultant on updating and recording progress.
  • Prepare relevant daily, weekly and monthly reports as required by the contract (progress reports).
  • Develop and maintain system; ensuring accurate tracking of PuR material variances, release monthly reports.
  • Prepared monthly reports based on the actual man-hours expended and actual progress of the projects.
  • Prepare weekly and monthly reports as required by the Contract and Project Manager.
  • Created Management Information Reports (MIR), look-ahead schedules, monthly reports.
  • Generated monthly reports including project status update, cost, and schedule information.
  • Prepared weekly and monthly reports to in-house top management and client.
  • Reviewed monthly reports submitted by the contractors for various projects.
  • Make daily, weekly, monthly reports for project progress.
  • Prepare daily, weekly and monthly reports.
  • Prepare project monthly payments and monthly reports.
  • Sustained Monthly Reports and Steering Committee Reports.
  • Produce daily reports and monthly reports.
  • Present monthly reports to manage efficiently and effectively the material utilization.
  • Power generation and water production cost and unit's efficiency calculations (monthly reports to head office).
  • Prepare PM, CM, Service, Weekly and Monthly reports on performed tasks.
  • Provide weekly and monthly reports related to the project path forward progress.

Show More

8. KPI

demand arrow
high Demand
Here's how KPI is used in Planning Engineer jobs:
  • Create work instructions for cockpit assemblies from engineering drawings and specification documents.
  • Produced the monthly stockpiling and haulage reconciliation report.
  • Evaluated opportunities for other short term stockpiling options to better the haulage profile.
  • Create Scorecards/Dashboards to monitor project schedule KPI's (Key Performance Indicators).
  • Designed conveyor belt alignment for the ultimate stockpile design.
  • Study of stockpile options in the long term perspective.
  • Reviewed KPIs for existing cell sites and made recommendations for quality improvement to reduce and eliminate Lost Calls and Ineffective Attempts.
  • Prepared and tracked yearly plan, KPIs, scope of work, budgeting, schedule, RFP/Q for network projects.
  • Developed and published Key Performance Indicators (KPIs) and identified actions necessary to sustain and improve performance and efficiency.
  • Designed ultimate pit, pushback, stockpiles, waste dumps and roads working primarily with MineSight.
  • Interfaced with the Performance team to ensure post rehome KPI's are within acceptable ranges.
  • Maintained data to analyze and improve customer KPIs on deliveries, quality and inventory.
  • Analyzed KPIs for newly turned up sites to ensure GOS is met and maintained.
  • Prepare the KPIs and the dashboard abstracted reports for the management.
  • Evaluated alternative waste and leach stockpile designs.
  • Follow up achievements of Farms KPIs.
  • Comply with maintenance and turnaround KPIs.
  • Check RNC KPI's and analyze trending stats to be able to recommend solution for RNC rehoming or sub-rack rebalance.
  • Provide project management with the required details of performance management related with schedules, progress measurement and KPIs.
  • Produce Key Performance Indicators( KPI's) Develop substructure integrated Mechanical Completion and Pre- commissioning Schedule.

Show More

9. Critical Path Analysis

demand arrow
high Demand

10. S-Curves

demand arrow
high Demand
Here's how S-Curves is used in Planning Engineer jobs:
  • Produced histograms and S-Curves and utilized allocated resources efficiently.
  • Issue S-Curves, histograms, two weeks look-ahead, construction progress photos.
  • Prepared S-curves for progress, manpower utilization and cash in-flow and out-flow.
  • Develop and Update of Man Power progress and forecast S-Curves.
  • Prepare the equipment wise S-Curves.
  • Prepared S-Curves, Revenues (Actual vs.

Show More

11. Construction Schedule

demand arrow
high Demand
Here's how Construction Schedule is used in Planning Engineer jobs:
  • Coordinated with engineering, procurement, construction, and commissioning to develop detailed construction schedules.
  • Gathered and analyzed data to produce realistic projections of Construction Schedule.
  • Developed and reviewed project fabrication / construction schedules.
  • Prepared project, procurement, and construction schedules as coordinated to each other and updated them base on the progress.
  • Identify and bring the attention of senior engineers where works are not being carried out according to planned construction schedule.
  • Developed baseline engineering, procurement, and construction schedule for a new co-generation plant located in Mobile, Alabama.
  • Report and analyze deviations from planned construction schedule in order to manage risks in the project.
  • Established construction schedules for a $40 million coal preparation plant and material handling systems.
  • Developed and updated construction schedule which included engineering and bidding & award of work packages.
  • Lead construction schedule to consolidate all contractor schedules: monitor and analyze progress.
  • Job responsibilities is to Control all on activities as per Construction Schedule.
  • Key Responsibilities: - Prepare the construction schedule based on the baseline program.
  • Key Responsibilities: - Prepare the baseline & construction schedule.
  • Developed the Level 4 Construction Schedule for FPSO Plateform.Maintain Overall Schedule , Reporting and Ressources Chart.Generating Weekly, Monthly Cost Control Report

