FIND PERSONALIZED JOBS
Sign up to Zippia and discover your career options with your personalized career search.
Sorry, we can't find that. Please try a different city or state.
APPLY NOW
Apply Now
×
FIND
PERSONALIZED JOBS

Sorry, we can't find that. Please try a different city or state.

CONTENT HAS
BEEN UNLOCKED
Close this window to view unlocked content
or
find interesting jobs in

Log In

Log In to Save

Sign Up to Save

Sign Up to Dismiss

Sign Up

SIGN UP TO UNLOCK CONTENT

or

The email and password you specified are invalid. Please, try again.

Email and password are mandatory

Forgot Password?

Don't have an account? Sign Up

reset password

Enter your email address and we will send you a link to reset your password.

Back to Log In

Log In

Log In to Save

Sign Up to Save

Sign Up to Dismiss

Sign up to save the job and get personalized job recommendations.

Sign up to dismiss the job and get personalized job recommendations.

or

The email and password you specified are invalid. Please, try again.

Email and password are mandatory

Already have an account? Log in

reset password

Enter your email address and we will send you a link to reset your password.

Back to Log In

Company Saved

Answer a few questions and view jobs at that match your preferences.

Where do you want to work?

Job Saved

See your Saved Jobs now

or

find more interesting jobs in

Job Dismissed

Find better matching jobs in

Your search has been saved!

Top 50 Survey Party Chief Skills

Below we've compiled a list of the most important skills for a Survey Party Chief. We ranked the top skills based on the percentage of Survey Party Chief resumes they appeared on. For example, 26.0% of Survey Party Chief resumes contained Topographic Surveys as a skill. Let's find out what skills a Survey Party Chief actually needs in order to be successful in the workplace.

These Are The Most Important Skills For A Survey Party Chief

1. Topographic Surveys
demand arrow
high Demand
Here's how Topographic Surveys is used in Survey Party Chief jobs:
  • Established aerial control for numerous topographic surveys.
  • Collect elevation information for topographic surveys.
  • Performed boundary and topographic surveys.
  • Preformed ALTA, Boundary and Topographic surveys as well as extensive construction layout as a one man robotic survey crew.
  • Field responsibilities include: topographic surveys, property line traverse, construction and road stake out and as-built surveys.
  • Responded to written and telephone requests for grading layout for bridges, roadways, pipelines, and topographic surveys.
  • Performed Boundary Surveys, Topographic Surveys, Field Locations, House Stakeouts, and Construction Stakeout.
  • Supervised construction layout, using right-of-way, boundary, utility and topographic surveys for design.
  • Analyze, interpret data, and prepared construction layout, boundary and topographic surveys.
  • Performed boundary, ALTA and topographic surveys using conventional and GPS survey equipment.
  • Perform Boundary and Topographic Surveys, Wetland Surveys and Construction stake-out in field.
  • Field Surveyor on topographic surveys, boundary surveys, and construction staking etc.
  • Performed field surveys including control surveys, construction staking, and topographic surveys.
  • Design & Build Housing projects, construction stake-out and topographic surveys.
  • Land, property, construction, and topographic surveys.
  • Research recorded deeds, maps, and other documents as needed for boundary, construction, and topographic surveys.
  • Conduct topographic surveys of existing ground for design purposes using a Trimble 5800 GPS.
  • Used Leica robot for some topographic surveys.
  • Carried out AutoCad drafting assignments: topographic surveys, ilcs, drainage certs, utility exhibits, and condominium plats.
  • Used Trimble GPS and Nikon instruments, Trimble Collectors, Microstation * Field work on boundary and topographic surveys.

Show More

2. Property Boundaries
demand arrow
high Demand
Here's how Property Boundaries is used in Survey Party Chief jobs:
  • Involved in accurately measuring and calculating points of reference to establish property boundaries.
  • Researched legal records and documents to determine exact property boundaries.
  • Measured precisely to set property boundaries.
  • Researched property boundaries and zoning in order to utilize a site to its fullest potential.
  • Interpret maps and specifications to establish property boundaries, easements and right of ways.
  • Cleared survey lines, set and ran traverse, and recovered property boundaries.
  • Locate property boundaries; calculate distances, record data and measurements as required.
  • Search survey records and land titles to obtain information about property boundaries.
  • Researched and collected all data pertaining to property boundaries.
  • Field calculation to establish lot and property boundaries.

