Top Quantity Surveyor Skills

Below we've compiled a list of the most important skills for a Quantity Surveyor. We ranked the top skills based on the percentage of Quantity Surveyor resumes they appeared on. For example, 13.6% of Quantity Surveyor resumes contained Sub-Contractors as a skill. Let's find out what skills a Quantity Surveyor actually needs in order to be successful in the workplace.

The six most common skills found on Quantity Surveyor resumes in 2020. Read below to see the full list.

1. Sub-Contractors

high Demand
Here's how Sub-Contractors is used in Quantity Surveyor jobs:
  • Evaluate Sub-Contractors billing for proper control of project budget
  • Preside meetings with Sub-contractors regarding project matters.
  • Request for quotations, make price comparison from the given quotations of the suppliers and sub-contractors, and then procure.
  • Send inquiries to different Suppliers and Sub-Contractors for price quotations, prepares price comparison for bid price consideration.
  • Document fillings, prepares client billings, sub-contractors accomplishments and billing reports, and security billings.
  • Worked on various projects liaising with the commercial manager, directors, contract managers and sub-contractors.
  • Served as the liaison between the Government (Client), Architect and the Sub-Contractors.
  • Assisted in procurement by sending bid invitations to the sub-contractors and reviewing proposals.
  • Prepared and finalize accounts with the clients and all sub-contractors and suppliers.
  • Prepare, send, follow-up inquiries to suppliers and Sub-Contractors.
  • Evaluate and Analyze Sub-contractors & Supplier Quotations and Billings.
  • Review and prepare payments of the Sub-Contractors and Suppliers.
  • Assisted in the settling of claims presented by sub-contractors.
  • Prepare Sub-contractors & Suppliers Price Quotation Comparison 7.
  • Complete Material Take-offs for HVAC services Establish sub-contractors packages Material enquires including, Preliminaries, Plant etc.
  • Project Cost AED 185 Million Materials Procurements Preparation Interim Billing Sub-Contractors Billings Cost Reconciliation Company Claims / Variations Cost Control

Show More

2. Contractual Claims

high Demand
Here's how Contractual Claims is used in Quantity Surveyor jobs:
  • Build up rates, Contractual claims & Day works

Show More

3. Final Account

high Demand
Here's how Final Account is used in Quantity Surveyor jobs:
  • Negotiated agreements/settlement of Final Accounts for Contractors, Sub-contractors and Suppliers.
  • Support the project quantity surveyor in all re-measurement, interim payments, variations, and final accounts.
  • Closed and issued all Subcontractors Final Accounts within a month after project completion.
  • Prepared final account reports and statement for completion of projects under my cognizance.
  • Assisted with the completion of final accounts for various projects.
  • Negotiated and agreed final account at close-out of project.
  • Recommended interim payment amounts & Final accounts Settlement etc.
  • Involved with projects from conception to final account agreement.
  • Prepared of project valuations and project final account.
  • Prepared interim and final accounts.
  • Lead Role in producing scheme final accounts for the client and ensuring sign off whilst minimising disallowed costs.
  • Carry out site valuation and preparation of claims, progress reports, variation orders and final accounts.

Show More

4. BOQ

high Demand
Here's how BOQ is used in Quantity Surveyor jobs:
  • Prepared monthly progress billings and update the Bill of Quantities (BOQ) based upon the full quantity take-off.
  • Prepared BOQ, cost estimates for materials, labor & equipment & information that the Project Management Team requires.
  • Check Estimate quantities (from HO) of all items of works to strictly control the Contract BOQ.
  • Prepare Diary and Bill of Quantity (BOQ), red lines for primary and secondary schematic plans.
  • Perform all tendering works / Quantity take off and issue BOQ to sub-con for price quotation.
  • Check BoQs for adequate specifications and prices as submitted by Engineering Team.
  • Prepare Final BOQ for various construction orders for claims purpose.
  • Work experiences, including, BOQ preparation, Drawing reviewing.
  • Prepared BOQ (for other companies and private residences)
  • Identify the variations for BOQ,.
  • Issue BOQ for Offshore Associated Gases (OAG Project)
  • Prepare tender BOQ, Tender document and pre-check tender documentation for approval.
  • Prepared take-off sheets and bills of quantities (BOQs) for proposed construction of international airport in Jebel Ali in UAE.

