FIND PERSONALIZED JOBS
Sign up to Zippia and discover your career options with your personalized career search.
Sorry, we can't find that. Please try a different city or state.

Project Controls Engineer

This job has expired and is no longer available.
APPLY NOW
Apply Now
×
FIND
PERSONALIZED JOBS

Sorry, we can't find that. Please try a different city or state.

CONTENT HAS
BEEN UNLOCKED
Close this window to view unlocked content
or
find interesting jobs in

Log In

Log In to Save

Sign Up to Save

Sign Up to Dismiss

Sign Up

SIGN UP TO UNLOCK CONTENT

or

The email and password you specified are invalid. Please, try again.

Email and password are mandatory

Forgot Password?

Don't have an account? Sign Up

reset password

Enter your email address and we will send you a link to reset your password.

Back to Log In

Log In

Log In to Save

Sign Up to Save

Sign Up to Dismiss

Sign up to save the job and get personalized job recommendations.

Sign up to dismiss the job and get personalized job recommendations.

or

The email and password you specified are invalid. Please, try again.

Email and password are mandatory

Already have an account? Log in

reset password

Enter your email address and we will send you a link to reset your password.

Back to Log In

Company Saved

Answer a few questions and view jobs at that match your preferences.

Where do you want to work?

Job Saved

See your Saved Jobs now

or

find more interesting jobs in

Job Dismissed

Find better matching jobs in

Your search has been saved!

Top 50 Project Controls Engineer Skills

Below we've compiled a list of the most important skills for a Project Controls Engineer. We ranked the top skills based on the percentage of Project Controls Engineer resumes they appeared on. For example, 16.8% of Project Controls Engineer resumes contained Project Management as a skill. Let's find out what skills a Project Controls Engineer actually needs in order to be successful in the workplace.

These are the most important skills for a Project Controls Engineer:

1. Project Management

demand arrow
high Demand
Here's how Project Management is used in Project Controls Engineer jobs:
  • Lead Specialist providing program/project management services and support during the development and execution phases of various global projects and programs.
  • Provided systems engineering and project management support for large-scale, global enterprise Active Directory migration and consolidation.
  • Provided profit opportunity evaluations to Project Management leading to profitability exceeding contract dead band.
  • Provide monthly Project Management Review to internal management.
  • Provided profit opportunity evaluations to Project Management.
  • Type of Projects Handled: Project Feasibility Studies, Front End Engineering Design FEED, Detailed Engineering & Project Management Services.
  • Monitored project budgets, expenditures, and schedules to provide project management and committee members about potential issues and solutions.
  • Coordinate and work with the project management team to resolve project issues to ensure the delivery/completion of the project work.
  • Provide planning and cost controlling support for all projects including reporting and monitoring of milestone progress project management team.
  • Progressed through various areas of Information Technology and the Project Management Office of the Cellular phone division.
  • Generated and maintained daily, weekly, bi-weekly, and monthly reports for the Project Management team.
  • Developed thorough and concise monthly reports to account for project status to Owner and Project Management team.
  • Provided Program Management and Project Management assistance and training to the national AT&T team.
  • Represent company (project department) during A/E, client and project management meetings.
  • Developed Project Management, System Planning, Cost Control, and Scheduling skills.
  • Assigned to the Project Management Control System (PMCS) organization.
  • Prepared project charter and project management plan.
  • Prepare month forecasts and input to Project Management Cost Processor (PMCP), prepare cost-trend-Baseline Change Proposals (BCPs).
  • Performed random audit as part of the QA/QC program for project management / controls.
  • Project Management support for TSAP, TNAP, and Screen Development Support for DCX Kokomo Plant, Belvidere Assembly Plant.

Show More

28 Project Management Jobs

No jobs at selected location

2. Project Controls

demand arrow
high Demand
Here's how Project Controls is used in Project Controls Engineer jobs:
  • Priced project controls of construction work authorizations resulting in design/installation of Mechanical piping systems/pipe supports at Fortune 100 Utility Nuclear facilities.
  • Facilitated development of uniform project controls systems across all company divisions.
  • Supervised other project controls personnel.
  • Coordinated, led and mentored the work done by Project Controls staff, internal and external (contractors).
  • Participate with the market team in defining and managing the scope of project controls activity in the market.
  • Elaborated Project Controls policies, procedures, guidelines, forms and standards, start-ups and close-outs templates.
  • Assigned to the Pipeline & Terminals division providing Project Controls support to management on multiple projects.
  • Direct and supervise a staff of Project Controls planners and schedulers of diverse nationalities.
  • Project Controls Engineer in the planning and control area of capital investment projects.
  • Assist in the development of Planning & Project controls work Practices & procedures.
  • Project Controls Engineer - Initial Production Facilities (IPF) Project.
  • Provided Project Controls support for heavy industrial programs.
  • Project Controls Consulting Provided project controls support for local General Contractors.
  • Project Controls Engineer Lead Project Controls Engineer for tracking and reporting Cost and Schedule information to Client on fabrication of Modules.
  • Assisted with setup of Project Controls cost and scheduling tools for a newly-awarded project in Edmonton, Canada.
  • Project Controls Engineer, responsible for scheduling and cost control in the Mukhaizna Phase II Field Development.
  • Project Controls Lead for Two Joint Venture Subsea Pipeline Projects and Three Accommodation Platforms.
  • Project Controls Engineer, responsible for scheduling, reporting in the IRAQ Zubair Program.
  • Project Controls Engineer-IRAQ Zubair Program.
  • Manage Project Controls services to Bristol Myers-Squibb at Humacao & Manati Sites.

Show More

62 Project Controls Jobs

No jobs at selected location

3. Status Reports

demand arrow
high Demand
Here's how Status Reports is used in Project Controls Engineer jobs:
  • Developed monthly status reports to effectively report project progress to owner and project management team.
  • Developed project budgets, prepared project cost and status reports and developed financial forecasts.
  • Prepare and present project-specific quarterly project financial status reports to executive management.
  • Prepared senior management financial and project status reports.
  • Provided regular status reports to senior management.
  • Create and generate daily and weekly construction status reports for market management and present overall progress to AT&T.
  • Develop and maintain various schedule status reports as requested by management using SQL Server Reporting Services.
  • Prepare project status reports, monthly planners, and the final closeout reports.
  • Interacted with Project Managers to determine project reporting functions and monthly status reports.
  • Prepared and presented monthly management status reports, including cash flow and forecast.
  • Assisted Change Manager in the development and maintenance of periodic status reports.
  • Assist the Sr. Project Controls Engineer with producing project status reports.
  • Verify work progress by meeting with disciple leads for status reports.
  • Develop project schedules, review budgets and provide status reports.
  • Analyze schedules and prepare status reports for upper management.
  • Prepare project status and monthly status reports.
  • Created monthly and quarterly project status reports.
  • Prepare funds status reports and forecasts including uncosted obligations and encumbrances.
  • Prepare project status reports for Huawei management as well as on the clients.
  • Developed and maintain all periodic (weekly, monthly) cost status reports using Oracle "EnterpriseOne" (E1).

Show More

4. Baseline Schedule

demand arrow
high Demand
Here's how Baseline Schedule is used in Project Controls Engineer jobs:
  • Reviewed work progress with construction manager while monitoring the variances against baseline schedules for maintaining or recovering.
  • Analyze and evaluate forecasts and current status against established baseline schedule.
  • Monitored and analyzed work progress versus baseline schedules.
  • Developed baseline schedule and cost estimates.
  • Developed the WBS structure, Cost Account structure, Resource structure and the Activity Code structure for the baseline schedules.
  • Developed the baseline schedule for 200 sites and assisted in the management of the contractors to meet the baseline schedule.
  • Analyze, evaluate, and forecast project costs, as well as performance against a baseline schedule with critical milestones.
  • Analyzed schedule start, completion, and duration variances utilizing the baseline schedule as the approved plan.
  • Provide weekly updates to a logic driven forecast schedule and monthly updates to the baseline schedule.
  • Reviewed and approved contractor baseline schedules; verified logic, resource planning, constraints, etc.
  • Developed a baseline schedule and maintain the up to date schedule on weekly bases.
  • Developed baseline schedule for Orbital Sciences Inc., located in Chandler, AZ.
  • Developed cost and labor loaded initial and baseline schedules.
  • Planned baseline schedules, manpower estimates and funding flow.
  • Aided in development of the proposal and baseline schedule.
  • Compiled project budgeted resources through quantity take-offs to construct the baseline schedule in Primavera P6.
  • Developed main project baselin schedule and weekly baseline schedules for tracking cost and schedule.
  • Key Deliverables: Development of tender schedule, baseline schedules and work packages based on scope of work.
  • Participated in the preparation of the baseline schedule for the $4B Tappan Zee Bridge Proposal.
  • Waste Water) Create/Update cost loaded construction baseline schedules.