Show More

12. CAD

demand arrow
high Demand
Here's how CAD is used in Planning Engineer jobs:
  • Provide system information and technical assistance to SCADA coordinators and operators.
  • Gained significant experience regarding Cad design and implementing its execution.
  • Used SCADA systems to automate where complex industrial systems and where virtually human controls were impossible using remote telemetry units.
  • Utilized proprietary company CAD tools to design work packages to answer company and customer requests.
  • Developed equipment, special procedures and CAD drawings as needed for ROV support and operations.
  • Provide Technical guidance to CAD designer / drafters for the lower level engineers.
  • Designed water distribution system models using EPANET software for the CAD.
  • Used SCADA applications to monitor, control and manage different networks.
  • Created and reviewed 2D drawings and 3D CAD models in SolidWorks.
  • Generated ACAD site and floor plans that supported business initiatives.
  • Converted the SunTrust SAN from Brocade switches to McData switches.
  • Purchased and maintained company-owned IBM computers and CAD systems.
  • Improved internal communications and asset management while shorting project development time by generating ACAD facility plans for all 56 Wesco locations.
  • Managed all CAD projects (from Design to As-Built documentation) and implementation the new facilities management system.
  • Used Geographic Information Systems (GIS) to locate new well connects and measured gas flow using Scada.
  • BORDER LEARNING CENTER Dedicated involvement to support the complete renovation of a two story academic building.
  • Program CAD files for Orbitech to test circuit cards coming off assembly line.
  • Created and reviewed 2D drawings and 3D CAD models in Catia V5 R20
  • Circuit Simulators: Cadence-OrCAD/PSpice Capture, Eclipse.
  • Utilize state of the art methods and equipment using computer aided drafting design (Intergraph Cadd).

Show More

3 CAD Jobs

No jobs at selected location

13. Autocad

demand arrow
high Demand
Here's how Autocad is used in Planning Engineer jobs:
  • Developed AutoCAD layout drawings and job-specific technical information for customer site preparation to ensure seamless interface at customer facilities.
  • Worked extensively with AutoCad to examine electrical one lines and transformer drawings.
  • Prepare IFA & IFC drawings using AutoCAD for the new electrical transmission lines routes & all related electrical & civil drawings.
  • Correct the project drawings (AS BUILT) (if needed) according to the site requirement by using AutoCAD program.
  • Achieved 0.5% tolerance by simulating components (cones) of process equipment on AutoCAD for precise manufacturing.
  • Prepare AutoCAD drawings to shown communication cables, ground schematics and power matrices for newly installed equipment.
  • Customized designing for special cases, as per client requirement using AutoCAD.
  • Organized excel spreadsheets and AutoCAD maps for monthly and yearly plans.
  • Utilized AutoCAD release 2008 and Mechanical desktop power pack release 2007
  • Use CAD tools like Pro-E and AutoCAD.
  • Performed documentation of client facilities including equipment layout, material flow, or cGMP requirements utilizing AutoCAD software.
  • Design haul roads, access ramps, dropcuts, stockpile sections and remaining capacities using MineSight and Autocad.

Show More

14. Saudi Arabia

demand arrow
high Demand
Here's how Saudi Arabia is used in Planning Engineer jobs:
  • Name of employer Bernard, Ltd (Kingdom of Saudi Arabia) Type of business or sector Project Management Consultancy
  • Worked as a Project Planning Engineer at Manazel construction in Riyadh, Saudi Arabia (2012-2013).
  • Oil and Gas Pipeline Projects Petro Infrastructure Consulting & Engineering, Kingdom Saudi Arabia
  • PROJECT HANDLED: Project undertaken: Infrastructure 90-kilometers Roadworks and Bridges Construction From Doha to Boundary Saudi Arabia, Al Sambra Roads
  • Box 1437 AL Khobar 31952 Kingdom of Saudi Arabia Tel.

Show More

15. Master Schedule

demand arrow
average Demand
Here's how Master Schedule is used in Planning Engineer jobs:
  • Coordinate schedule from contractors and incorporate the information gathered into the overall project master schedule.
  • Negotiated subcontractor schedules to ensure consistency with the Project Master Schedule.
  • Review and survey contractor and sub-contractor constructions schedules per project basis and integrated them with an Overall Master Schedule.
  • Update where required of the project master schedule and summary level curves and data.
  • Prepare an efficient Contract Master Schedule and maintain knowledge of all key project milestones.
  • Monitor, evaluate and correct project performance and ensure adherence to contract master schedule
  • Assist in preparation of program master schedule and performs critical path analysis.
  • Prepare the Project Master Schedule and coordinating with the Clients approval.
  • Revised Master Schedule from 5,700+ activities to 1,900 activities.
  • Master Schedule Based on Milestone ScheduleIV.
  • Master Schedule from the details of contracts and P&ID.
  • Monitor all engineering deliverables and assure all AFC drawings were issued to contractors as per project master schedule.
  • Tasked Performed: produced a Master schedule of the scope of work using the Critical Path Method.
  • Managed master schedule, man-hours and budget for the project Co-ordinate with finance department ensuring client payments
  • Identify and monitor critical paths running trough the project master schedule and individual contracts.
  • Prepared Master Schedule from P & IDs & EFDs.