Show More

5. Payment Certificates

high Demand
Here's how Payment Certificates is used in Quantity Surveyor jobs:
  • Prepare application of Interim and Final Payment Certificates.
  • Prepare monthly interim payments and prepare payment certificates.
  • Verify and certify subcontract interim payment certificates.
  • Prepare payment certificates for subcontractors.
  • Review, check and approve subcontractor's invoices / interim payment certificates, final account and variation claims.
  • Produced takeoff sheets and issued Payment Certificates for Road Construction Projects.
  • Prepared payment certificates Prepared requisition letters for material required on site.
  • Evaluate, prepare and certify Interim and Final Payment Certificates of the Contractors, Nominated Sub-Contractors and Suppliers.
  • Prepared and priced bills of quantities * Prepared interim payment certificates and agreed final accounts.
  • Receive, sign and stamp Monthly Interim Payment Certificates as well as monthly internal valuation.

Show More

Job type you want
Full Time
Part Time
Internship
Temporary

6. Variation Orders

high Demand
Here's how Variation Orders is used in Quantity Surveyor jobs:
  • Measured and quantified variation orders.
  • Acquire quotations, source out suppliers, and prepares cost estimate for variation orders.
  • Involved in the process of agreement of variation orders and evaluation.
  • Deal with various contracts such as Variation Orders, Change Orders.
  • Maintain register of Variation Orders both issued and under consideration.
  • Review and process variation orders, schedules and claims.
  • Review and Preparation of Variation Orders.
  • Prepare Variation Orders and Claims.

Show More

7. Interim Valuations

high Demand
Here's how Interim Valuations is used in Quantity Surveyor jobs:
  • Review and advise interim valuations prepared by subordinates to be submitted to the client.
  • Key Duties & Responsibilities: * Preparation of Interim Valuations.

Show More

8. Cost Control

high Demand
Here's how Cost Control is used in Quantity Surveyor jobs:
  • Contribute to the assessment of the exposure value of pending and potential claims in conjunction with the Cost Control Group.
  • Lead and develop the site project controls team and oversight across the cost control activities for Hope Downs 4 site.
  • Tasked to achieve cost savings and identify deviations from project plan by managing all cost control/reporting systems and procedures.
  • Prepared Bills of quantities, budgetary and cost control estimates, and schedules for clients.
  • Identified and analyzed risk, value management, and cost control.
  • Monitored Cost Control of all piping works.
  • Prepared data for cost control, updatedcash flow and monitored the cost of on-going projects.
  • Project monitoring and evaluation Preparation of payment Certificate Cost Control Preparation of Procurement Plans and Quarterly Reviews WORK EXPERIENCE.

Show More

9. Contract Documents

high Demand
Here's how Contract Documents is used in Quantity Surveyor jobs:
  • Assisted associate partner in preparing expert witness testimony for construction litigation by analysis contract documents, correspondence, plans and specifications.
  • Prepared legal contract documents, created detailed progress reports about construction projects and inspected construction sites.
  • Prepared quantity take-off from contract documents and working drawings.
  • Reviewed contract documents for completeness.
  • Review contract documents and contract modifications to determine scope of work and reasonable cost allowance for scope changes.
  • Prepared tender and contract documents, including bills of quantities, change orders, and payment certification.
  • Prepared tender and contract documents, including bills of quantities with the architect and the client.
  • Developed the contract documents for third party services and managed the implementation of the contract provisions.
  • Prepared conceptual estimates, Bill of Quantities from schematic drawings through completion of Contract Documents stage.
  • Evaluate and/or review contractors bids, pay estimates and claims against the contract documents.
  • Prepare contract documents such as bill of quantity, instruction to tenderer and invitation.
  • Prepared technical evaluation of bids, comparative cost analyses, and sub contract documents.
  • Executed contract documents, including bills of quantities, with the client.
  • Initial contract documents for payment to contractors by the Accounting Department.
  • Prepared tender and contract documents, including bill of quantities.
  • Prepare Contract documents, valuation, Variations.
  • Prepared Tender and Contract documents.
  • Prepare contract documents and drawings.
  • Prepare Tender and Contract Documents per company's standards and international standard such as FIDIC, POMI, CESMM3 and SMM7.
  • Provide support to the Contract Manager in preparation of contract documents & estimating works.

Show More

10. Project Management

high Demand
Here's how Project Management is used in Quantity Surveyor jobs:
  • Provide forecasts for revenue and Project Management Leader.
  • General QS duties and project management duties.