Show More

5 Baseline Schedule Jobs

No jobs at selected location

5. P6

demand arrow
high Demand
Here's how P6 is used in Project Controls Engineer jobs:
  • Produced and maintained long term and conceptual schedules (P6) for attractions, resorts, and other construction activities.
  • Monitored schedule and performance completion of work packages in P6 and provided miscellaneous reports to management as required.
  • Provide technical guidance to Junior Planners in aspects of P6 Software and project control processes and procedures.
  • Work with PG&E to ensure data has transferred from P6 to SAP appropriately.
  • Contributed and assisted with the development of P6 desktop manual used for DZNPS scheduling training.
  • Update P6 schedules monthly at an individual project level.
  • Establish and maintain P6 daily schedule for several projects.
  • Conduct P6 and PCM training and support.
  • Prepare and status schedules in P6.
  • Provided scheduling utilizing Primavera P6 software, quantity tracking and cost reporting for various projects within Project Controls Department.
  • Developed schedules and provided earned value reporting for new product introduction efforts using Primavera P6.
  • Developed and maintained project schedule using Primavera P6.
  • Maintain craft hours and direct subcontract dollar configuration control between QURR and Primavera (P3/P6) to insure numbers tie.
  • Manage and control all project schedule data through project management software (Primavera p6).
  • Created schedules and what if scenarios from the scope documents using Primavera P6.
  • Created resource loaded and updated schedules using Microsoft Project and Primavera P6.
  • Created and maintained all project schedule Baselines in Primavera P6.
  • Utilized Primavera Contract Manager, Primavera P6, MS Office including Word, Excel, Access, Power Point and Project.
  • Project Controls Engineer, Sappi, Duluth, MN Built and currently maintain project schedules using P6 or Microsoft project.
  • Provided daily P6 scheduling support, performed walkdowns, and prepared drawdown matrices.

Show More

3 P6 Jobs

No jobs at selected location

Job type you want
Full Time
Part Time
Internship
Temporary

6. Project Cost

demand arrow
high Demand
Here's how Project Cost is used in Project Controls Engineer jobs:
  • Coordinated analysis to measure project cost and schedule performance and quantitatively assess ability to meet Initial Operational Capability (IOC).
  • Develop and carry out bi-weekly/monthly financial meeting with several project sites to facilitate accurate cost projections for project cost reporting.
  • Developed monthly project cost budgets and forecasts following the developed cost/schedule baseline.
  • Interfaced with Project Management, Finance and Budgets to ensure accurate, timely information for project cost and schedule performance.
  • Managed all reporting of cash flows, monthly and quarterly recognized revenues, and all project cost and man-hour forecasting.
  • Mentored mid and junior level staff in areas of project cost estimation, scheduling and remedial design.
  • Provide and maintain the overall project cost, budget and schedule control in accordance with project procedures.
  • Perform project costing related reporting to the team and management's review on a monthly basis.
  • Prepare reports detailing project costs, progress, risks, opportunities and budget limitations.
  • Monitored and reported contract value, project costs and funding status.
  • Collected and performed project cost coding as needed.
  • Provided weekly project cost and schedule reporting.
  • Estimated Project cost $66 million.
  • Reported and monitored actual and forecasted total project cost for engineering, procurement and construction.
  • Report Monthly project costs to management Participate in development of project LRC (Labor Rate Calculator) in estimating.
  • Market research to preparation of project BOQ and project cost estimation.
  • Lead Project Cost Engineer and Scheduler for Alyeska Maintenance Contract.
  • Maintained Project Cost Controls in Kildrummy software.
  • Project Controls Engineer for the Fluor/Brinderson Chevron GES Project, Project Scheduler and Project Cost Analyst.
  • Cost Engineering) Duke/Fluor Daniel / Duke Energy Responsible for maintaining project cost control for two Gas Fired Turbine Power facilities.

Show More

10 Project Cost Jobs

No jobs at selected location

7. Primavera

demand arrow
high Demand
Here's how Primavera is used in Project Controls Engineer jobs:
  • Project Duties: Reviewed and monitored construction projects using Primavera scheduling software to ensure successful and timely completion of projects.
  • Introduced Primavera scheduling software into the organization, developing and documenting procedures for its use.
  • Developed Primavera manpower loaded project schedules with written progress analysis.
  • Generated financial reports using Primavera software.
  • Developed Primavera manpower loaded project schedules.
  • Analyze the critical path, changes in the scope of work, network logic, and out-of-sequence work using Primavera P3.
  • Assign project duration & resources, and prepare Target schedule in Primavera as per Client s project requirement.
  • Reviewed baseline & updated schedules and ensured conformance to contract requirements using Primavera P6, P8.
  • Test Oracle Primavera system during upgrades to ensure continuity of client's security and operations.
  • Coordinated and updated project schedules and planning documents utilizing Primavera (P3).
  • Administer a federal government client's installation of Oracle Primavera P6 software suite.
  • Updated the Primavera P6 engineering schedule from the markups of the engineering supervisors.
  • Prepare and status schedules in Primavera Project Planner (P3).
  • Provided scheduling analysis using Project Primavera (P6) software.
  • Provide resource FTE projections by discipline using Primavera 5.0.
  • Generated schedules (Primavera P6) for various projects.
  • Coached an entry level Project Engineer on Primavera software.
  • Prepared monthly manpower reports using Primavera Suretrak to provide timely information to managers.
  • Review & reconcile Primavera's budgeted and actual labor, material, & expense data and financials.
  • Scheduled in Primavera P6, Suretrak and Microsoft Project, final schedule was in Primavera P6.

Show More

16 Primavera Jobs

No jobs at selected location

8. Cost Control

demand arrow
high Demand
Here's how Cost Control is used in Project Controls Engineer jobs:
  • Assist the Sr. Project Controls Engineer with scheduling, manpower, cost control, and forecast on various projects.
  • Performed cost control, scheduling and profit analyses for engineering and procurement on industrial, power and government projects.
  • Prepared Executive Proposal Review (EPR) Reports and ensured that scheduling and cost control standards were implemented.
  • Assisted in developing a cost control procedure to monitor planned, actual, and earned value.
  • Cost Control Engineer, Project Controls Engineer (Schedule Integration) of a $154,000,000 budget.
  • Maintain and implement project cost control and reporting systems while adhering to policies and procedures.
  • Analyze work progress for payment progress, establish budget and cost control reports.
  • Provided cost control support to numerous functional groups such as security and engineering.
  • Performed cost control on daily invoicing and overall budget of $200MM.
  • Performed quantity takeoffs and input them into the cost control system.
  • Budget analysis and cost control for several Reactor Projects.
  • Created and maintained project schedules and cost control tools.
  • Provided planning and cost controlling support for all projects.
  • Develop estimates, analysis and cost control activities.
  • Monitor Schedule progress and cost control.
  • Establish and maintain Cost Control.
  • Prepared, analyzed, evaluated, processed and presented information and documentation related to the Project budget and cost control activities.
  • Provided training for maintenance and updating of schedules and cost control reports to Project Superintendents using Suretrak program software.
  • Put together standard format for scheduling and cost control to be used on all Middough construction projects
  • Maintained backcharge logs and charts-of-accounts using an in-house cost control system.

Show More

9 Cost Control Jobs

No jobs at selected location

9. Control Systems

demand arrow
high Demand
Here's how Control Systems is used in Project Controls Engineer jobs:
  • Develop and implement schedule/ cost control systems to ensure project targets are met for various engineering/design/construction projects.
  • Designed new and modified existing machine control systems-electrical, pneumatic, and hydraulic.
  • Performed research work for econometric models to establish variables control systems in major projects over 8 MMUSD during their implementation phase.
  • Implemented process monitoring and control systems for batch processing and weighing systems for unit train load-outs and coal preparation facilities.
  • Authored various specifications (VTS / SSTS / IDSR's) for chassis control systems on future hybrid vehicles.
  • Attend weekly meetings in Detroit representing GM at vendor offices engineering control systems for plant expansion.
  • Designed process instrumentation and control systems for pharmaceutical, liquid, and powder production.
  • Involved in the development of Project control systems for the Houston Metro Rail Project.
  • Designed and Retro-fitted control systems to conform with NEC, NFPA, and UL508.
  • Design, Implement and Install control systems for custom machinery for any company.
  • Design, debug and install control systems for Automatic Assembly/Test machines and systems.
  • Established and maintained cost control systems for local and International projects.
  • Analyzed customer specifications and shop drawings to design HVAC control systems.
  • Designed the building direct digital control systems to meet the specifications.
  • Manage Maintain, and upkeep of all Control Systems.
  • Maintained budget and cost control systems.
  • Designed and installed new control systems.
  • Replaced superheaters and fans, expanded economizers and upgraded secondary mechanical, electrical and control systems.
  • Core Accountabilities: Develop electrical control systems for machines and manufacturing processes as well as network architecture design.
  • Upgrade PLC Control Systems to improve High Speed Bullet Manufacturing Software included RSLogix 5000 and Factory Talk View ME.

Show More

1 Control Systems Jobs

No jobs at selected location

10. Critical Path Analysis

demand arrow
high Demand
Here's how Critical Path Analysis is used in Project Controls Engineer jobs:
  • Developed Construction Fragments for project change orders and incorporated into project schedule logic for impact and Critical Path analysis.
  • Performed critical path analysis to include impact analysis which resulted from field design changes / field modifications.
  • Used critical path analysis to examine and mitigate impacts to the completion of the job.
  • Report contractual issues with or without schedule/cost impact, Critical path analysis and forecasting.
  • Prepared monthly schedule, variance and critical path analysis reports for the Project Managers.
  • Provide critical path analysis, identify problem areas, and create work-around solutions.
  • Assisted in Critical Path Analysis of the EPC Schedule.
  • Provide critical path analysis of project schedules.
  • Trained in project lifecycle scheduling and critical path analysis for field-work as a construction project scheduler.
  • Develop CPM Network Models and Critical Path Analysis on Primavera P6.