Show More

3. GPS
demand arrow
high Demand
Here's how GPS is used in Survey Party Chief jobs:
  • Utilized GPS technology to manage a two man robotic crew assigned to residential/ commercial development projects.
  • Corresponded with engineering on military bases utilizing GPS and robotic inst.
  • Carried out 2 man and 1 man robotic, GPS and conventional survey field work.
  • Use robotic total-station and GPS equipment to provide stakeout to site-work and foundation contractors.
  • Inspect well pad construction and perform compaction testing and gathering GPS as built information.
  • Experienced in conventional and satellite surveying systems (GPS).
  • Designed and built mounting brackets for our GPS mounted vehicles.
  • Inspect GPS mm system for calibration errors.
  • Field work for large GPS control networks
  • Verified GPS accuracy and exact pipeline location using incorporated .KMZ files.
  • Field work - boundary survey, topographic survey, ALTA/ACSM Land Title Survey, Leveling, GPS and construction survey.
  • Perform topographical, boundary, title, construction, & GPS surveys surpervised three man crew
  • Maintain and operate Trimble III Data GPS Systems worth over $100K.
  • Fort Detrick MD for National Cancer Reach Center utilizing GPS.
  • Utilized Trimble GPS Systems with Pacific Crest data transmission.
  • Gained experience with Trimble GPS (Pathfinder, 5700, and 4400) systems.
  • Carried out tree topo's of large orange tree orchards with GPS.
  • Diagnosed GPS wire problems and developed field procedures for onsite wire repair.
  • Performed commercial survey work with Trimble GPS and Trimble(Geodimeter) conventional equipment.
  • KEY QUALIFICATIONS GPS survey operations conventional survey topographic survey extremely well at learning unfamiliar equipment Post processing on Trimble Business Center.

Show More

36 GPS Jobs

No jobs at selected location

4. Construction Layout
demand arrow
high Demand
Here's how Construction Layout is used in Survey Party Chief jobs:
  • Managed a four-person survey crew handling boundary surveys, subdivision layout, construction layout, oil well locations & pipeline surveys.
  • Managed survey and construction layout projects and worked together with project managers in other departments to fulfill their survey needs.
  • Manage projects with all types of surveys including boundary, topographic, construction layouts and as built.
  • Read and interpret plans & specifications for civil and structural projects for construction layout.
  • Prepared construction layout for Levees, Pump Stations, T-walls, and Canals.
  • Staked right of way lines and base lines as well as construction layout.
  • Assist in all phases of construction layout for commercial and residential development.
  • Assured quality control of all complete construction layout on construction site.
  • Championed the construction layout and design of for residential/ commercial developments.
  • Coached field crews in practice and procedure of construction layout.
  • Perform Construction Layout Services for roadway and utility construction.
  • Performed construction layout from coordinated points.
  • Preformed Topographic, boundary surveys, as builts, and construction layout as a Transit Man and as a Crew Chief.
  • Oversee operation of land survey field crew performing boundary retracement, topographical survey, construction layout, and ALTA/as-built surveys.
  • Survey Crew chief (1994 - 1998)Surveying and drafting Surveying: Performed property surveys and construction layout.
  • Managed construction layout projects: CAD drafting, data reduction, office calculations and client contact.
  • Involved in topographic surveys Staked construction layout for subdivision & commercial projects Drafted site plans and surveys on AutoCad
  • Acquired the knowledge and experience needed for projects involving Boundary, Topo, As-builts and Construction Layout.
  • Performed property surveys, construction layout, ALTA surveys, topos, as-builts and boundary surveys.
  • Survey work included property surveys, ALTA surveys, topos, as- builts, construction layout.

Show More

1 Construction Layout Jobs

No jobs at selected location

5. Total Station
demand arrow
high Demand
Here's how Total Station is used in Survey Party Chief jobs:
  • Operated electronic total station instrument, level and other surveying instruments.
  • Party Chief or Chain-person providing survey support on multiple engineering projects using GPS or Total Station equipment.
  • Worked with total stations and the latest GPS equipment on a daily basis.
  • Inspect total stations, theodolites, auto levels daily for calibration errors.
  • Operated transits, Wild 2 theodolites, levels and total stations.
  • Surveyed sewer projects with total station and electronic field book.
  • Used TDS Recon, Total Station and GPS equipment.
  • Operated GPS, Total stations, and levels.
  • Total station operation on seismic and oilfield surveys.
  • Worked with Total station and GPS.
  • Used Total Station, Robotic, TDS Ranger, VRS, and GPS equipment.
  • NOTE: I Can Use Latest Total Stations, Digital Levels, Normal Theodolite, and normal levels Machines.
  • Check horizontal and vertical collimation on theodolite total station as well as check traverse targets to ensure data accuracy.
  • Used a Geodimeter total station to establish final quantities on earthwork used in the building of Hwy.
  • Well versed in use of total stations including servo driven robotic instruments to alidades and plane tables.
  • Used a Leica robotic total station in order to establish high accuracy horizontal control on mapping projects.
  • Used Leica total station w/SMI Construction 5 surveying software & HP 48GX Data Collector.
  • Field work performed with Trimble total stations and GPS equipment.
  • Set and monitored control using Trimble's 5800 GPS, S6 total stations and TDS Rangers running Survey Controller.
  • Total Station and Regular Total Station with Recon Allegro Juniper Systems, & Trimble Using G.P.S.