Show More

16. ISO

demand arrow
average Demand
Here's how ISO is used in Planning Engineer jobs:
  • Worked with unit supervisors to optimize manufacturing operations to take advantage of these economics.
  • Recognized and promoted to progressively challenging positions from Supervisor to Planning Engineer.
  • Acted as liaison between management and various engineering disciplines.
  • Make daily reports and submit to immediately supervisor.
  • Effected a smooth transition of the Construction Plan to the Fabrication Supervisor/NS Construction Supervisor accountable for the execution of the work.
  • Worked very close with Maintenance Supervisor on a daily bases to have work completed to prevent down time on equipment.
  • Market Congestion Study: To identify low cost transmission fixes on MISO-PJM Seams using historical congestion data.
  • Worked jointly with Midwest ISO staffs to resolve any real time/day-ahead reliability issue within the GA3 footprint.
  • Involved close coordination with shop supervisors, project and design engineers to meet project deadlines.
  • Monitor the Implementation of preventive maintenance execution in accordance with our ISO 9001 procedure.
  • Cost Analysis and Bid Comparison of Several Sub Contractors, Price Comparison with Suppliers.
  • Planed large-scale systems projects through vendor comparison and cost studies.
  • Recommended Transmission Economic projects that reduces LMP on Entergy-MISO footprint.
  • Served as an on call supervisor for the Electric Division.
  • Coordinate with shop section supervisors on fabrication process workability.
  • Continue to support maintenance engineering as advisor.
  • Group supervisor responsible for planning, scheduling and monitoring construction activities for the Reactor Buildings for Units 1 & 2.
  • Coordinated studies with MISO on reliability projects as Entergy enters the MISO market.
  • Implemented IC5 (IsoPentane) merox unit to increase gasoline production then.
  • Provided MISO transmission grid congestion and mitigation plans in Entergy's footprint.

Show More

1 ISO Jobs

No jobs at selected location

17. P3

demand arrow
average Demand
Here's how P3 is used in Planning Engineer jobs:
  • Produced and updated the detailed construction schedule including all civil, mechanical, and electrical activities using P3 and P6.
  • Worked directly with building superintendents to plan and schedule contractor installation work in reactor and turbine buildings at WNP3.
  • Helped with the project conversion from P3 to P5.
  • Converted scheduling system from P3 stand alone, to P5 stand along, to P6 server version.
  • Used Primavera (P3) Project Planning Software as a tool for planning and scheduling.
  • Prepare project schedule in any different levels of detail thru P3.
  • Generate P3 resource(manpower/equipment) S-Curve and Histograms.
  • Generate P3 Look Ahead Schedules(i.e.
  • Have Primaver "P3" course at marine academy.
  • Have Primavera Enterprise "P3e/c" course at proma start "Primavera client in Egypt".

Show More

18. Management System

demand arrow
average Demand
Here's how Management System is used in Planning Engineer jobs:
  • Implemented projects planning & monitoring of the development activities using proprietary Projects Management system.
  • Implemented first Facility Management System outside Germany.
  • Trained in Quality Management Systems.
  • Processed all plant work orders utilizing a Computerized Maintenance Management System(CMMS).
  • Trained all new check management personnel on new check management system.
  • Managed the daily activities of the Factory Management System.
  • Develop and implement quality management systems in new processes and transfer of new lines and products.
  • Subject matter expert for LEIS/LEAD and Bandwidth Capacity Management systems for Valley- Central Coast region.

Show More

1 Management System Jobs

No jobs at selected location

19. Transmission Systems

demand arrow
average Demand
Here's how Transmission Systems is used in Planning Engineer jobs:
  • Submitted, tracked and supervised over 25 Authorized Service Interruptions to conduct preventative maintenance and system upgrades to transmission systems.
  • Performed operational analysis for the transmission and sub transmission systems of the Columbus Southern Power company.
  • Surveyed and engineered deployment of radio transmission systems.
  • Developed system improvement plans for the transmission and sub transmission systems of the Columbus Southern Power company.
  • Conducted analyses of transmission systems up to 345kV under steady-state and disturbance conditions.
  • Perform fault analysis studies for HV transmission systems.

Show More

4 Transmission Systems Jobs

No jobs at selected location

20. New Construction

demand arrow
average Demand
Here's how New Construction is used in Planning Engineer jobs:
  • Manage cross-functional planning requirements between central office, outside plant, and records management for new construction and maintenance organizations.
  • Managed projects involving the partition and locker room product lines for both new construction and remodeling.

Show More

21. Transmission Planning

demand arrow
average Demand
Here's how Transmission Planning is used in Planning Engineer jobs:
  • Developed documentation materials to ensure PJM's compliance with NERC reliability standard for Transmission Planning and model development.
  • Performed all computer modeling required to conduct power flow and stability study for transmission planning and analysis.
  • Coordinated with transmission planning personnel to assure operational requirements and system reliability were met.
  • Supported sub-transmission and transmission planning studies, dispatch, distribution engineering and reliability.
  • Supported the Transmission Planning division by performing both n-1 and n-2 contingency analyses and reporting the results to senior engineers.
  • Worked in Transmission Planning Department to assess and maintain current and future Transmission systems within NIPSCO's Electrical system.
  • Drafted PJM Manual 14B - PJM Region Transmission Planning to comply with NERC standards TPL 001-4.
  • Prepared transmission planning packages for projects in the $1-30 million range.
  • Maintain and oversee the day-to-day operations of the Transmission Planning Group.
  • Performed a long range transmission planning studies, identifying economical system improvements, and potential alternatives to support system growth and reliability
  • Document study results and present findings to the Subtransmission Planning Working Group (STWG) as appropriate.
  • Experience Local area transmission planning due to Performed transmission planning for the four demography changes and new industrial load.