Show More

1 Critical Path Analysis Jobs

No jobs at selected location

11. WBS

demand arrow
high Demand
Here's how WBS is used in Project Controls Engineer jobs:
  • Establish and maintain Work Breakdown Structures (WBS) for managing Master schedule, site schedule integration and Earned value management.
  • Defined an appropriate detailed WBS for projects, reported deviations to the appropriate cost control group and project manager.
  • Assisted project team in preparing WBS and updated schedules through P6 for Commercial Mall Project of 450,000 sq.
  • Created work breakdown structures (WBS) and worked closely with the engineers to prepare an update schedule.
  • Assisted in Defining work breakdown structures in SAP (WBS) for services required on the project.
  • Led development of a time-phased Work Breakdown Structure (WBS) using a rolling-wave planning approach.
  • Led development of Work Breakdown Structures (WBS) and Cost Coding Systems (CCS).
  • Establish WBS and integrated schedule with cost system to support EV reporting requirement.
  • Define project scope and create a Work Breakdown Structure (WBS).
  • Analyzed and posted budget data to specific cost and WBS codes.
  • Generate and maintain a detailed construction schedule using the WBS structure.
  • Created and developed WBS and WBS dictionary defining activities.
  • Review contractor change orders for correct WBS charging.
  • Develop baseline WBS/Control Accounts for multiple projects.
  • Review contractor invoices for correct WBS charging.
  • Establish SAP WBS for collecting costs.
  • Load EDS estimate in SAP at the lower level WBS per the EDS estimate (plan version WBS).
  • Develop WBS and CBS to track cost and revenue to Subsea and Offshore Project totaling 100 million dollars.
  • Lead the development and creation/modification of the WBS in SAP to align with the projects execution plan.
  • Optimized work management by utilizing JIRA-Agile with WBS Gantt.

Show More

1 WBS Jobs

No jobs at selected location

12. EVM

demand arrow
high Demand
Here's how EVM is used in Project Controls Engineer jobs:
  • Assisted with Project Controls System development and testing in preparation for EVMS certification and governmental compliance.
  • Support IBR coordination and reporting to customer ensuring EVM requirements are properly developed and reported.
  • Reported EVMS analysis outcome to construction management along with any possible corrective actions.
  • Support the EVMS Compliance and Reporting group for $600M/yr Department of Energy nuclear cleanup contract having EIA 748 EVMS requirements.
  • Assist in preparation of month performance reports (CPR/IPMR), review and concur for EVMS compliance all Baseline Change Requests.
  • Assisted the Accounts Payable and Procurement departments with implementation of the new charging system to align with EVMS processes.
  • Used earned value management system (EVMS) to monitor performances and calculate and analyze cost and schedule variances.
  • Interpreted cost and schedule variance using generally accepted earned value management (EVM) tools and methodologies.
  • Use EVMS to communicate work scope, work planned, resource planned, and accomplish work.
  • Reported monthly in the EVMS reporting system as to actual cost and schedule status vs. planned.
  • Earned WRPS EVMS training certification Assist control account managers and project managers as requested.
  • Work and Risk Management in scheduling daily and outages also DOE & EVM.
  • Performed Cost Reporting and Variance Analysis for the monthly CPR using EVMS techniques.
  • Support the DCMA (Defense Contract Management Agency) with EVM system surveillance.
  • Manage maintenance, operations, and construction schedules through EVMS practices.
  • Produced monthly Earned Value (EVMS) and variance analysis reports.
  • Used EVMS for cost accounting, Excel Spreadsheets.
  • Implemented EVM techniques to report project P&L for $60M in total value.
  • Implemented the EVMS for the BP PMT department.
  • Support surveillances on the program and other sister sites, interpret DOE EVM Implementation Handbook.

Show More

13. CPM

demand arrow
high Demand
Here's how CPM is used in Project Controls Engineer jobs:
  • Prepared summary level CPM schedules and presented progress to owner company executive management on a monthly basis.
  • Provided critical path method (CPM) scheduling, EVM, cost control, and planning support.
  • Created and maintained CPM schedules for engineering, procurement, installation and commissioning phases on various projects.
  • Prepare and generate the logic driven CPM schedule incorporating engineering, procurement, construction and start-up information.
  • Visited project sites to set up and train project team members in use of CPM scheduling software.
  • Coordinated and prepared financial statements and reports for the CPM and the Board of Directors.
  • Assisted in manpower leveling and progress reporting including the daily CPM forecast shutdown completion date.
  • Integrated CPM schedules with Project Management Cost Processor (PMCP) and estimating software.
  • Analyzed schedules using critical path method (CPM) and provided efficiency measures.
  • Develop and Maintain detailed CPM schedules using P6 and perform schedule analysis.
  • Performed weekly CPM schedule analysis for Constellation Brandon Shores FGD project.
  • Provided CPM schedules per direction of the Project Management Team.
  • Prepare, implement and monitor baseline CPM Project schedules.
  • Develop CPM work schedule, controls, weekly report.
  • Project planning, CPM Scheduling and Cost Engineering.
  • Access was used for downloading progress to a primavera hourly schedule using the critical path methodology(CPM).
  • Prepare project CPM schedules, reports, narrative, and time scale diagram using Primavera P3 and P6.
  • Created cost loaded CPM schedules, and reports, with appropriate level of detail using Primavera P6.
  • Developed a what-if integrated CPM schedule and adhoc schedules on request.
  • Prepare resource loaded CPM schedules using Primavera P6.

Show More

5 CPM Jobs

No jobs at selected location

14. EPC

demand arrow
high Demand
Here's how EPC is used in Project Controls Engineer jobs:
  • Worked on power, telecommunications, manufacturing and environmental projects that were either, EPC, EP/CM or engineering only.
  • Developed and executed EPC schedules for multiple 2 on 1 configuration combined-cycle gas fired turbine power plants.
  • Developed Level 3 Engineering, Procurement and Construction (EPC) schedule logic for the project.
  • Managed accruals, cash flows, and invoices for $25MM total installed cost EPC project.
  • Serve as vital contributor to multiple EPC substation projects valued at $100M+ in revenue.
  • Project consisted of an EPC Turnkey 2 on 1 Combined Cycle Power Plant.
  • Lead Project Controls Engineer for a 730-million-dollar 550MW power plant EPCM project.
  • Coordinated project controls effort on 75Mwe Biomass EPC project for Florida Power.
  • Coordinate & prepare EPC Project Schedules including Resources evaluation / loading.
  • Developed and managed Level III EPC schedule of approx.
  • Project Control Engineer for LSS, LSTK and EPCM projects
  • Oversee contractor's EPC quality activities.
  • Power Group (2 years) Performed earn value management (EVM) for EPC projects.
  • Contract price: $255 M (EPCS).
  • Continued to effectively manage project schedules by completing a multi plant EPC project for execution in South America.
  • Developed and maintained control level schedules for various EPC projects using Primavera P6 and P3.
  • Developed EPC/CPM integrated Primavera project schedules for various types of projects.
  • Project: Hanford Waste Treatment Project Contract price: $12+ billion (EPCC).
  • Worked with EPC contractor's NETCO, AMEC and Acergy.
  • Contract Work) Delivered comprehensive testing support for design enhancements to proprietary Project Controls software, ePCWorks.

Show More

15. PLC

demand arrow
average Demand
Here's how PLC is used in Project Controls Engineer jobs:
  • Installed PLC automation on autonomous mining equipment, conveying and crushing equipment, coal preparation and processing equipment.
  • Installed fiber optic cabling for security and surveillance systems, telecommunications, PLC and LAN's.
  • Developed PLC logic and safety process for laser heating system for automated fiber placement machine.
  • Release and Product and Manufacturing Engineering, Testing Validation for Safety PLC Controls.
  • Developed Interfaces between CNC's and PLC according to project's needs.
  • Performed field service PLC hardware upgrades and program modifications to existing equipment.
  • Perform load analysis on one line diagram and PLC panels.
  • Developed new PLC programs for Natural Gas Compressor Station.
  • Developed, maintained, and replaced PLC systems.
  • Validate Y2K compliance of PLC software and hardware.
  • Designed PLC control panels with remote control abilities.
  • Involved in hardware design and PLC programming.
  • Designed multiple PLC control and operation panels.
  • Program PLC operations from PERT chart.
  • Engineer and manufacture SWBD, MCC and Control Panels plus test and modify Modicon PLC programs and Maple OIT configuration.
  • Developed new PLC programs for Aera Oil Field that included 6 Steam Generators using 3 High Pressure Pumps.
  • Design PLC panel layouts and building layouts for MCC, switchgear, and control stations.
  • Conducted PLC RSLogix5000 programming, IFix programming, OPC driver configuration on high-speed system.
  • Programmed PLCs, MMI, and other campus wide software products.
  • design and code from scratch logic programs for TSX-Quantum and Momentum PLC's utilizing CONCEPT and Modsoft programming software.

Show More

6 PLC Jobs

No jobs at selected location

16. Submittals

demand arrow
average Demand
Here's how Submittals is used in Project Controls Engineer jobs:
  • Reviewed progress schedules and technical change order submittals affecting project schedules.
  • Joined the cost team and managed KPI (Key Performance Indicator) submittals from various contractors at the job.
  • Progress tracking includes procurement, submittals, RFI s, fabrication and construction with a progress status.
  • Created and ensured accuracy and integrity of contract Change Orders, RFI's and Submittals.
  • Prepare and maintaining documentation for RFI, submittals and change request logs.
  • Ensured timely close-out submittals to the client to meet market forecast goals.
  • Gather Submittals from sub-contractors to be provide for approval by Architect.
  • Processed submittals to achieve the project schedule and contract documents.
  • Coordinate forecast dates to Central Change Control regarding trend submittals.
  • Perform QA/QC on contractor schedule submittals for conformance with contract.
  • Developed and prepared daily reports, change orders and submittals.
  • Budget estimates used for funding request submittals to Congress.
  • Coordinated/maintained project submittals and Requests for Information and provided estimates and support.
  • Prepared submittals and verified that subcontractor deliveries meet the approved submittals.
  • Assigned to the Contract Compliance Group, Mr. Horan reviewed engineering and procurement submittals and supervised the change management department.
  • Track and review RFI s, Submittals, MSDS reports, Job Hazard Analyses , and Safety performance report.
  • Coordinate and monitor reviews of submittals, Requests for Information (RFI) and schedule updates.
  • Interpret design/drawings for crafts installing material; review and coordinate subcontractor submittals and RFIs.
  • Used Primavera 6 in managing and reviewing contractor schedule submittals.
  • Document control Supplier performance measurement Submittals, RFI and Procurement Log Development.

