Automatically apply for jobs with Zippia
Upload your resume to get started.
Production control expediter skills for your resume and career
15 production control expediter skills for your resume and career
1. Production Schedules
The project plan of a film or a documentary that highlights how a production budget will be spent over a given period until its completion is called a production schedule. The scheduling process starts with writing and analyzing the script, which is then broken down to determine and allocate the budget for each scene. The production schedule also includes several elements of the film including; cast actors, special effects, wardrobe, special equipment, stunts, extras, silent bits, production equipment, and many others.
- Optimize utilization of labor and materials to forecast long-term production schedules.
- Formulated and updated commitment dates to support production schedules.
2. Production Control
Production control is the component of management that directs, plans, and controls the supply and processing of raw material. Any enterprise does this so that specific products get produced by a stipulated approach to convene an authorized sales programme. Production control is often executed from a control or operations room.
- Initiated corrective action with shop supervisors and other production controllers when documents and materiel/parts information needed to be corrected.
- Supervised Production Control Expediters assuring that all quality assurance and quality control standards were met and exceeded.
3. Delivery Dates
A delivery date is a day on which a stock, bond, or option trade must be finalized. In other words, it is a final date on which the underlying commodities for a forward contract must be delivered for the fulfillment of the terms of the contract.
- Maintained database of present purchases and delivery dates using Microsoft access.
- Utilize material control system to monitor inventory levels, review delivery dates and quantities.
4. MRP
MRP is an abbreviation of Material Requirements Planning and refers to the control system which is implemented in the planning and management of the activities related to manufacturing. Through MRP, manufacturers can easily schedule the production and it can also be used for inventory. MRP systems are mostly software-based but the process can also be carried out manually.
- Helped in revising and adjusting of schedules according to production progress and changed orders when working with MRP.
- Reduced on hand inventory by 50% utilizing MRP and Pull System for inventory management.
5. Inventory Control
- Initiated and managed a new inventory control system, eliminating theft and waste and improving project profitability.
- Maintained inventory control by performing cycle counts including corrective action and auditing completed material transfer documents.
6. Completion Dates
- Direct customer contact for quoting and to insure all requirements and questions are resolved, including completion dates.
- Release drawings for shop packets complete with work-order router, completion dates, and instructions for subsequent operations.
Choose from 10+ customizable production control expediter resume templates
Build a professional production control expediter resume in minutes. Our AI resume writing assistant will guide you through every step of the process, and you can choose from 10+ resume templates to create your production control expediter resume.7. Production Problems
- Monitored and coached production associates Identified key production problems and resolutions
- Developed production tracking systems, analyzing production, quality control, maintenance and other operational reports, to detect production problems.
8. Shop Floor
- Identify and implement appropriate planning, management and control strategies for production, material requirements, inventory levels and shop floor.
- Shop Floor Control Dispatch Technician (1989-1994) Staged assigned and coordinated production jobs to work cells.
9. Production Orders
- Expedited material from warehouse, vendors as well as late/high priority and escalated production orders.
- Scheduled and released production orders and purchase requisitions on time.
10. Production Floor
Production floors are a platform from which productions are drilled and/or manufactured and also houses a processing plant and other equipment necessary for the proper functioning of the production operation.
- Delivered critical parts to production floor resulting in a complete quota fulfillment of Department of Defense (DoD) contracts.
- Major POC (point of contact) between Purchasing, Warehousing, Call Center, Quality and the production floor.
11. ERP
Enterprise Resource Planning (ERP) is computer software used by major corporations and organizations for conducting their management and accounting tasks efficiently. ERP systems bind different business processes with each other allowing smoother flow of data between them resulting in swift project assessment and completion.
- Verify accuracy of orders by matching them with quantities and types in ERP System.
- Created Purchase Requisitions to Procure Shop Tooling and Build Materials via ERP System.
12. Material Availability
The quantity of material required to begin and finish a task is called material availability. The percentage of the total inventory integral to accomplishing the assigned task given the quality is up to standard. Before any project starts, the planner will ensure that the required material is available and permit its execution. The type of material availability check depends upon the available time for the task.
- Formulated commitment dates based on material availability, machine operations and fabrication processes.
- Established cycle counts and inventory stability for the aftermarket and daily in house builds to ensure material availability on needed material.
13. WIP
- Participated in DRB's (Disposition Review Board) to help solve problems in WIP to avoid weekly commit misses.
- Worked with senior leadership to help plan resources for upcoming work and updating WIP status.
14. Quality Issues
- Collaborated with engineers and technicians to identify and address potential production and quality issues.
- Lead daily briefing of management on the status of production, shipments and quality issues providing reports and documentation as necessary.
15. Expediter
- Flight line expediter ensures maintenance accomplishment and sortie production by managing, controlling and directing allocated resources and personnel.
- Sole Expediter for the AIT division responsible for the overall On Time Delivery of all jobs at American Sheet Metal.
5 Production Control Expediter resume examples
Build a professional production control expediter resume in minutes. Browse through our resume examples to identify the best way to word your resume. Then choose from 5+ resume templates to create your production control expediter resume.
What skills help Production Control Expediters find jobs?
Tell us what job you are looking for, we’ll show you what skills employers want.
What skills stand out on production control expediter resumes?
Professor & Chair of Theatre, University of Wisconsin - Milwaukee
-Leadership and project management (Believe it or not, the arts focus on time management and high commitment to work ethic.)
-New ideas and innovations (Developing ideas and solutions and working on them through to the finished project)
-Curiosity and risk taking
-Technology skills (Film and theatre production are focused on mentoring in shops and laboratories.)
-Imagination and interpersonal skills
-Curiosity - independence - knowing how to follow through on tasks and projects
-Cultural literacy and diversity
-Singing, dancing, storytelling, acting, writing, designing, comedy, and scholarship
What type of skills will young production control expediters need?
Anthony Guest
Chair, Associate Professor of Theatre, Oakland University
List of production control expediter skills to add to your resume

The most important skills for a production control expediter resume and required skills for a production control expediter to have include:
- Production Schedules
- Production Control
- Delivery Dates
- MRP
- Inventory Control
- Completion Dates
- Production Problems
- Shop Floor
- Production Orders
- Production Floor
- ERP
- Material Availability
- WIP
- Quality Issues
- Expediter
- Cycle Counts
- Assembly Line
- Delivery Schedules
- Logistics
- On-Time Delivery
- Production Lines
- Customer Orders
- Machine Shop
- Quality Standards
- Part Numbers
- Production Process
- Status Reports
- Sales Orders
- Due Dates
- Serial Numbers
- Customer Demand
- BOM
Updated January 8, 2025