Show More

22. Production Planning

demand arrow
average Demand
Here's how Production Planning is used in Planning Engineer jobs:
  • Rework Analysis and Inventory management Under Production Planning Department.
  • Incorporated inspection and test requirements into the production planning.
  • Experienced in assembly of various components, Production Planning, and Project Implementation.
  • Perform other duties as assigned by the Manager of Production Planning Control.
  • Coordinate with Production Planning dept for the execution of orders and shipping the components to customers.
  • Structure and Part Production PlanningTool orders for hard tools and programming effortShop Floor support

Show More

3 Production Planning Jobs

No jobs at selected location

23. EPC

demand arrow
average Demand
Here's how EPC is used in Planning Engineer jobs:
  • Control and analysis of internal EPC project budget and implementation of forecast project budgeted.
  • Group projects include integrated design, EPC, project management for energy, infrastructure and petrochemical sectors.
  • Project#7: EPC of Central Processing Facility Upgrade & New Water Treatment Plant.
  • Prepared integrated schedules between the EPC (CH2MHill) and the Major Projects Program Teams.
  • Conducted follow-up meetings of EPC activities, generating reports for the project manager.
  • Develop, analysis and follow-up of physical and financial control EPC progress files.
  • Control and monitor inputs to Overall EPC & I schedule.
  • Revised Construction Schedules presented by the EPC Company.
  • Review Browse project potential bidders EPC Schedule.
  • Consolidated schedules for a $ 3 Billion EPC Methanol Project, Joint-Venture PEQUIVEN (Venezuela) - SNAMPROGETTI (Italy).
  • Plan, Schedule, progress, and maintain for engineering, procurement, and construction (EPC) used Primavera.
  • 2014-2015Led the development of a complex/multi-site EPC project.

Show More

24. WBS

demand arrow
average Demand
Here's how WBS is used in Planning Engineer jobs:
  • Created WBS Structures within SAP Database using Network Activities for each project to establish the financial and execution strategies.
  • Track & report project progress & performance with Physical Progress Tracker, WBS & Schedule.
  • Project Proposal generation through in Controls (WBS, Customizing Dictionaries).
  • Prepared WBS & Base line schedules with all resource loading.
  • Formulate WBS, ABS and cost code for project.
  • Developed and implemented an innovative Work Breakdown Structure (WBS) to ensure all aspects of the projects are under control.
  • Project Management International Systems (PMIS Kuwait) Define Project Scope and Create a Work Breakdown Structure (WBS).
  • Prepared S-Curves for Various Work Breakdown Structure (WBS) based on the resources allocation prepare.

Show More

25. Cost Estimates

demand arrow
average Demand
Here's how Cost Estimates is used in Planning Engineer jobs:
  • Developed cost estimates and prepared business cases for data management projects.
  • Documented recommendations with specific work scopes and cost estimates.
  • Prepare construction cost estimates and evaluation of proposals.
  • Develop change orders including preparing cost estimates.
  • Assisted the project manager in preparing quantity take-offs and cost estimates for a tunnel and a road project.
  • Developed new project scopes and cost estimates for large petroleum pipeline and truck terminal construction and maintenance projects.
  • Developed cost estimates, searched for appropriate material handling equipment and supervised rack and bin installations for clients.
  • Created technical plans, cost estimates, project budgeting plans, ROI evaluations.
  • Assisted in the development and review of the control and definitive cost estimates.
  • Prepared cost estimates and calculated cost analysis on various tasks associated with projects.

Show More

3 Cost Estimates Jobs

No jobs at selected location

26. Construction Activities

demand arrow
average Demand
Here's how Construction Activities is used in Planning Engineer jobs:
  • Determine and estimate material quantity and resource work effort required for various construction activities.
  • Identify construction activities, logic relationships, and predecessor/successor logic.
  • Prepare weekly, bi-weekly and monthly look ahead of construction activities and prepare reports regarding the progress of works.
  • Establish the key milestones for the construction activities to be accomplished.
  • Provide shop drawing and schedule on various construction activities.
  • Maintain a daily log of construction activities.
  • Project Management: Managed engineering, procurement and construction activities of the $6 billion project Pet Coke Gasification.

Show More

27. CPM

demand arrow
average Demand
Here's how CPM is used in Planning Engineer jobs:
  • Developed CPM networks of engineering, procurement and construction for large-scale herbicide, ammonia and other petrochemical plants.
  • Prepared detailed CPM schedule analysis for several construction claims.
  • Produced network plans using CPM time analysis for various types of construction and performed simulations of 'what if' plans.
  • Developed and monitored Critical Path Method (CPM) scheduling networks for manpower distribution control and drawing & specification control.
  • Formulate daily, weekly and monthly network schedules used to integrate into the master CPM schedule.
  • Lead SW CPMT meetings and work with validation team to meet validation timing plan.
  • Maintain and update project CPM schedules and sub network schedules.
  • Developed & updated CPM schedules for each project.
  • Sourced new material and played role in product development Planning and scheduling of machines using CPM method.
  • Developed the CPM schedule for the U.S. Navy's AEGIS replicated cruiser project in Dahlgren, Virginia.
  • Create Projects schedule according to CPM .

Show More

28. Nerc

demand arrow
average Demand
Here's how Nerc is used in Planning Engineer jobs:
  • Perform annual long and short-term transmission system assessment studies to comply with the NERC standards (TPL 001-004).
  • Perform various studies to show compliance with NERC's TPL standards.
  • Assist in maintaining NERC compliance standards such as FAC, MOD, TOP, and TPL.
  • Assisted in the compliance studies of NERC TPL standards.
  • Perform long-term and short-term transmission system analyses including load flow, shortcircuit, generation interconnection and NERC/SPP functions.
  • Developed Compliance Database for NERC new standards Studied Geo-magnetic Disturbance, GMD Created a comprehensive presentation on Geogmengetically Induced Current, GIC