Show More

11. Cost Estimates

high Demand
Here's how Cost Estimates is used in Quantity Surveyor jobs:
  • Produced mechanical cost estimates using drawings and contracted unit rates.
  • Performed accurate cost estimates based on blueprints and other documents for change order including preparation of drawings.
  • Derive rates for new items, if any and prepare cost estimates with supporting documents.
  • Prepare cost estimates for construction project.
  • Provided cost estimates for any variation of order for on going projects.
  • Provide Bill of Quantities and Cost Estimatesand scope of work.
  • Key Contributions: Prepared accurate cost estimates for 680nos.
  • Major Assignments: Prepare rough and final cost estimates for civil works of development projects as well as regular maintenance activities.

Show More

12. Quantity Take-Offs

high Demand
Here's how Quantity Take-Offs is used in Quantity Surveyor jobs:
  • Review materials on-site versus quantity take-offs.
  • Review analyze and approve bill of materials and scheduled quantity take-offs.

Show More

13. Cost Analysis

high Demand
Here's how Cost Analysis is used in Quantity Surveyor jobs:
  • Train or guide Junior Engineers on the field of Quantity Surveying like Estimating, Cost Derivation and Cost Analysis.2.
  • Review Bill of Quantities, Quantity take-off and actual site quantities as part of cost analysis and cost control.
  • Cost analysis for modification of villas as per client requirement.
  • Organized cost analysis for repair and maintenance project work.
  • Performed cost analysis and draw up reports on changes to works and subcontractors claims.
  • Reason of leaving: Migrated to United States of America) Job Responsibilities Cost Analysis.

Show More

14. Shop Drawings

average Demand
Here's how Shop Drawings is used in Quantity Surveyor jobs:
  • Introduced a logging system for tracking shop drawings, contract documents, and material delivery for projects 1
  • Check shop drawings, plans for construction and estimate quantities.
  • Coordinated shop drawings and material sample submission.
  • Worked as CAD operator for preparation of shop drawings, mainly for horizontal construction (i.e.
  • produced complete construction documents, shop drawings.

Show More

15. Infrastructure

average Demand
Here's how Infrastructure is used in Quantity Surveyor jobs:
  • Prepare revised Estimates including Bill of Quantities for construction/civil works/developmental infrastructure & services/landscaping works.
  • Project PV Tower and associated roads and infrastructure works (IRS 400 Millions)
  • Project R 361/2 - Baniyas Road ( Underpass and infrastructure works) (AED 150 Millions).
  • Read and interpret specifications and technical drawings, schedules, manuals for construction projects, installations and upgrade repair of infrastructure.
  • Assist in the preparation of cost estimates for infrastructure projects and maintenance programs.

Show More

16. UAE

average Demand
Here's how UAE is used in Quantity Surveyor jobs:
  • Based: UK, UAE, Trinidad

Show More

17. Tender Documents

average Demand
Here's how Tender Documents is used in Quantity Surveyor jobs:
  • Prepare and compile tender documents for suppliers/subcontractors.
  • Checked and assessed tender documents for errors and made reports on findings.
  • Prepare and compile tender documents to suppliers and sub-contractors.
  • Prepare various post tender documents prior to bidding.
  • Prepare, compile and finalize tender documents.
  • Prepare tender documents and inquiries to Nominated Contractors and review/evaluate their quotations/bids.
  • Prepare Bill of Quantities (BOQ) and Pre & Post Tender Documents, Daily, Weekly and Monthly Progress Report.
  • Prepare and compile Tender Documents including quantity take-off using AutoCAD, Microsoft Excel, Microsoft Word and Adobe Acrobat Professional.
  • Revise and analyze tender documents and arithmetic checks.

Show More

18. Pre-Contract

average Demand
Here's how Pre-Contract is used in Quantity Surveyor jobs:
  • Collaborated with other departments in conducting research for improving company's overall pre-contract and post-contract administration process
  • Project Position: Quantity Surveyor/ Project Coordinator Pre-Contract Estimate indicative construction budget from preliminary concept design.
  • Assist in the preparation of tenders for new contracts including pre-contract measurements and pricing.

Show More

19. Saudi Arabia

average Demand
Here's how Saudi Arabia is used in Quantity Surveyor jobs:
  • Box 1449, Riyadh 11431, Kingdom of Saudi Arabia / Contact no.
  • Box 2173, Dammam 31451, Kingdom of Saudi Arabia/ Contact no.