Show More

1 Submittals Jobs

No jobs at selected location

17. DOE

demand arrow
average Demand
Here's how DOE is used in Project Controls Engineer jobs:
  • Interpreted FAR, DOE, EPA, RCRA and CERCLA (Superfund) legislation, and other government regulatory documents.
  • Presented weekly and monthly schedule performance directly to DOE and LBNL, recommending corrective actions for schedule recovery and acceleration.
  • Worked as the Senior Project Controls Engineer and provided contractual support to DOE at Rocky Flats for the Residues Program.
  • Prepared SRS Records Retention Schedule for the 100+ projects underway in accordance with NARA, DOE and GSA guidelines.
  • Interfaced with DOE, Westinghouse, and Bechtel Engineering to ensure proactive implementation of necessary Project Controls tools.
  • Provided project controls services for a $579 million Department of Energy (DOE) infrastructure program.
  • Supported WTP with DOE EM HQ and DOE MA HQ on Cost and Technical Evaluations as required.
  • Review project correspondence and meeting minutes with vendors, subcontractors, the DOE and other stakeholders.
  • Created, maintained, and reported on schedule and cost performance in accordance with DOE protocols.
  • Assisted in the creation and maintenance of project control procedures in accordance with DOE Order 4300.3B.
  • Project activities were managed with Earned Value Management System and complied with DOE Order 413.
  • Prepare for and host internal and external audit team visits - KPMG, DOE.
  • Served as the secretary for the Bechtel Jacobs Co. and DOE Change Control Boards.
  • Trained DOE personnel in the use of scheduling and cost estimating software.
  • Coordinated submittal of DOE Quarterly Project Manager Progress Report for Congressional Line Item projects.
  • Project Controls Engineer Contractor for DOE at Sandia National Laboratories.
  • Attend weekly DOE project progress meetings..
  • Developed & updated project schedules (P3, P5, P6); review and validate submittals for USACE, DOE.
  • Review contractor schedules and issue status reports to USACE, USDoE, USAid, Aramco & others.
  • Conducted Design of Experiments (DOEs) to analyze and ruggedize new package designs.

Show More

2 DOE Jobs

No jobs at selected location

18. Construction Schedule

demand arrow
average Demand
Here's how Construction Schedule is used in Project Controls Engineer jobs:
  • Developed project cost budget and spending projections for overseas locations and coordinated construction schedules to maintain successful projects.
  • Develop fully integrated construction schedule using project/sub project format needed for tracking construction of plant.
  • Created construction schedules and manpower loading projections for oil and produced water injection facilities.
  • Worked many projects preparing proposal estimates and engineering/construction schedules.
  • Participated in weekly construction schedules review meetings.
  • Developed construction schedule for new commercial buildings.
  • Develop and update detailed construction schedules for underground piping and electrical, civil work.
  • Lead schedule status meetings with market management to overview and improve construction schedule progress.
  • Worked with Contractors to facilitate the integration of Design Schedules with Construction Schedules.
  • Developed and provided status detailed construction schedules, cash flow and resource projections.
  • Develop and monitor short term (2-4 week) engineering and construction schedules.
  • Developed construction schedule and basic cost reporting for small to medium capital programs.
  • Reviewed and gave recommendations on prospective construction schedules form six bidder companies.
  • Participated in the integration of Engineering, Procurement, and Construction schedules.
  • Develop field construction schedules and provide weekly reporting to project meetings.
  • Worked with the project scheduler to maintain multiple construction schedules.
  • Coordinated among the general contractor and the material / equipment supplier in order to maintain continuity of the construction schedule.
  • Review sub-contractor's construction schedules for conformity to the logic, task durations and critical activities.
  • Created integrated engineering and construction schedules, made estimates,forecasts, and quantity reports.
  • Master Construction scheduler on Sandy Storm recovery projects for NYCHA such as Coney Island and Sotomayor.

Show More

19. Value Management

demand arrow
average Demand
Here's how Value Management is used in Project Controls Engineer jobs:
  • Provide planning, scheduling and cost engineering guidance in the establishment of an Earned Value Management database system in the organization.
  • Served as document owner & Subject Matter Expert (SME) for all issues on Earned Value Management.
  • Demonstrated proficiency in baseline management, change control, trending, and Earned Value Management (EVM).
  • Prepare and Report on Earned value Management for Division Projects.
  • Implemented procedures for Earned Value Management on various projects.
  • Practiced in-depth Earned Value Management/Project Cost Controlanalysis and reporting.
  • Project Schedule review utilizing Primavera and Earned Value Management.

Show More

10 Value Management Jobs

No jobs at selected location

20. New Construction

demand arrow
average Demand
Here's how New Construction is used in Project Controls Engineer jobs:
  • Worked on projects for new construction and rehabilitation environments in excess of 100 million dollars.
  • Power Related Maintenance and New Construction Projects, Hillsboro, Oregon, Senior Project Controls Engineer.

Show More

21. Corrective Action

demand arrow
average Demand
Here's how Corrective Action is used in Project Controls Engineer jobs:
  • Assisted Project Manager in developing/reviewing cost and schedule corrective action and recovery plans, and making sure needed actions/plans are implemented.
  • Established cost baselines and calculated and evaluated variances to recommend and implement corrective actions for mitigating project risks.
  • Managed critical path activities, developing work around schedules and recommending corrective actions.
  • Implement early warning identification of potential issues and drive corrective action.
  • Analyzed computerized schedules and identified problems and recommended corrective action.
  • Monitor and analyze contractor project schedules and advise the project manager of deviations and potential problems and recommend corrective actions.
  • Provided finance analysis, identify variances, recommend corrective actions, and report progress on scope, status schedule activities.
  • Proposed and coordinated the corrective actions for reducing risks of delay, maintaining floats and improving time control.
  • Performed systematic root cause analyses to determine root cause of failures and implement appropriate corrective actions.
  • Identify and report variances to the plan, so that management may take corrective action.
  • Review progress and alert project management to possible areas of concern and recommend corrective actions.
  • Recommended corrective action, if necessary, to ensure execution of project is within budget.
  • Identify schedule trends and problem areas and recommends possible corrective actions to management.
  • Raised flag for negative trends and supported in corrective action meetings.
  • Identify any deviations from the plan and suggest corrective actions.
  • Identify cost variances from budget and initiate corrective actions.
  • Calculate and evaluate cost variances for corrective actions.
  • Initiate corrective actions to rectify problems.
  • Monitored actual versus budgeted costs, prepared trend analyses to identify specific problem areas, and submit recommendations for corrective action.
  • Provide corrective action plans as required Actively contribute to the Risk Management Process Align with client and maintain excellent client relations

Show More

22. Cost Estimates

demand arrow
average Demand
Here's how Cost Estimates is used in Project Controls Engineer jobs:
  • Prepared construction cost estimates including quantity take-off and pricing and all related documentation necessary for submitting construction bids.
  • Work with equipment vendors to develop budgetary cost estimates, manpower resource requirements and installation schedules.
  • Developed professional services staffing plan including detail cost estimates.
  • Validated and prepared cost estimates for budget deviations and incorporated into variety of project cost tools / databases to update EAC.
  • Worked with Project Managers and Cost Engineers to create cost estimates of new projects and current project costs for active projects.
  • Support procurement department with Government Fair Cost Estimates and research purchase pricing for equipment & materials required for cleanup actions.
  • Formulated the cost estimates for the bulk earthworks activities which resulted in accurate budget forecasting.
  • Assisted project managers with proposals, cost estimates, change orders and meeting minutes preparation.
  • Review and develops designs, drawings, specifications and cost estimates for various projects.
  • Analyzed field data and provided cost estimates to construct cellular transmission towers.
  • Developed and validated cost estimates for labor, material and contracts.
  • Create manpower and cost estimates for scheduled online and outage work.
  • Assist Project Control Manager with cost estimates and job close out.
  • Provided cost estimates for HLW Facility trends and change control.
  • Supported nuclear studies for various nuclear plant site cost estimates.
  • Assisted in the preparation of cost estimates for projects.
  • Developed cost estimates and schedules of projects for client.
  • Review of cost estimates related to investment projects.
  • Developed cost estimates and resource loaded Primavera P3e/c 5.0 schedules.
  • Integrated cost estimates to resource load Primavera P6 schedules.