Show More

29. PSS

demand arrow
average Demand
Here's how PSS is used in Planning Engineer jobs:
  • Participated in the PSSR; Assisted in the designing, scooping and managing of the installation of field projects.
  • Modeled of transmission bulk power and substations for power flow and stability analysis using PSLF and PSS/E.
  • Used MUST & PSS/E to execute transfer studies on merchant plants requesting connection to the transmission system.
  • Performed steady-state analyses and voltage stability analyses using power system simulation models like PSSE and PSS-MUST.
  • Performed thermal and voltage analysis using PTI PSS/e and MUST software when assessed transmission/generation outages.
  • Performed power flow analysis and outage studies using PSS/E and NEPLAN software.
  • Used PSS/E to provide fault impedance & currents to the relay group.
  • Mentor new engineers in the team and provide them training on PSSE, ASPEN, TARA and ISO s approval processes.
  • Utilized PSS/E, PSS/MUST, PSAT, VSAT, and TSAT software during transmission grid analysis.
  • Perform power flow and No Harm studies on TSR requests (PSSE and MUST).
  • Utilised PSS/E software for system simulations.

Show More

30. Ericsson

demand arrow
low Demand
Here's how Ericsson is used in Planning Engineer jobs:
  • Involved in drive testing of Ericsson/Nortel BTS(hub/child), DWDM's, microwave link budgeting using JDSU.
  • Microwave radio used were NERA, Alcatel and DMC, Ericsson and Lucent- TRT.

Show More

31. ABU Dhabi

demand arrow
low Demand
Here's how ABU Dhabi is used in Planning Engineer jobs:
  • Project #2 Project name: AL BANDAR @ AL RAHA BEACH DEVELOPMENT, ABU DHABI
  • Project #1 Project name: SAADIYAT CONSTRUCTION VILLAGE, ABU DHABI

Show More

32. IP

demand arrow
low Demand
Here's how IP is used in Planning Engineer jobs:
  • Produced critical path provisions required to initiate job start, such as obtaining permits, scheduling equipment and material/ component mobilizations.
  • Anticipated shortages from suppliers to ensure on-time delivery and monitored daily production efficiency.
  • Perform Satellite link budget analysis to determine space segment and equipment requirements.
  • Participated in projects involved in improvement of quality using Six Sigma Techniques.
  • Established status and update procedures for Engineering disciplines and Project Management.
  • Performed capacity studies and capital equipment justification.
  • Direct the order fulfillment process, including material forecasting, supply planning, purchasing, maintenance planning, and shipments.
  • Administered contracts, controlled costs and invoices, and devised forecasts that anticipated equipment, materials and labor needs.
  • Negotiated with multiple manufacturing vendors and placed orders for ~$5M in equipment expenditures, annually.
  • Ensured good material availability rate in order to maintain high overall equipment efficiency (OEE).
  • Implemented JIT & CIP methodologies in manufacturing resulting in 30% reduction in inventory costs.
  • Planned, built and issued installation orders for >20 multiplexers, annually.
  • Take ownership of planning and execution and drive to completion multiple projects.
  • Managed assigned fiber cables and counts as well as multiplexer equipment utilized.
  • Coordinated with multiple disciplines to ensure alignment with project's aggressive schedule.
  • Develop of multi-discipline schedules, resource loading and leveling, critical path analysis and optimization.
  • Seconded to Bunyan Management Consultancy for The Innovation Park Muscat for the Research Council, a multi-disciplinary building project.
  • Participate in market meetings update regarding RNC implementation and RNC rehome to discuss issues that might cause delays.
  • Analyzed, wrote, and checked cable/framework specs for AT&T, wireline and wireless equipment.
  • Pre-positioned network for broadband and FTTC technologies by the strategic placement of remote terminal housings, fiber optic cables and multiplexers.

Show More

2 IP Jobs

No jobs at selected location

33. Technical Support

demand arrow
low Demand
Here's how Technical Support is used in Planning Engineer jobs:
  • Coordinated activities between Operations, Technical Support and Oil Movements in order to assure the optimized execution of planned production.
  • Administer technical support for design and project managers for completion of gateway presentation to senior management.
  • Provided technical support in assessing the feasibility of interconnecting renewable generation in Nevada.
  • Provided overall technical support for highly automated assembly lines.
  • Provide technical support to the Contractors during equipment installations.
  • Provided technical support for tank team projects, analyzed justification, and evaluated alternatives, saving company $9M.
  • Provided technical supports to site personnel in terms of planning & cost controlling.
  • Provided technical support for clients, including telephone and on-site support.
  • Provided technical support to the Transmission Operation Center.
  • Provide daily technical support and release information to the onsite steel fixers.

Show More

2 Technical Support Jobs

No jobs at selected location

34. BOQ

demand arrow
low Demand
Here's how BOQ is used in Planning Engineer jobs:
  • Prepare Time Schedule from New, Cash Follow on Bid Item in BOQ, Manpower & S curve based on time.
  • Prepare BOQ mapping sheets showing activity & its corresponding quantity & cost.
  • Prepare the LOI (letter of intent) with the terms & conditions as per BOQ (Bill Of Quantities).
  • JOB RESPONSIBILITIES: Pre Order: Analyzing the SLD/BOQ/specification received from client / consultant.