Show More

20. QS

average Demand
Here's how QS is used in Quantity Surveyor jobs:
  • Maintain the correspondences for contractual delay events and inform to the Sr.QS for prepare the Claim & Extension of Time.
  • Develop, maintain and supervise all cash flow forecasts and budget fluctuations for advanced notification to Managing Director/Project QS.
  • Integrated Management System s (IMS) QS Representative on Company s ISO 9001:2008 implementation.
  • Progress claims evaluation, preparation, submission to QS and Client.
  • Registered as a Graduate Quantity Surveyor with Registration Number GQS.7.57.03/11.
  • Supervised other QS and Assistant QS.
  • Team Work Management with Local QSs and other staffs and report to the Commercial Manager and Commercial Director etc.
  • Carry out the following duties and obligations in consultation with the Senior Quantity Surveyor (SQS).

Show More

21. Autocad

average Demand
Here's how Autocad is used in Quantity Surveyor jobs:
  • Followed and maintained the drawing set using AutoCAD and released them to supervisors for assigned tasks.
  • Concrete volume of expansion Pier Cap & Segment from drawing soft copy inAutoCAD 2010.
  • Work Responsibilities: Preparation of MEP AUTOCAD Drawings Preparation of Duct work & Chilled water Drawings.
  • Work Responsibilities: Preparation of MEP AUTOCAD Drawings Preparation of Drainage, Water & Gas Drawings.
  • Utilized AutoCAD, Civil 3D, and Carlson Survey to create detailed survey reports with photos; documenting any damage.
  • Assisted in the development of survey maps and survey plats using Computer Aided Drafting (AutoCAD) software.

Show More

22. Dubai

average Demand
Here's how Dubai is used in Quantity Surveyor jobs:
  • Brief scope- Quantity surveyor / Cost engineer for the fabrication / erection of aluminum smelter / pot shells in Dubai.
  • Water Transmission Pipeline), Dubai, UAE.
  • Company - UAE, Dubai Sport CityMaterial & QS Eng.
  • Project Planning Pre/Post Tender Negotiation Tender Quarries/ Floating TendersMajor Projects:Burg Khalifa World Tallest BuildingEmaar Group Dubai ProjectProject Cost AED.

Show More

23. Cost Planning

average Demand
Here's how Cost Planning is used in Quantity Surveyor jobs:
  • Prepared approximate quantities for cost estimating and cost planning.

Show More

24. Feasibility Studies

average Demand
Here's how Feasibility Studies is used in Quantity Surveyor jobs:
  • Carry out feasibility studies to estimate materials, time and labor costs
  • Conducted feasibility studies using historical databases during pre-development cost studies.
  • Assisted in establishing a client's requirements and undertake feasibility studies.
  • Carry out feasibility studies, Cost planning, Cost checking/alternative specification/detail, Budget reviews, Pre-tender cost checks.

Show More

25. Payment Application

average Demand
Here's how Payment Application is used in Quantity Surveyor jobs:
  • Prepared interim payment applications; measurement of completed works, valuation of Variations; negotiation and agreement of the Final Account.
  • Prepared monthly valuation of quantities for payment application as well as weekly quantities for project reporting.
  • Prepare and submit Payment Application Statements and claims for contract variations to the Client.
  • Reviewed, measured, checked and verified contractor's payment applications.
  • Manage the processing of contractor payment applications.
  • Key Roles and Responsibilities: Submit monthly payment applications, expedite issue of payment certificate, monitor payments and chase cash.

Show More

26. New Construction

average Demand
Here's how New Construction is used in Quantity Surveyor jobs:
  • related to new construction and renovation projects within the healthcare and institutional marketplaces.
  • Helped superintendents and contractors with grade stakes at existing sites for grades to cut for future development of new construction.
  • Call Commercial Real Estate clients throughout the United States to statistically survey new construction projects in their various stages of development.
  • Worked in the field as an Instrument Person doing column and other layout needed for the new construction of commercial buildings
  • Survey and inspect public access facilities for LAUSD Facilities Access Compliance Unit's New Construction - 83 Access Compliance Project.
  • Staked out new construction sites and shot topography for builders and engineers.

Show More

27. Civil Works

low Demand
Here's how Civil Works is used in Quantity Surveyor jobs:
  • Bill of Quantities preparation of Structural and Civil works for a 5-Star hotel in Ghana, Africa.
  • Project Cost: DH1.5M; Scope: Fit Out works and MEP Works + Civil Works
  • Prepare Cost Estimate of a given Area for Civil works, Earthworks.