Show More

3 Cost Estimates Jobs

No jobs at selected location

23. Refinery

demand arrow
average Demand
Here's how Refinery is used in Project Controls Engineer jobs:
  • Project Engineer - Provide engineering services for refinery expansion, operational improvement, and maintenance/repair and modernization projects.
  • Raised engineering invoice for the refinery execution project.
  • Evaluated monthly progress of a co-generation power plant turnkey project (80 million USD) for Muscat Refinery (client).
  • Cost Reporting, Budgeting, Forecasting and Analysis on Refinery Maintenance budgets and costs exceeding $150 million annually.
  • Sun Company, Point Breeze Refinery Aromatics Expansion and Cross-Country Pipeline (23 miles).
  • Lead Scheduler/Planner on fast-track turnarounds, on-site at ExxonMobil refinery in Torrance, CA.
  • Design and code programs for refinery load shedding and sequence of events schemes.
  • Provided scheduling, cost estimating, and planning for Toledo Ohio Refinery.
  • Brown & Root, Inc., Refinery Expansion Project, Shell Deer Park, TX
  • Project Experience: Reficar Refinery PCM, Delaware Refinery Projects
  • Assigned work breakdown structure code and cost elements for all the equipments / material procured for refinery and gas plants projects.
  • Oil Refinery & Light Rail Projects located in St. Paul, Minnesota & Hornell, New York.
  • Steam Turbine Outage & Exxon Oil Refinery located in Ottawa, Canada & Joliet, Illinois.
  • Project Controls Engineer - Sunoco, Marcus Hook Refinery Turnaround Planner for 15-1 Crude Unit.
  • Updated schedule in Primavera 6.0 & forecasting progress and schedule for refinery execution project.
  • Control Room HDS/LUB Units, Expansion & Maintenance Project at Cardon Refinery.
  • Project Experience: Amakpe Refinery Relocation Project, Vostok Refinery Relocation Project.
  • grant for the ClearFuels-Rentech Integrated Biorefinery Pilot Project.
  • TAR Scheduler at the El Segundo Chevron Refinery for the FCCU TAR, Included Pre TAR and TAR Scheduling.
  • Cost Estimating and AFE approval accountabilities: Worked as the project Gatekeeper for all refinery capital and maintenance projects.

Show More

24. RFI

demand arrow
average Demand
Here's how RFI is used in Project Controls Engineer jobs:
  • Raise RFI S with complete required documents and carryout the relevant inspections as per the approved quality inspection plans.
  • Raised RFI'S with complete required documents and updated them on as built drawings.
  • Assist Project Manager in generating & keeping track of RFI's.
  • Prepared construction contract correspondence Coordinated request for information (RFI) process and correspondence flow for change orders and modification.
  • Organized Contract Documentation, RFIs, Change Orders, Liens & Close-Out forms for Project Manager.
  • Provide initial technical review of RFI and submittals for conformance to project requirements.
  • Developed RFIs and change orders.
  • Managed between 500 to 1000 submittals and RFIs per project for multiple projects, simultaneously.
  • Prepared and reviewed RFI bid estimates with Project Manager and uploaded into Primavera Unifier.
  • Completed construction cost estimates under the pre turfing contract with AT&T/Cingular.
  • Create and submit RFIs and Transmittals.

Show More

25. Breakdown Structure

demand arrow
average Demand
Here's how Breakdown Structure is used in Project Controls Engineer jobs:
  • Maintained work breakdown structures by calculating critical path and analyzing various methods to mitigate schedules.
  • Established work breakdown structure (WBS), determine the work activity duration and establishing the proper work flow logic ties.
  • Verified that cost and man-hours are allocated to the correct cost codes according to the Work Breakdown Structure (WBS).
  • Assigned and developed work breakdown structure (WBS) via SAP, numbers for tracking and auditing purposes.
  • Analyzed and developed a new (WBS) Work Breakdown Structure for activities during the awarding process.
  • Maintained and controlled integrated schedules, Work Breakdown Structures (WBS), and tracked project finances.
  • Prepared, updated and controlled INP II Organization Breakdown Structure (OBS) and Monthly Progress Report.
  • Prepare the work breakdown structure (by WBS or Cost Code) and detailed activity/cost accounts.
  • Developed baseline work breakdown structure for multiple projects from $5M to $75M.
  • Created a work breakdown structure and allocated the resources to the activities.
  • Created Work Breakdown Structure, Organization Breakdown Structure and Cost Breakdown Structure.
  • Established Work Breakdown Structures (WBS) with budgets.
  • Analyze work breakdown structure to complete cost forecast.
  • Prepared standard Work/Cost breakdown structures.
  • Establish appropriate Work break down structure (WBS) and cost breakdown structures (CBS).
  • Assisted in development of the project WBS (Work Breakdown Structure) Attended weekly team and management review meetings.
  • Reviewed supplier invoices to ensure proper compliance with the pre-defined Work Breakdown Structure and to check for errors.
  • Forecasted project cost by using work breakdown structure (WBS) and issued monthly.

Show More

26. Master Schedule

demand arrow
average Demand
Here's how Master Schedule is used in Project Controls Engineer jobs:
  • Coordinated the schedule from multiple subcontractors and incorporated information gathered into the overall project master schedule.
  • Developed Engineering, Procurement, Construction schedules, including integrating multiple schedules into overall master schedule.
  • Incorporate individual sub-contractor's construction schedules into the master schedule.
  • Updated the design progress activities of the BB Bond program into the Master Schedule and generated monthly reports for executive management.
  • Developed Systems Level schedules (MSP 2010) with PRT leads to form master schedules with meaningful critical paths.
  • Worked with managers and leads to plan and develop a detailed construction schedule, while incorporating DOW master schedule.
  • Ensured supplier adherence to product schedules by maintaining master schedule dates and managing supplier status meetings as needed.
  • Compiled Level 4 monitoring documents (Excel) detailed to sort and feed to the Master Schedule.
  • Compile milestone data to create or update the integrated master schedule (IMS) for selected projects.
  • Developed the project master schedule and approved detailed contractor work plans and code of accounts.
  • Reviewed Prime Contractor's schedules of values for incorporation into a cost loaded master schedule.
  • Established Integrated Master Schedule, top-level milestones, and initial cost and schedule baseline.
  • Updated the BB Bond Master Schedule and tailored reports for management.
  • Optimize, maintain and progress master schedules for capital project programs.
  • Worked on the JPB Capital Master Schedule Database.
  • Integrate sub schedules into master schedules.
  • Integrated Vendor and In-Plant requirements, deliverables, and resources into a master schedule.
  • Develop and monitor the status of the project deliverables and detailed master schedule.
  • Review plans during the master schedule preparation of pre-construction.
  • Assure contractors schedule "engineering and construction" are in alignment with the project teams master schedule.

Show More

27. Monthly Cost Reports

demand arrow
average Demand
Here's how Monthly Cost Reports is used in Project Controls Engineer jobs:
  • Monitored cost reports and provided weekly/monthly cost reports.
  • Prepared, maintained, and analyzed weekly and monthly cost reports, funding analyses and project cost forecasts.
  • Created monthly cost reports for LENA designed process plants by utilizing earned value methodology in SAP systems.
  • Provided region with monthly cost reports for all work plans included within the project.
  • Monitored cost reports and provided weekly and monthly cost reports to my Project Manager.
  • Integrate out spreadsheets onto PowerPoint presentations for the monthly cost reports.
  • Compiled weekly progress reports and monthly cost reports for client representatives.
  • Developed and updated the project budget and developed monthly cost reports.
  • Provide monthly cost reports including earned value and budget forecast.
  • Organized, compiled and presented monthly cost reports to management.
  • Produced monthly cost reports and progress completion reports.

Show More

28. Bechtel

demand arrow
average Demand
Here's how Bechtel is used in Project Controls Engineer jobs:
  • Participated in project controls training modules for scheduling and cost to satisfy Bechtel University requirements
  • Used Bechtel proprietary estimating software.
  • Update scheduling systems for both Bechtel and AT&T databases to reflect site development and construction milestone achievements and forecasts.
  • Provided Project Controls division level support and High Level Waste organization support as part of the Bechtel Rotation Program.
  • Rice was assigned to the Bechtel Jacobs-Portsmouth, OH project controls group, where she provided project controls services.
  • Facilitate training and delegate tasks of Project Controls interns/college hires in Bechtel and AT&T cost systems.
  • Received Bechtel Spot Award for resolution on $10M for site true-ups, change orders and accounts payable.
  • Directed the cost, planning, and scheduling of the Bechtel Nevada Engineering Department design activities.
  • Supported and developed the Containment Closeout schedule for Williams Plant services and Bechtel construction groups.
  • Trained several people on how to operate and update (Bechtel Internal Scheduling System).
  • Instruct and Develop local Iraq Bechtel personnel in the skills of cost and scheduling engineering.
  • Recognized by the Bechtel Corporate management team for the accuracy of the quarterly report.
  • Served as Chief Cost Engineer and Principle Project Controls Engineer for Bechtel Power Corporation.
  • Trained new Teammates on Bechtel's document control application and archive processes.
  • Project Controls Engineer with The Spear Group under Bechtel Power Corporation.
  • Presented the estimate to the client and Bechtel management.
  • Reviewed, analyzed, and approved schedule change notices submitted from the contractors (Bechtel Power Corp / Ebasco).
  • Performed employee timesheet audits and search using (Bechtel Electronic Time Record) & (Controller Reporting System).
  • Perform financial "true-up" adjustments for completed and cancelled sites for the financial close between Bechtel and AT&T.
  • Awarded "Certificate of Achievement" for assisting in making group the most profitable project in Bechtel's business line.

Show More

29. Variance Analysis

demand arrow
average Demand
Here's how Variance Analysis is used in Project Controls Engineer jobs:
  • Provide timely variance analysis and an early warning to management on critical or near critical activities.
  • Tracked deviation of project progress from scheduled figures and performed variance analysis.
  • Review and analyze performance and variance analysis reports.
  • Generated variance analysis for monthly cost performance report (CPR) and weekly Earned Value reports.
  • Included the development of cost estimates, variance analysis and control activities.
  • Performed variance analysis of monthly cost changes.
  • Prepare monthly Variance Analysis Reports.
  • Develop monthly spend forecasts, estimates at completion, and variance analysis documentation Input weekly project status into Primavera P6 schedule.
  • Coordinate timely submittal of team files, including trend reporting, variance analysis and updates to current and outyear forecasts.