Show More

35. GSM

demand arrow
low Demand
Here's how GSM is used in Planning Engineer jobs:
  • Monitored the TDMA, GSM and UTRAN networks and drove work order creation for capacity expansion to meet current business requirements.
  • Fine-tuned the GPRS/GSM parameters to provide solutions to the voice & data service problems.
  • Planned more than 200 MW Backbone hops (GSM Project) of Punjab.
  • Planned, designed LMDS PDH Microwave System Project to backhaul short-range covering GSM sites in the capital city.
  • Identify co-channel/adjacent channel interference & retune the frequency to solve interference on GSM/UMTS problems.
  • Performed transmission project plan and project schedule for GSM/UMTS backhauling.
  • Project: Expansion of GSM 900/1800 Network and allied systems (Phase V) PTML (U-Fone).
  • Worked with Nortel Networks in Guyancourt, Paris, France on defining OMC-R configuration management across GSM and DCS 1800 networks.

Show More

36. Process Improvement

demand arrow
low Demand
Here's how Process Improvement is used in Planning Engineer jobs:
  • Developed detailed analysis for process improvement for planning group and implemented process changes for efficiency improvement.
  • Monitored system reliability and performances, and provided process improvements that will improve these areas.
  • Investigated issues impacting demand; mitigated material risks expeditiously, and implemented continuous process improvements.
  • Develop process improvements to effectively utilize equipment and materials to maximize production.
  • Recommended process improvements to improve the efficiency of project operations.
  • Tested multiple systems implementing process improvements while ensuring optimum quality.
  • Developed process for managing process improvement ideas at company level.
  • Analyzed capacity process and identified process improvement enhancement.
  • Developed and implemented process improvements for revenue operations.
  • Performed equipment evaluation for process improvement
  • Proposed process improvements to identify product quality deficiencies in current software release and track and fix them in future releases.
  • Help maintain ISO9000 status and QMS system by contributing process improvements and procedural documents.
  • Participated on the team for future planning and process improvement.
  • Worked with suppliers on process improvements for more efficient process.
  • Provide support to projects of product and process improvement.
  • Led weekly global quality and process improvement call.
  • Identified and proposed future process improvement projects achievements.
  • Recommend improvement opportunities, for efficiency and cost savings, in tooling, fixturing and process improvement.

Show More

37. Engineering Support

demand arrow
low Demand
Here's how Engineering Support is used in Planning Engineer jobs:
  • Provided engineering support to systems operation control center to complement their analysis.
  • Provide engineering support for production and maintenance activities to ensure maximum production.
  • Provided engineering support to stakeholders to facilitate forging interconnection agreements.
  • Provided engineering support on various special projects.
  • Provided engineering support for Darby Fork Mine
  • Provide all aspects of engineering support production from short block assembly through final inspection.
  • Provide engineering support to A&D and new ventures opportunities.

Show More

38. ERP

demand arrow
low Demand
Here's how ERP is used in Planning Engineer jobs:
  • Designed an enterprise collections solution to ensure that FedEx is effectively collecting on delinquent accounts across the operating companies and regions.
  • Created policies and procedures to clarify code interpretation and procedures to bring consistency among internal staff and external professionals.
  • Coordinated, interpreted, and distributed construction schedules submitted by contractors.
  • Planned and evaluated new/existing enterprise infrastructure systems, products and services.
  • Served as team leader for cross-functional work group and gathered, organized, and interpreted data for team performance measurement.
  • Led 'Material Requirement Planning' by using ERP System (Monitor AB) to handle customer demands.
  • Created change tickets for the Enterprise Change Management System and presented to the change board for approval.
  • Handled technical troubleshooting within an enterprise environment, including system crashes, slow-downs and data recoveries.
  • Interpreted regulations, directives, policies and contingency plans as they relate to support requirements.
  • Re-implemented the Existing ERP System (The Fourth Shift) and writing some documentation.
  • Utilized SAP/Dual-ERP for opening work orders, adjusting part routing, entering requirements.
  • Trained to efficiently operate Production module of SAP (ERP system)
  • Streamlined the training process by creating self-paced training programs using PowerPoint.
  • Gathered and interpreted ore body and pillar data.
  • Interpret and apply federal and state regulations.
  • Engineer firewall rules as identified by business needs and Information Security Design, engineer, maintain enterprise network infrastructure.
  • Cultivated superior customer satisfaction experience by interpreting needs successfully and drafting proposals quickly, resulting in repeat business.
  • Addressed customer inquiries regarding potential development, permitting questions, and Code interpretations.
  • Gas emergency planning, analysis and support Monitor, interpret, communicate and adhere to regulatory changes.
  • Print and Interpret Nortel and Ericsson E911 translations tables in troubleshooting and migrating SS7 and CAMA signaling.

Show More

8 ERP Jobs

No jobs at selected location

39. MW

demand arrow
low Demand
Here's how MW is used in Planning Engineer jobs:
  • Received several unsolicited written compliments from Marketing and Project Management for exceptional service, teamwork, and creative thinking.
  • Analyzed large data set collected at multiple utility scale solar PV sites, ranging between 5MW and 80MW.
  • Completed planning studies and resolved complex voltage complaints for a 730MW territory.
  • Opened and hosted no go calls and MW bridge conference calls.
  • Managed modem vendor relationship, involving price negotiations, and implementing new firmware upgrades for supportability enhancements.
  • Involved in the business and execution planning for the successful deployment of a 60MW wind farm in Satara, India.
  • Prepared progress reports, for four 350MW power generators with total cost of $2 billion for Stanwell Power Station.
  • Radio Station License Application/Documentation of radio station license to NTC prior to powering up of MW equipment.
  • Developed power system applications to monitor and analyze 5,600 MW power system grid with over 1,000 busses.
  • Created Stormwater Pollution Prevention Plan reports for submission to state and local agencies.
  • Helped design a new VMWare infrastructure to support server consolidation and migration.
  • Project: Karachaganak Main Works Contract (KMWC).
  • Document Windows and VMware operations policies and procedures.
  • Project cost was [ ] USD 3- 100 MW Power Plant Kabul, Afghanistan.
  • Migrated servers from VMWare to Hyper-V using Virtual Machine Migration tool from Veeam and P2V process in SCVMM.
  • Design formwork system for typical floors of the project (traditional formwork system).
  • Designed septic systems, stormwater detention systems, and stormwater drainage piping systems.
  • Project Engineer, NCDOT Highway Stormwater Program Bridge Stormwater Project
  • Designed and administrated server consolidation program through use of VMware vSphere and vCenter.
  • Audited as built reports to ensure specifications were reflected accordingly per DMC , Nokia , Ericsson MW links.