Show More

28. PVT

low Demand
Here's how PVT is used in Quantity Surveyor jobs:
  • Worked as Assistant Quantity Surveyor at Hyatt Regency Colombo Hotel project with Maga Engineering (Pvt) Ltd.
  • Company: FUSION INDIA PROJECT MANAGEMENT PVT LTD. (Earlier Known as Abaqus Properties consulting Pvt Ltd )
  • Worked as project Quantity Surveyor of Jaffna - Pannai - Kayts road development project in Maga Engineering (Pvt) Ltd.
  • INTERN PROJECT COMPLETED * Industrial Training on "ANALYSIS AND DESIGN OF A MULTISTORIED RESIDENTIAL BUILDING", Geo Structurals Pvt.

Show More

29. ABU Dhabi

low Demand
Here's how ABU Dhabi is used in Quantity Surveyor jobs:
  • Assign to the Abu Dhabi Water Treatment Facilities and the Energy Center for the International Airport.
  • Project - Telephone Network for the Emirate of Abu Dhabi (AED 35 Millions)

Show More

30. Project Value

low Demand
Here's how Project Value is used in Quantity Surveyor jobs:
  • Project Value: AED 900 Million Responsibilities:.
  • Project Value: Bangladesh Tk.
  • Project value US$ CAPABILITY TO HANDLE 12.29 Million.

Show More

31. Qatar

low Demand
Here's how Qatar is used in Quantity Surveyor jobs:
  • Project: Msheireb Down Town Project (Phase 3), Doha, Qatar.

Show More

32. MEP

low Demand
Here's how MEP is used in Quantity Surveyor jobs:
  • Project Cost: DH2.2M, Scope: Interior Fit-out Works, Landscaped and MEP + CivilWorks

Show More

33. Site Meetings

low Demand
Here's how Site Meetings is used in Quantity Surveyor jobs:
  • Reported on behalf of contract manager the progress of the particular project to the consultants at the site meetings.
  • Attend site meetings and site show round.
  • Attended monthly site meetings where required.

Show More

34. IPC

low Demand
Here's how IPC is used in Quantity Surveyor jobs:
  • Attend weekly and monthly meeting with contractors and management Identify changes from IPC& IFC and Tender drawings
  • Review and preparing for Monthly interim payment certificate and Co-ordination with Contractor /Client related Ipc's.
  • 1-Worked on IPC, S. 2-Monthly Progress Report.

Show More

35. Rate Analysis

low Demand
Here's how Rate Analysis is used in Quantity Surveyor jobs:
  • Perform duties to rate analysis, project budget control, reviewing projects specification and contracts.
  • Rate Analysis requirements for estimates, Variations & Claims.
  • Rate analysis for Tendering purpose.
  • Conducted rate analysis for items purchased Prepare quantity take-off for budget preparation
  • Prepare material statement and rate analysis for civil works of development projects and repair maintenance works.

Show More

36. USD

low Demand
Here's how USD is used in Quantity Surveyor jobs:
  • Project Value: USD 50 Million (Funded by International Development Agency-the World Bank).
  • Project: Gan Airport Development-Maldives- 19.5 Millions USD.
  • Position : : Quantity Surveyor PROJECT VALUE : [ ] USD$ CONTRACTOR : Amec Spie CAPAG SERVICE DESCRIPTION 1.

Show More

37. Additional Works

low Demand
Here's how Additional Works is used in Quantity Surveyor jobs:
  • Prepare Site Instructions as instructed and coordinates to Subcontractors for any changes, and/or additional works which require by the construction.
  • Estimate and prepare quantities for variations order, price adjust- ment and additional works.

Show More

38. Lagos

low Demand
Here's how Lagos is used in Quantity Surveyor jobs:
  • LagosManaged and controlled all company Quantity Surveying activities.
  • Project: construction of factory Nigeria Breweries Plc Eric Moore Iganmu Lagos.
  • Plot 10, Block B, Ilasamaja Industrial Estate, Itire Jn Oshodi-Apapa Expressway, Lagos.

Show More

39. Unit Rates

low Demand
Here's how Unit Rates is used in Quantity Surveyor jobs:
  • Prepare Tender Clarifications to Consultant as to the considerations applied and used in the bid unit rates.
  • Make sure all the claim are part of their contract and strictly follow all contractual unit rates.
  • change orders based on existing project unit rates, day rates or star rates amounting to $54M.

Show More

40. Value Management

low Demand
Here's how Value Management is used in Quantity Surveyor jobs:
  • Value engineering / value management.