Show More

30. Management System

demand arrow
low Demand
Here's how Management System is used in Project Controls Engineer jobs:
  • Managed and coordinated the complete installation of building management systems, including engineering, programming and system commissioning.
  • Experienced in Earned Value Management Systems, utilizing analysis tools and taking corrective actions as required.
  • Project required integration of existing waste management system with additional systems, upgrades and modernization.
  • Support in implementing the change management system and preparing required documentation for processing changes.
  • Develop and maintain cable material ordering/management system for electrical subcontract package.
  • Deployed US Army Corps of Engineers' Project Management System as a Local Configuration Manager at South Atlantic Jacksonville district.
  • Imported and managed data from the accounting and management systems for generating cost and revenues analysis and financial reports.
  • Developed Earned Value Management System (EVMS) training courses/modules (~14 topics) and provided training instruction.
  • Develop senior management reports, look ahead schedules, variations order management system and cost reports.
  • Lead member of the construction team during the validation of the earned value management system.
  • Utilized Earned Value Management System (EVMS) as budgeting tool.
  • Understand and apply the TE procedures forming the Quality Management System.
  • Entered all receipts and purchase orders into View Point management system.
  • Participated in the 2014 TWPC Earned Value Management System Desktop Audit.
  • Involve with implementing and stewarding the change management system.
  • Entered Scope into Budget Management System-Tool for Tracking Cost.
  • Updated Cost Management system monthly.
  • Major accomplishments/highlights: Assist project manager in increasing project profits by utilizing change management system.
  • Assisted in obtaining acceptance by the Office of Engineering and Construction Management for NRELs Earned Value Management System.
  • worked in developing and statusing Earned Value Management System integrated schedules and cost reports per NASA requirements.

Show More

31. Construction Management

demand arrow
low Demand
Here's how Construction Management is used in Project Controls Engineer jobs:
  • Support construction management with critical path schedules.
  • Worked with the construction management and the purchasing department in the bid process, evaluation, and awarding of work packages.
  • Performed earned values analysis on capital work projects, and worked as the client representation on Construction Management jobs
  • Provided construction management services on numerous wireless projects throughout the United States for AT&T Wireless.
  • Worked together with construction management and engineers with day to day construction activities and sequencing.
  • Schedule and conduct project meetings with contractors and owner's construction management group.
  • Supported office of Construction Management (CM) field staff in CM-related activities.
  • Monitor contract status & compliance for all project construction management group contractors.
  • Reviewed Engineering/Construction Management contractor's +/- 10% estimate with Project Manager.
  • Tracked & followed through field variances for senior construction management approval.
  • Provided on-site Pharmaceutical Construction management services to Abbott Laboratories at their Waukegan Lakefront Plant.
  • Schedule Engineer for the Construction Management of Bridgestone/Firestone Tire Plant.
  • Coordinated with construction management team to assure that plant equipment and bulk material arrive on jobsite according to the project schedule.
  • Seconded to ConocoPhillips Alaska as a team member of the Construction Management Group at Conoco's Alpine satellite facility.
  • Oil & Gas Industry Engineering, Procurement and Construction Management.

Show More

32. HMI

demand arrow
low Demand
Here's how HMI is used in Project Controls Engineer jobs:
  • Worked with plant personnel to establish network connectivity to PLC/HMI control systems on existing development/production equipment.
  • Saved client an estimated $300K by NOT using AB Data Server, AB Historian, and AB HMI systems.
  • Program, configure, and test SCADA based Master Control Station (MCS) server software and GUI/HMI software.
  • Programmed and configured an HMI touch screen, which was used to operate the cheese Ritz cracker production line.
  • Program and debug PLC's, HMI's, and various safety devices during field install and support.
  • Assist in the simulation of the PLC ladder logic and HMI screens.
  • Developed PLC logic and HMI Screens for manual and automatic operation.
  • Perform programming of the human machine interface (HMI).
  • Utilized Allen Bradley rack processors and Panelbuilder32 HMI's.
  • Developed FactoryTalk View SE HMI v8.0.
  • Developed HMI operator screens, and a technical manual for Foundation Fieldbus applications, and became familiarized with motion control systems.
  • Created central control and monitoring station (redundant PC with IA-HMI and MS-SQL ) to control and store data for reporting.
  • Developed and re-wrote Allen Bradley Factory Talk HMI and RSLogix 500 / 5000 PLC code.
  • Develop and program PLC and HMI platforms according to functionability document on automated control systems.
  • Developed Beckhoff TwinCat SoftPLC and HMI Graphics for Oil Water Separation prototype plant.
  • Configured HMI screens, configured backup schemas.
  • Batch Remediation Project Hands on Project Manager, programmed RsLogix PLC5 and upgraded IFix HMI.
  • Utilized modbus addresses to communicate Unitronics with the C-More HMI for the Emerson Servo.
  • Developed HMI using Inductive Automation ( Ignition 7.4 ).
  • Developed Wonderware HMI with Intouch and Archestra.

Show More

1 HMI Jobs

No jobs at selected location

33. Cost Analysis

demand arrow
low Demand
Here's how Cost Analysis is used in Project Controls Engineer jobs:
  • Verified and evaluated subcontractors submitted variation orders, prepared comparative cost analysis and make payment recommendations to management.
  • Conducted cost analysis, monitored contractor services and general administrative expenditures.
  • Cost analysis/control and financial forecasting for multiple construction projects.
  • Maintained accurate project cost analysis.
  • Provided cost analysis to Project Engineers and Cost Leads as well as tracked and managed cost and progress of all projects.
  • Managed forecasting, project cost analysis, cash flow and working capital management for over $9 million of revenue.
  • Provide special cost analysis support to Project Engineers and Management as needed, utilizing a number of standard cost tools.
  • Reviewed and analyzed the PMT FY14 baseline budget, cost analysis, resource analysis and Estimate to Complete analysis.
  • Reported status to management with documents as milestone charts, progress tracking, and cost analysis.
  • Provide monthly reports, cost analysis and forecast reporting to Soil and Groundwater Remediation project.
  • Develop manpower utilization curves and staffing plans, provide and support data and cost analysis.
  • Created weekly status report and performed cost analysis and control using MS Access and Excel.
  • Developed cost analysis data for entire project by state and county for Finance team.
  • Cost analysis by providing client with monthly cash flow snapshots.
  • Perform ad-hoc financial analyses on budgets, cost analysis, accounts receivable, accounts payable, inventory and available cash.
  • Compiled and presented reports on schedule and cost analysis to project leads, sr. management and customer as needed.
  • Prepared P5-based cost analysis and assist with the pre-negotiation plans.

Show More

34. Schedule Performance

demand arrow
low Demand
Here's how Schedule Performance is used in Project Controls Engineer jobs:
  • Performed the monitoring, control and reporting of the cost and schedule performance of the airport project estimated at $45M.
  • Perform briefings as required (several times per week) and advise managers on schedule performance, risks, and forecasts.
  • Monitored and reported the schedule performance of the projects to the project manager and the client.
  • Tracked project costs, commitments, schedule performance and monitored performance against the baseline.
  • Monitor & report critical path and schedule performance of the project.
  • Performed outage cost and schedule performance reporting.
  • Maintained project drawing database, monitored schedule performance and interfaced with all major disciplines to increase program efficiencies.
  • Analyze monthly cost and schedule data, and develop reports to evaluate cost and schedule performance

Show More

35. Document Control

demand arrow
low Demand
Here's how Document Control is used in Project Controls Engineer jobs:
  • Implemented site job procedures and management of office administration staff, including financial support and document control.
  • Developed and maintained document control and filing procedures for project documents.
  • Mentored and supervised Project Controls and Document Controls personnel.
  • Developed and implemented a new document control system.
  • Developed project document control processes for long-term storage.
  • Hired and supervised document control personnel.
  • Relocated to Atlanta HQ for Construction Projects, engaged in all aspects of Scheduling, Planning, Cost and Document Control.
  • Developed a Construction Planning Schedule and Document Control System for Construction Projects in Alabama, Georgia, California and Texas.
  • Follow up the completed installation with as-built drawing updates and transfer to the document control and maintenance instrumentation groups.
  • Worked with IT and Document Control to maintain electronic data archives of the project's vital records.
  • Developed and maintained overall cost and schedule, Document Control and Cost Accounting.
  • Ensured project document controls were in compliance with contract requirements and standards.
  • Maintained and implemented all cost controls, and document control systems.
  • Drafted and Implemented procedures for Document Control and Change Management.
  • Performed document control duties on occasions.
  • Maintained records and document control.
  • Plan distribution and document control.
  • Complete responsibility for the application of the computerized Document Control System, particularly in monitoring the General Contractor's operations.
  • Set up Document Control system for engineering and construction groups for project drawing transmittals and correspondence files.
  • Document control Purchase order status and updating.

Show More

3 Document Control Jobs

No jobs at selected location

36. Schedule Development

demand arrow
low Demand
Here's how Schedule Development is used in Project Controls Engineer jobs:
  • Facilitate schedule development and maintenance with engineering, licensing, permitting, procurement and construction.
  • Work duties involve cost engineering and schedule development/maintenance on multiple Transmission and Substation projects.
  • Project 3: Schedule development for railroad spur construction and, related civil work for protecting pipelines beneath the railroad tracks.
  • Trained in cost estimating, analysis, control activities, schedule development, maintenance, reporting and monitoring activities.
  • Assisted in proposal schedule development meetings; created P6 schedules based on input from engineers and management.
  • Perform cost engineering, analysis and control activities, schedule development, maintenance, and monitoring activities.
  • Project 2: Schedule development for retrofitting two bulk handling docks to liquid handling docks.
  • Developed, published, and maintained standards for project schedule development and execution.
  • Managed schedule development; maintenance, monitoring, and recovery plan activities.
  • Developed activity sequencing and logic ties for P3 schedule development.
  • Worked closely with Project Management and Engineering Group Supervisors and staff to coordinate and strategize on schedule development.
  • Job Description/Level of Responsibility: Engineering schedule development, assigning resources.
  • Coordinate and support pre-outage planning for service projects (schedule development, parts list development, drawings, etc.)
  • Project 6: Proposal schedule development for a Hexion Meter Connection/ Methanol Pipeline project.