Show More

40. Monthly Basis

demand arrow
low Demand
Here's how Monthly Basis is used in Planning Engineer jobs:
  • Updated these schedules on a monthly basis and performed critical path analysis and downloaded cost information for the earned valve reports.
  • Set schedule baselines on a monthly basis in order to calculate project KPI s to report planned stability and efficiency.
  • Update and issue accurate activity progress reports on a weekly / monthly basis as required by the project.
  • Prepare and submission of Power System Performance Report to top authorities and state government on monthly basis.
  • Created up to $100,000.00 of income projects on monthly basis performing facilities' inspections.
  • Reviewed the production status on Hourly /Daily / Weekly / Monthly basis Inventory Management and including order entry into ERP.
  • Update the project program on a bi-weekly/monthly basis (for 4 Zones) - using Primavera P6.

Show More

41. Customer Requirements

demand arrow
low Demand
Here's how Customer Requirements is used in Planning Engineer jobs:
  • Prepare technical drawings, specifications, and topographical maps to ensure that system installations conform to applicable standards and customer requirements.
  • Design springs to satisfy customer requirements, evaluate new designs, designing processes to meet manufacturing and quality requirements.
  • Evaluate customer quality specifications and develop internal quality plans, systems and procedures to satisfy customer requirements.
  • Gathered, analyzed and translated customer requirements into actionable solutions.
  • Assisted coordination of the rack assignments with the local Operations for WorldCom transmission and collocation customer requirements.
  • Review contracts, purchase orders, specifications and blueprints for all customer requirements.

Show More

42. Corrective Action

demand arrow
low Demand
Here's how Corrective Action is used in Planning Engineer jobs:
  • Prepare Delay Analysis Report through monitoring critical activities with recommended corrective action to Project Manager.
  • Initiate, facilitate, and report on quality improvement and corrective action implementation.
  • Review schedule trends to identify problem areas and recommend corrective action to management.
  • Prepare Recovery Plans to correct any divergence based on approved corrective actions.
  • Prepared recovery/ revised schedules and proposed corrective actions for delays.
  • Lead the monitoring of progress against the schedule, analyzed, determined & reported deviations, and proposed corrective actions required.
  • Committed in determining the optional sequence of works and suggest corrective actions for efficient works methods in construction.
  • Contribute to the analysis of failures and problems, recommending corrective actions.
  • Perform delay analysis and apply corrective actions to reduce delays.

Show More

43. Hvac

demand arrow
low Demand
Here's how Hvac is used in Planning Engineer jobs:
  • Prepared HVAC equipment and associated other component list to support overnight cost estimation.
  • Design the duct layouts in the most effective and efficient manner according to all specs of the HVAC project.
  • Coordinated and provided design parameter feature information to support passive nuclear power plant requirement for the passive HVAC system.
  • Designed HVAC systems for new facilities and re-design for existing buildings that were set to undergo remodeling.
  • Project planning and schedule designing in HVAC solutions.
  • Assign as HVAC Engineer for the Installation of Package type AC and required Ductings and related works

Show More

44. SQL

demand arrow
low Demand
Here's how SQL is used in Planning Engineer jobs:
  • Constructed a SQL database to analyze all legacy network connections in order to access which ones needed upgrading.
  • Created helpful files in MAP INFO by using thematic mapping and SQL queries for the team.
  • Developed software using Python and SQL programming to automate various transmission analyses for PSS/E and PSS/MUST.
  • Used MS Excel and SQL Database applications in forecasting calls offered compared to calls handled.
  • Reported data from Dispatch to automate macros in Excel using VBA with SQL and Access.
  • Used MAT LAB, PVSyst, and MS SQL during work.

Show More

1 SQL Jobs

No jobs at selected location

45. BOM

demand arrow
low Demand
Here's how BOM is used in Planning Engineer jobs:
  • Coordinated purchasing audits conducted by customers like Volvo, ABB & Bombardier Transportation (BT).
  • Maintain and update equipment data base including details and BOM including maintenance history in SAP.
  • Work with DAA Commodity Product Engineers, review and revise DCS file logs and BOM.
  • Project Manage - Qualifying new Mexican suppliers for highest cost BOM component.
  • Review BOM requirements of DAA and supplier PPAP documents.
  • Create logistics like Mapping Rules in i2MDM to establish mapping of customer orders to PBOMs.
  • Evaluate customer quotes for creating and/or updating PBOMs or Bills of Materials for demand planning.
  • Place purchase requisitions (PRs) in Oracle for CPV system BOM components.
  • Create PBOMs in i2MDM and in i2DM.
  • Provided a roadmap for Project Managers, engineers, HSSE professionals, Project Assurance engineers, FEDMs and BOM.

