1. Supply Chain
A supply chain is a network or a sequence by which finished products of a company are distributed to retailers and then supplied to the end-users. The distribution of products and services from the production line to the final buyers is carried out in a series of steps including; manufacturing, transportation, and their distribution. The whole supply chain consists of different entities including; manufacturers, transportation, warehouses, suppliers, and retailers. The entities ensure that the products retain their originality while also minimizing the cost of delivery.
- Identified and implemented system and process enhancements within the supply chain to contribute to overall business process improvement.
- Provide knowledgeable recommendations for materials supply chain regarding engineering changes and provides systematic reduction of risk.
2. Materials Management
Materials management refers to the process of monitoring and controlling the inventory and use of materials, often within a manufacturing plant. This management may also require shipping and delivery of the materials depending on the material product, price, and customer demand.
- Served as leader for materials management on global enhancement team that selected, configured, and implemented SAP R/3 ERP system.
- Recognized as key team member for successful launch and maintenance of SAP for Materials Management to ensure system accuracy.
3. MRP
MRP is an abbreviation of Material Requirements Planning and refers to the control system which is implemented in the planning and management of the activities related to manufacturing. Through MRP, manufacturers can easily schedule the production and it can also be used for inventory. MRP systems are mostly software-based but the process can also be carried out manually.
- Reviewed MRP for historical and forecast demand verses availability on a regular basis.
- Generated make/buy analysis and implemented any required changes in MRP tool.
4. Material Planning
Material Planning refers to the act of planning what materials may be needed for a particular project or for consumers. This is a form of inventory management so that consumers and developers are able to have access to the raw materials needed for a project or store inventory.
- Participate in the identification and implementation of material planning strategies.
- Co-authored several Shipyard Standard Procedures defining special consideration reporting, advanced procurement, and material planning methods employed by Electric Boat.
5. Sigma
In Greek alphabets, sigma is the 18th letter that means "to sum up". In statistics, the lower case symbol of sigma is the unit of measurement for standard deviation which is used to assess the variability in a given set of data. While the upper case symbol is for summation notation means to add up all the given numbers in the data set.
- Utilized Six Sigma methodology; developed metrics to improve performance, quality, eliminate non-productive activities, increasing Customer satisfaction.
- Participated in Six Sigma excess and obsolete inventory project to minimize excess and obsolete inventory purchased by the suppliers.
6. Inventory Control
- Coordinated interdepartmental activity with quality assurance, manufacturing, purchasing, engineering, inventory control and productions.
- Collaborate in the implementation of proper inventory control procedures and processes to ensure materials accuracy.
Choose from 10+ customizable senior materials analyst resume templates
Build a professional senior materials analyst resume in minutes. Our AI resume writing assistant will guide you through every step of the process, and you can choose from 10+ resume templates to create your senior materials analyst resume.7. ERP
Enterprise Resource Planning (ERP) is computer software used by major corporations and organizations for conducting their management and accounting tasks efficiently. ERP systems bind different business processes with each other allowing smoother flow of data between them resulting in swift project assessment and completion.
- Manage and facilitate import/export of data from ERP system to Microsoft Excel databases that maintain traceability throughout all storage locations.
- Planned, Scheduled and monitored production orders in Visual Manufacturing based on current backlog and determined materials requirements from ERP module.
8. Logistics
Logistics is a complete organization and implementation of a problem. Logistics are often considered in a complex business operation, as some works need detailed plannings. Logistics are also used in military action.
- Assist and developing logistics doctrine for a professional education program for Logistics Officers.
- Developed a spreadsheet which became the standard calculation for processing quarterly buybacks for the Defense Logistics Agency (DLA) contract.
9. Production Planning
Production planning is the planning of manufacturing in an industry or company. It uses resources like materials, employees, and production capacity, to serve customers. Production planning can be used in combination with production control into production and control planning.
- Major responsibility is master scheduling and related production planning tasks.
- Direct supervisor for the production planning and purchasing group with four direct reports.
10. ECO
- Collaborated with engineering for ECO implementation utilizing inventory with minimal impact on operation.
- Attended weekly ECO meetings so that as parts were changed, vendors could be updated as well as purchasing records.
11. Delivery Performance
- Measured and submitted delivery performance reports to upper management.
- Leveraged mill suppliers to benefit program in cost savings, delivery performance, quality and shortened lead-time.
12. Part Numbers
Part Numbers are special sets and strings of numbers used to identify and label parts. There is no one specific kind or set of parts for which this is used and the term can be found in various industries and used for various parts. Most often, a part number is only used to refer to one part and product within one company or organization. Part numbers, also, tend to inadvertently describe the item's purposes and physical features, too, through an organized code of sorts.
- Coordinated all procurement activity for phase-one work transfer of major sub-assembly work of approximately 500 part numbers.
- Maintained new parts to insure correct costs, lead-times, buyer ID, vendor and vendor part numbers.
13. Lean Manufacturing
- Achieved best in division results for lowering inventory levels and increasing inventory turns utilizing lean manufacturing practices.
- Completed various specialized training in conjunction with position including LEAN Manufacturing and ISO-9001.
14. Inventory Management
- Group manager responsible for auditing inventory management processes and implementing identified improvements.
- Performed ABC inventory analysis and developed cycle count and inventory management strategy.
15. On-Time Delivery
On-Time Delivery, or OTD, is a metric that measures the rate at which finished goods and deliveries are completed on time. This rate is measured by the overall number of units shipped within a specified time frame agreed upon by the consumer and supplier. On-Time Delivery allows suppliers' compliance with delivery deadlines, and hence their consistency, to be assessed using a continuous and collaborative development approach.
- Attend daily conference calls with suppliers to ensure on-time delivery also to communicate promise and completion dates of PW modules.
- Boosted on-time delivery (OTD) 50% through contributions to project process improvement.
5 Senior Materials Analyst resume examples
Build a professional senior materials analyst resume in minutes. Browse through our resume examples to identify the best way to word your resume. Then choose from 5+ resume templates to create your senior materials analyst resume.
What skills help Senior Materials Analysts find jobs?
Tell us what job you are looking for, we’ll show you what skills employers want.
What technical skills for a senior materials analyst stand out to employers?
Jason Hewitt Ph.D.
Lecturer, Pennsylvania State University - Behrend, Erie PA
List of senior materials analyst skills to add to your resume

The most important skills for a senior materials analyst resume and required skills for a senior materials analyst to have include:
- Supply Chain
- Materials Management
- MRP
- Material Planning
- Sigma
- Inventory Control
- ERP
- Logistics
- Production Planning
- ECO
- Delivery Performance
- Part Numbers
- Lean Manufacturing
- Inventory Management
- On-Time Delivery
- Production Schedules
- Customer Orders
- BOM
- MPS
- Product Line
- Cost Analysis
- Engineering Changes
- Business Process
- Expedite
- Cost Reduction
- Supplier Performance
- KPI
- Production Control
- SOX
- Kanban
- Master Scheduling
- Quality Issues
- Process Improvement
- OTD
- Material Availability
- Continuous Improvement
- Production Process
- NPI
- Cost Savings
- Premium Freight
- JIT
- Data Analysis
- WIP
- Cycle Counts
- ISO
- Material Issues
- MRO
- Value Stream
- Schedule Changes
- Order Placement