Show More

37. Schedule Analysis

demand arrow
low Demand
Here's how Schedule Analysis is used in Project Controls Engineer jobs:
  • Determined corrective actions by evaluating performance measurement, earned value, and cost/schedule analysis.
  • Schedule analysis for identification of Critical Path activities providing input for schedule recovery plan.
  • Performed weekly schedule analysis between Baker schedule and master project schedule.
  • Provide detailed schedule analysis to support project management.
  • Developed cost, project resource, and schedule analysis with daily reports of financial accounting as required by project teams.
  • Monitored progress, maintained PSFR's, Change Control, cost & schedule analysis, claims avoidance.
  • Complete Cost and Schedule Analysis of EPC and other contracts awarded for the project.
  • Perform schedule analysis and what-if scenarios for project team to make flexible long-term plans.
  • Update schedule, perform schedule analysis, and identify critical path, schedule deviations.
  • Forecast project cost and schedule analysis and flags early warnings for corrective action.
  • Provided schedule analysis for critical path, 2-Week, 4-Week Look Ahead schedules.
  • Prepared various spreadsheets such as material delivery, Plan and Schedule Analysis.
  • Perform cost and schedule analysis for a $400 million construction project.
  • Perform PERT risk schedule analysis on contractors schedules Create/update Work Breakdown Structure and time-phased budgets.
  • Assess forecasted costs to assist in financial and schedule analysis by maintaining project cash flow

Show More

38. Project Performance

demand arrow
low Demand
Here's how Project Performance is used in Project Controls Engineer jobs:
  • Support Program Governance process by attending monthly Governance meetings and reviewing project performance status.
  • Reviewed and analyzed project performance and assisted PM in understanding financial issues and performance.
  • Develop and present specialized project performance reports to various project stakeholders.
  • Analyzed project performance, recommended and implemented action plans.
  • Automated processes and data flow to Company's and Client's various financial and Project Performance Reporting Systems.
  • Measured project performance, and maintained accuracy and timeliness for monthly cost reports issued to project team.
  • Monitored project performance, analyzed and managed schedule updates, and reviewed manpower and cost progress.
  • Prepare project performance, earned value management, trend analysis and cash flow reports.
  • Provided project performance report, cost control and earned value analysis.
  • Track and monitored project progress, and prepared project performance reports.
  • Printed project performance reports from PARS.
  • Developed and maintained and engineering management project status book that included analysis on project performance and recovery plans.
  • Performed as Project Controls Engineer II supporting cost, scheduling, engineering, construction, start-up, and project performance.
  • Manage project cost flow and provide full cost engineering Evaluate project performance Recommend action plans

Show More

39. Capital Projects

demand arrow
low Demand
Here's how Capital Projects is used in Project Controls Engineer jobs:
  • Manage Capital projects Master schedules for major capital projects for Coal Generating Power Distribution projects.
  • Developed master project schedule through an application service provider which included worldwide major capital projects.
  • Served as in-house client key player of Capital Projects; Appraise, Selected, Defined, and executed type process.
  • Manage of capital projects, Control of project man-hours and spending of monies.
  • Participated on teams for major capital projects for Design/Build and Turnkey construction projects.
  • Manage capital projects for (3) facilities in USA and Canada.
  • Assist engineers on capital projects progress tracking and compliance with budget.
  • Support multiple small capital projects.
  • Updated company's SAP Work Breakdown Structure for major capital projects to align with company work practices and industry benchmarking requirements.
  • Manage all cost control aspects for capital projects for DuPont Agricultural (DACI) and Dupont Electronics (DEMI) Plants.
  • Key Achievements: Successfully managed and implemented 10 capital projects within a year, all on time and on budget.
  • Project Controls services at Humacao Site are for the following two (2) Capital projects.
  • Started as Cost Engineer and then later became Scheduling Engineer on very large capital projects in the petrochemicals industry.
  • Contract) Chevron Global Downstream, Global Refinery Division - Worked on the Pascagoula Refinery Major Capital Projects.

Show More

40. Schedule Updates

demand arrow
low Demand
Here's how Schedule Updates is used in Project Controls Engineer jobs:
  • Maintained files, contracts administration, change-to-contract processing, schedule updates and financial reporting.
  • Prepared monthly progress reports along with monthly schedule updates, prepared three week look-ahead schedule, and monitored progress.
  • Worked with regional offices and consolidated cost & schedule updates from 7 regional projects into one Master project.
  • Prepare detailed cost summary reporting, project schedule updates, budgeting, forecasting and analysis of cost.
  • Provide project schedule updates to work leader on a monthly basis as required.
  • Performed schedule updates and general maintenance on the baseline Master Program Schedules.
  • Assisted contractor in correcting their schedule and monitored and reviewed schedule updates.
  • Conducted weekly cost and schedule updates, along with analysis and reporting.
  • Prepared monthly schedule updates and weekly look ahead schedules.
  • Used the Claim Digger application to document schedule updates.
  • Prepared monthly schedule updates, reports, analysis.
  • Assisted senior engineers with schedule updates and narratives.
  • Assist in schedule updates utilizing Primavera.
  • Reviewed meeting minutes, schedule updates, litigation depositions, develop as-built schedule to carry out retrospective root cause delay analysis.
  • Provided support with preparing engineering and construction critical action reports, schedule updates and reviews as well as planning analysis.
  • Created spreadsheets in MS Excel to compute the Estimated Cost at Completion Provided schedule updates and reviewed schedule logic
  • Provided cost forecast to complete and P-3 Primervera cost and schedule updates, manpower forecasts, and startup scheduling.
  • Generated weekly schedule updates, look-aheads, and daily contractor/earned value time cost reports.

Show More

41. Risk Analysis

demand arrow
low Demand
Here's how Risk Analysis is used in Project Controls Engineer jobs:
  • Prepared schedule risk analysis to forecast schedule contingencies and related cost impacts to support contingency management.
  • Risk Analysis and report any potential deviation in early stage to implement Risk Mitigation Program.
  • Involved in project estimate reviews, risk analysis, and procurement planning.
  • Utilized Access database for maintenance of risk registers and Pertmaster for qualitative risk analysis.
  • Experience interfacing P6 with Microsoft Project and Intaver RiskyProject for project risk analysis.
  • Schedule Risk Analysis (Montecarlo and Primavera tools).
  • Risk Analysis Estimated cost risk using @Risk for developing project cost contingencies Analyzed schedule risk using Primavera Risk Analysis.

Show More

42. Autocad

demand arrow
low Demand
Here's how Autocad is used in Project Controls Engineer jobs:
  • Maintained all system documentation in AutoCAD.
  • Design automation projects, including work with AutoCAD prints, PLC Software, and Parts Ordering.
  • Use AutoCAD to produce and edit Electrical Schematics and as Built Drawings.
  • Assisted in development of CAD (AutoCad) standards for my department.
  • Prepare and draft electrical drawings and manufacturing details using AutoCAD 2000/2002/2004.
  • Develop electrical drawings using AutoCAD 2012 once upgrades are complete.
  • Control panel and electrical schematic design using AutoCAD 2004.
  • Modified AutoCAD drawings to reflect as-built conditions.
  • Develop engineered design on AutoCAD along with electrical materials procurement for job completion.
  • Detailed Front End Engineering and Design (FEED, CAD, AutoCAD and Microsoft Office) experience for various projects.

Show More

43. Value Analysis

demand arrow
low Demand
Here's how Value Analysis is used in Project Controls Engineer jobs:
  • Performed monthly earned value analysis and cost analysis to identify potential problems ahead of time.
  • Conducted earned value analysis and an integrated outage schedule including plant self- performed activities.
  • Developed Micro-frame Program Management model for earned value analysis of projects.
  • Prepared plan, schedule, risk, man power load and cost performance reports using earned value analysis.
  • Performed earned value analysis to review the progress of work based upon the project plan.
  • Perform detailed Earned Value Analysis for projects worth over $300 Million.
  • Conduct earned value analysis and asses delays and bottlenecks.
  • Perform Earned Value Analysis (EVA).
  • Earned value analysis and reporting.
  • Perform Earned Value Analysis (EVA), LookAhead, Resoure Leveling and Optimization.
  • Conducted earned value analysis and input earned value into Primavera P3 schedule.

Show More

44. SPI

demand arrow
low Demand
Here's how SPI is used in Project Controls Engineer jobs:
  • Monitor and update the master schedule for a 23,400 SF modernization project for an existing hospital using P3.
  • Volunteered at the University of Michigan Hospital, Ann Arbor Homeless Shelter, and Ann Arbor YMCA.
  • Implemented and update the Master Schedule for the Hospital Building Program.