Show More

41. UK

low Demand
Here's how UK is used in Quantity Surveyor jobs:
  • Worked for Projects in UK & Ireland.
  • Project Completed: Rajapruk Sport Club (North Park) Bangkok Golf Courses Project @ Vibhavadi-Rangsit Rd, Bangkok.

Show More

42. Construction Materials

low Demand
Here's how Construction Materials is used in Quantity Surveyor jobs:
  • Prepare requisitions for ordering construction materials, maintenance projects, equipment, spare-parts, materials and building supplies.
  • Planned and coordinated the delivery of construction materials on the site based on the demand from the client.

Show More

43. RFI

low Demand
Here's how RFI is used in Quantity Surveyor jobs:
  • Maintain records of all contractor invoices (payments) and RFI's.
  • Request For Inspection (RFI).
  • Monitor job submittal and RFI logs to ensure current information is being used by all resources.
  • Assisted the project engineer in preparing the RFIs and change orders.

Show More

44. Monthly Reports

low Demand
Here's how Monthly Reports is used in Quantity Surveyor jobs:
  • Write monthly reports with achievements, challenges and outlook.
  • Prepare monthly reports comparing actual cost versus estimated cost iv.

Show More

20 Most Common Skill for a Quantity Surveyor

Sub-Contractors17.9%
Contractual Claims15.5%
Final Account8.6%
BOQ6.4%
Payment Certificates5.3%
Variation Orders4.7%
Interim Valuations4.7%
Cost Control4.5%

Typical Skill-Sets Required For A Quantity Surveyor

RankSkillPercentage of ResumesPercentage
1
1
Sub-Contractors
Sub-Contractors
13.6%
13.6%
2
2
Contractual Claims
Contractual Claims
11.8%
11.8%
3
3
Final Account
Final Account
6.5%
6.5%
4
4
BOQ
BOQ
4.8%
4.8%
5
5
Payment Certificates
Payment Certificates
4.1%
4.1%
6
6
Variation Orders
Variation Orders
3.5%
3.5%
7
7
Interim Valuations
Interim Valuations
3.5%
3.5%
8
8
Cost Control
Cost Control
3.4%
3.4%
9
9
Contract Documents
Contract Documents
3.2%
3.2%
10
10
Project Management
Project Management
2.5%
2.5%
11
11
Cost Estimates
Cost Estimates
2.2%
2.2%
12
12
Quantity Take-Offs
Quantity Take-Offs
2.1%
2.1%
13
13
Cost Analysis
Cost Analysis
2.1%
2.1%
14
14
Shop Drawings
Shop Drawings
2%
2%
15
15
Infrastructure
Infrastructure
2%
2%
16
16
UAE
UAE
1.9%
1.9%
17
17
Tender Documents
Tender Documents
1.8%
1.8%
18
18
Pre-Contract
Pre-Contract
1.8%
1.8%
19
19
Saudi Arabia
Saudi Arabia
1.7%
1.7%
20
20
QS
QS
1.7%
1.7%
21
21
Autocad
Autocad
1.6%
1.6%
22
22
Dubai
Dubai
1.5%
1.5%
23
23
Cost Planning
Cost Planning
1.5%
1.5%
24
24
Feasibility Studies
Feasibility Studies
1.3%
1.3%
25
25
Payment Application
Payment Application
1.3%
1.3%
26
26
New Construction
New Construction
1.2%
1.2%
27
27
Civil Works
Civil Works
1.1%
1.1%
28
28
PVT
PVT
1.1%
1.1%
29
29
ABU Dhabi
ABU Dhabi
1.1%
1.1%
30
30
Project Value
Project Value
1.1%
1.1%
31
31
Qatar
Qatar
1%
1%
32
32
MEP
MEP
1%
1%
33
33
Site Meetings
Site Meetings
1%
1%
34
34
IPC
IPC
1%
1%
35
35
Rate Analysis
Rate Analysis
0.9%
0.9%
36
36
USD
USD
0.9%
0.9%
37
37
Additional Works
Additional Works
0.8%
0.8%
38
38
Lagos
Lagos
0.8%
0.8%
39
39
Unit Rates
Unit Rates
0.7%
0.7%
40
40
Value Management
Value Management
0.7%
0.7%
41
41
UK
UK
0.6%
0.6%
42
42
Construction Materials
Construction Materials
0.6%
0.6%
43
43
RFI
RFI
0.6%
0.6%
44
44
Monthly Reports
Monthly Reports
0.6%
0.6%

481 Quantity Surveyor Jobs

Where do you want to work?