Show More

46. New Projects

demand arrow
low Demand
Here's how New Projects is used in Planning Engineer jobs:
  • Managed new projects from feasibility studies to conclusion including coordinating contractors.
  • Compare the schedules, technical requirements and reports for new projects and produce a Bid Comparison Sheet.
  • Championed the quick turnaround of new projects to increase the chance of future business awards.
  • Presented all new projects to management, financial portfolio group and operating region for approval.
  • Prepare Internal Baseline time Schedule with Man Power Histogram for New Projects.
  • Prepare Baseline Time Schedule for New Projects with Narrative Report Prepare Resources Histograms & S- Curves.

Show More

47. Weekly Basis

demand arrow
low Demand
Here's how Weekly Basis is used in Planning Engineer jobs:
  • Developed project base schedules and Monitor/update the schedules on daily/weekly basis.
  • Generated Commodity Curves and Calculated Commodities and Man-Hours to Go report on weekly basis for Field Engineers.
  • Update the program by weekly basis and issue the construction look ahead schedule.
  • Maintain forklifts on a weekly basis.
  • Analysed reports comparing target schedules on a weekly basis, etc.

Show More

48. Maintenance Activities

demand arrow
low Demand
Here's how Maintenance Activities is used in Planning Engineer jobs:
  • United Kingdom Responsibility for all Project & Maintenance Activities including TAM outages.
  • Optimize work schedule by conducting time studies of major preventive maintenance activities.
  • Carried out maintenance activities in the Oil Refinery & Utility plants.
  • Support the day to day maintenance activities according to maintenance strategy.
  • Originated documentation for Quality Assurance Trackwise system to document deviations for maintenance activities in GMP areas.
  • Prepare quality control plan for all major maintenance activities as per industry best maintenance practices.
  • Scheduled, planned and supervised job timelines for maintenance activities of fuels plant.

Show More

49. UAE

demand arrow
low Demand

50. Liaise

demand arrow
low Demand
Here's how Liaise is used in Planning Engineer jobs:
  • Work as an active member of site coordination team, effectively involved in schedule follow-up and liaise with site staff.
  • Liaised with survey and Lands Department for retrieval of maps relating to Freetown International Airport and Hastings Airfield 14.
  • Liaised with appropriate third party vendors, as well as, internal field service groups for site installations.
  • Liaised with Project Managers and ensured all projects were completed to scope, schedule, and cost.
  • Liaised with Commercial team to provide them baseline data to avoid Liquidated Damages (LD's).
  • Liaised with Site Managers and Surveyors and modified projects plans as per requirements and progress.
  • Order or buy computer systems and liaise with purchase and supplies department.
  • Liaised between group and the East Division regarding all routing designs.
  • Liaised with and prepared reports for company directors.
  • Liaised between Keeler and customers to achieve timely delivery of production.
  • Liaised with drilling contractor on a daily basis to determine optimal stopedrilling sequence to maintain production.

Show More

Planning Engineer Jobs

NO RESULTS

Aw snap, no jobs found.

20 Most Common Skills For A Planning Engineer

Project Management

17.9%

Manpower

8.4%

Infrastructure

7.3%

Primavera

6.3%

Baseline Schedule

6.0%

P6

5.3%

Monthly Reports

4.7%

KPI

4.6%

Critical Path Analysis

4.5%

S-Curves

4.4%

Construction Schedule

3.8%

CAD

3.7%

Autocad

3.4%

Saudi Arabia

3.1%

Master Schedule

3.1%

ISO

2.9%

P3

2.7%

Management System

2.7%

Transmission Systems

2.6%

New Construction

2.4%
Show More

Typical Skill-Sets Required For A Planning Engineer

Rank Skill
1 Project Management 11.7%
2 Manpower 5.5%
3 Infrastructure 4.7%
4 Primavera 4.1%
5 Baseline Schedule 3.9%
6 P6 3.4%
7 Monthly Reports 3.1%
8 KPI 3.0%
9 Critical Path Analysis 3.0%
10 S-Curves 2.9%
11 Construction Schedule 2.5%
12 CAD 2.4%
13 Autocad 2.2%
14 Saudi Arabia 2.0%
15 Master Schedule 2.0%
16 ISO 1.9%
17 P3 1.8%
18 Management System 1.7%
19 Transmission Systems 1.7%
20 New Construction 1.6%
21 Transmission Planning 1.6%
22 Production Planning 1.6%
23 EPC 1.5%
24 WBS 1.5%
25 Cost Estimates 1.4%
26 Construction Activities 1.4%
27 CPM 1.4%
28 Nerc 1.2%
29 PSS 1.2%
30 Ericsson 1.2%
31 ABU Dhabi 1.2%
32 IP 1.1%
33 Technical Support 1.1%
34 BOQ 1.1%
35 GSM 1.1%
36 Process Improvement 1.1%
37 Engineering Support 1.1%
38 ERP 1.1%
39 MW 1.1%
40 Monthly Basis 1.1%
41 Customer Requirements 1.1%
42 Corrective Action 1.1%
43 Hvac 1.0%
44 SQL 1.0%
45 BOM 1.0%
46 New Projects 1.0%
47 Weekly Basis 1.0%
48 Maintenance Activities 1.0%
49 UAE 0.9%
50 Liaise 0.9%
{[{skill.rank}]} {[{skill.name}]} {[{skill.percentageDisplay}]}%
Show More

34,500 Planning Engineer Jobs

Where do you want to work?

To get started, tell us where you'd like to work.
Sorry, we can't find that. Please try a different city or state.