Show More

45. EAC

demand arrow
low Demand
Here's how EAC is used in Project Controls Engineer jobs:
  • Coordinated and prepared the budget and expenditures each year for project implementation, in order to achieve optimization of resources.
  • Maintain all contracts documents and correspondences, analyze the risk assessment and raise concerns over critical aspects of each contract.
  • Assisted well established senior project controls personnel mainstream their work to be more efficient and reduce time at each task.
  • Travel to other offices to teach employees how to use newly deployed SAP Investment Project module.
  • Project Scheduling Engineer with Gilbert/Commonwealth, Oak Ridge, Tenn. MMES Advanced Neutron Source Reactor Project.
  • Conducted yearly audits and accruals accumulation of outstanding invoices for each fiscal year end.
  • Developed the Work Breakdown Structures (WBS) with each organizational subject matter expert.
  • Developed a project schedule with resource plan and budget for the MIPS nuclear reactor.
  • Review & evaluate schedule duration's for each disciplines activities to meet project milestones.
  • Developed Risk Register based upon each WBS element for Monte Carlo analysis.
  • Performed schedule control for the $32M MIPS nuclear reactor development project.
  • Provide monthly reports to the project managers for each of their jobs.
  • Reviewed contracts to determine documentation required for each phase of project.
  • United Engineers & Constructors C-Reactor K Reactor Mods & Seismic Improvement Project
  • Prepared Project Estimates and maintained Change Control for each Project.
  • Minimized regulatory costs by 10% for each responsible party.
  • Forecast labor and cost on the project each month.
  • Evaluate each change orders for impact on master schedule.
  • Forecasted Estimate to Complete (ETC) and Estimate at Completion (EAC) based on current trends and known constraints.
  • Maintained monthly EACs on all projects.

Show More

46. MW

demand arrow
low Demand
Here's how MW is used in Project Controls Engineer jobs:
  • Established closer working relationships and fostered better teamwork with superintendents who had not previously coordinated with Change Management Group.
  • Run reports and queries from PrismWeb for project, proposal and overhead numbers for sector, operations, and project managers.
  • Served as the office s coordinator and contact person for job cost reporting systems (internet-based PWEB, and PRISMWEB).
  • Tracked MW installation from the start of the delivery to installation of MW radios up to Commissioning and Acceptance Test.
  • Project Controls Manager for balance-of-plant engineering team on $1.3 billion, 1,200 MW grassroots combined cycle power plant.
  • Developed and maintained outage schedules and contractor coordination for two 650MW power units in New Madrid, Missouri.
  • Demonstrated teamwork by interfacing with all Engineers & Project Managers for weekly status reporting and issue management.
  • Project: Fountain Valley Power Project; 240 MW Simple Cycle Peaking Power Plant.
  • Project: Dell TPS Power Project; 580 MW Combined Cycle Power Plant.
  • Managed and processed budget transfers and change order budget changes in PrismWeb.
  • Cost Lead on a 320-million-dollar Direct Labor 720MW power plant construction project.
  • Opened cost codes in PrismWeb and Heavy Job for specified projects.
  • Provide scheduling services for other MWH offices
  • Single cycle power plant project (Four Gas Turbines 150 MW each)
  • Integrated Project Schedule of $752 million, 500 MW Weston-4 Power Project, at Wausau, WI.
  • Ridge Generating Station, LP (44MW Wood and Tire-Fired Power Plant) - Lakeland, Florida.
  • Project Planner for SNUPPS project, five 1150 mwe nuclear generating plants utilizing a standard plant design.
  • Provide PrismWeb, Pworks, PWEB and Forecast support to staff.
  • Power City Partners, LP (79 MW Combined - Cycle Cogen.
  • Fired Boilers Orion Power, Baltimore, Maryland 240 MW Combined Cycle Cogeneration Plant-Port St. Lucie, Florida

Show More

47. CPI

demand arrow
low Demand
Here's how CPI is used in Project Controls Engineer jobs:
  • Calculate Earned Value, publish reports, analyze cost and schedule variances, CPI, SPI, EAC.
  • Supported the DOE and government required EVMS reporting, by week and month with CPI and SPI calculations.
  • Provided earned value through SPI & CPI reports on a weekly basis.
  • Performed Cost Engineering analysis and prepared Earned value (CPI, SPI, BAC, EAC, VAC, etc.)
  • Achieved a SPI of 1.0 and a CPI of 0.98 for the fiscal year for the project.

Show More

48. Construction Activities

demand arrow
low Demand
Here's how Construction Activities is used in Project Controls Engineer jobs:
  • Monitored critical path and float for construction activities driving a mechanical completion and commercial operation end date.
  • Identify construction activities, logic relationships, and predecessor/successor logic.
  • Tracked start up progress and acted as liaison between the completion of critical construction activities and the commencement of commissioning activities.
  • Provide centralize planning and scheduling services to complete engineering, procurement, and construction activities for assigned projects.
  • Schedule and progress all construction activities in P6 for multiple projects.
  • Progress and maintain the schedule for all construction activities.
  • Coordinated site construction activities for plant modules fabricated in Japan and shipped to Al Jubail.

Show More

49. Weekly Basis

demand arrow
low Demand
Here's how Weekly Basis is used in Project Controls Engineer jobs:
  • Prepare and issue a 2 week look-ahead for each project on a weekly basis to be discussed in project weekly meetings.
  • Leaded communication among different parties and reported the progress status of project activities to VP-Engineering on a weekly basis.
  • Meet with Owner's, Architects and Consultants on a weekly basis to go over any outstanding issue's.
  • Report to Business Manager on a weekly basis progress and status of projects and work assignments.
  • Analyzed, tracked, and justified variances against the baseline on a weekly basis.
  • Coordinated reporting from Perth, Australia office to client on a weekly basis.
  • Updated and modified project schedules on a weekly basis depending on project performance.
  • Generate cost reports on a daily and weekly basis for a turnaround project.
  • Maintain detailed Project Schedule for all project processes on a weekly basis.
  • Maintained the accurate current project cost status on a weekly basis.
  • Track and report team hours and expenses on a weekly basis.
  • Updated both Engineering and Procurement schedules on a weekly basis.
  • Updated the project schedules on a daily and weekly basis.
  • Updated P6 schedule on weekly basis.
  • Balanced and forecasted a $1.9 million staffing and man hour budget on a biweekly basis.
  • Developed a Transition Schedule using Primavera P6 and updated progress on a Weekly Basis.

Show More

50. Cost Data

demand arrow
low Demand
Here's how Cost Data is used in Project Controls Engineer jobs:
  • Analyzed monthly cost data and investigated billing discrepancies mitigating accounting re-work.
  • 1Maintained cost data for commercial nuclear capital construction project.
  • Monitor SAP for accurate cost data from contractor systems and DuPont sites and ensured invoices are accurately recorded against the project.
  • Implemented a plan to provide new statistical cost data for capital equipment to P&G project managers.
  • Assist project managers with the completion of cost data that is used in phased project authorization presentations.
  • Accumulate, evaluate and document historical cost data for the development of future estimates to complete.
  • Gathered detail cost data to support boiler tube rework claim on a coal fired boiler.
  • Perform cost data analysis and identify cost trends and schedule impacts for management attention.
  • Prepare and analyze comparisons of scope, quantities, and cost data.
  • Use, develop and oversee maintenance of cost database.
  • Provide cost data to assist in project estimating.
  • Transfered labor time and cost data from company voucher system into P6.

Show More

Project Controls Engineer Jobs

NO RESULTS

Aw snap, no jobs found.

20 Most Common Skills For A Project Controls Engineer

Project Management

23.4%

Project Controls

11.5%

Status Reports

8.4%

Baseline Schedule

5.3%

P6

5.0%

Project Cost

4.6%

Primavera

4.5%

Cost Control

4.5%

Control Systems

3.8%

Critical Path Analysis

3.8%

WBS

3.7%

EVM

2.7%

CPM

2.7%

EPC

2.7%

PLC

2.7%

Submittals

2.3%

DOE

2.2%

Construction Schedule

2.1%

Value Management

2.1%

New Construction

2.1%
Show More

Typical Skill-Sets Required For A Project Controls Engineer

Rank Skill
1 Project Management 16.8%
2 Project Controls 8.2%
3 Status Reports 6.0%
4 Baseline Schedule 3.8%
5 P6 3.6%
6 Project Cost 3.3%
7 Primavera 3.2%
8 Cost Control 3.2%
9 Control Systems 2.7%
10 Critical Path Analysis 2.7%
11 WBS 2.7%
12 EVM 2.0%
13 CPM 2.0%
14 EPC 2.0%
15 PLC 1.9%
16 Submittals 1.6%
17 DOE 1.6%
18 Construction Schedule 1.5%
19 Value Management 1.5%
20 New Construction 1.5%
21 Corrective Action 1.4%
22 Cost Estimates 1.4%
23 Refinery 1.3%
24 RFI 1.3%
25 Breakdown Structure 1.2%
26 Master Schedule 1.2%
27 Monthly Cost Reports 1.2%
28 Bechtel 1.2%
29 Variance Analysis 1.1%
30 Management System 1.1%
31 Construction Management 1.1%
32 HMI 1.1%
33 Cost Analysis 1.1%
34 Schedule Performance 1.0%
35 Document Control 1.0%
36 Schedule Development 1.0%
37 Schedule Analysis 0.9%
38 Project Performance 0.9%
39 Capital Projects 0.9%
40 Schedule Updates 0.8%
41 Risk Analysis 0.7%
42 Autocad 0.7%
43 Value Analysis 0.7%
44 SPI 0.6%
45 EAC 0.6%
46 MW 0.6%
47 CPI 0.6%
48 Construction Activities 0.6%
49 Weekly Basis 0.6%
50 Cost Data 0.6%
{[{skill.rank}]} {[{skill.name}]} {[{skill.percentageDisplay}]}%
Show More

26,588 Project Controls Engineer Jobs

Where do you want to work?

To get started, tell us where you'd like to work.
Sorry, we can't find that. Please try a different city or state.