Show More

Job type you want
Full Time
Part Time
Internship
Temporary
6. Data Collection
demand arrow
high Demand
Here's how Data Collection is used in Survey Party Chief jobs:
  • Specialized in precise measurements, calculations and data collection for construction layout projects.
  • Talented in technical troubleshooting with computer software and data collection hardware.
  • Detailed construction staking, topographical data collection and building/house stakes.
  • Perform data collection analysis from measurements gathered by field crews.
  • Performed field work and data collection for boundary, mapping, alignments, parceling, and title surveys, including drafting.
  • Survey party chief and project manager responsible for field data collection and construction stake-out for major transportation and land development projects.
  • Utilize GPS RTK (with OTF capability) and conventional total station data collection techniques for real-time positional data output.
  • Researched and designed new methods of data collection to enhance the quality of the project scope.
  • Implemented new field procedures and data collection techniques to improve production and data quality.
  • Use of optical level in grading and data collection for FEMA elevation certificates.
  • Up and download Data Collectors for on-board Wild Total Station Data Collection.
  • Implemented changeover to cad and electronic data collection to include P.C.
  • Performed data collection for accurate and complete final as-built drawings.
  • Recorded, processed and implemented data collection of proper asset GPS locations into an enterprise relational geodatabase.
  • Utilized diverse data collection devices All general responsibilities
  • Create and manipulate alignments, data collection files, and DTMs of both existing topographic data and proposed highway improvements.
  • Used Trimble GPS,Robotic Total Stations,SMI,and TDS data collection software.

Show More

318 Data Collection Jobs

No jobs at selected location

7. Topcon
demand arrow
high Demand
Here's how Topcon is used in Survey Party Chief jobs:
  • Operate SOKKIA and TOPCON total workstations, using SMI, TDS, and Allegra software.
  • Utilized the Topcon (3-way laser) to layout accurate survey grid with elevations.
  • Set up and operate a: Topcon 802A series Robotic Station and Data Collector.
  • Used Topcon Total Stations, HP 48 and TDS Pocket PC Data Collectors.
  • Experience includes running high precision level runs using a Topcon optical micrometer.
  • Use Topcon GPS in performance of layout and construction staking surveys.
  • Used Topcon GPS and Total Station with TopSurv software.
  • Utilized Nikon and Topcon Total Station equipment.
  • Use of Topcon QS series robotic instrument.
  • Utilize Carlson Software to build three dimensional models for Machine Control Calibrate sites using Topcon GPS.
  • Used TDS Recon with Survey Pro and Topcon total station and Topcon electronic level.
  • Maintain Topcon GPS and Robotic machine control on Motor Graders, Dozers and Excavators.
  • Operated Trimble GPS and Topcon robotic survey equipment.
  • Used Topcon and Leica GPS for wetland surveys.
  • Use of Leica and Topcon total stations/GPS.
  • Use of Trimble & Topcon G.P.S.
  • Used an SDR 33 data collector with Topcon, Wilds 1010, Geodimeter 500 and Sokkia TCR300 instruments.
  • Project was 440M UPRR Strauss/Lordsburg complex in Santa Teresa, NM using Topcon GR3 gps equipment.
  • Used HP 48 with SMI software, Topcon total sta., and Topcon electronic level.
  • Used Sokkia SDR 33 collector with Topcon total sta.

Show More

8. CAD
demand arrow
high Demand
Here's how CAD is used in Survey Party Chief jobs:
  • Create technical drawings based on given specifications and calculations with AutoCad or Carlson drawing software.
  • Converted, edited, inserted and extracted raw data and coordinate data in AutoCAD Land Desktop drawings.
  • Scan in record utility documents, import into Cad project and sketch in for plat preparation.
  • Detailed installation inventories, photographs, sketches, and CAD Drawings, coordination of field data
  • Calculated points for locating and/or staking using either AutoCAD Land Desktop or project plans.
  • Tutor instrument men in mathematics, AutoCAD, surveying and computer programs.
  • Prepared maps for review in AutoCAD and MicroStation.
  • Create AutoCAD drawings for designers and engineers.
  • Performed 3D CAD drafting and modeling.
  • Use of Auto Cad to do as-builts for our company standard operating procedure for our clients.
  • Downloaded/uploaded raw data from an SDR 33 data collector using PROLink and AutoCAD Land Desktop.
  • Prepared survey maps on aforementioned types of land surveys using LDD CAD software.
  • Worked with AutoCAD, Trimble Geodetic Office and Microsoft Office software daily.
  • Supervised several Projects for Geotechnical, Land, Cadastral and Topographical Survey Projects
  • Manage a crew of two or more people Keep daily logs of work completed Download and manipulate data using AutoCAD
  • Produced Autocadd drawings utilizing DCA (Softdesk), as a base program for maintaining standards and consistency.
  • Imported and converted field data to .dwg file format for drafting in AutoCAD Civil 3D.
  • Experience with CAD software and Leica Viva robotic total station and GPS systems.
  • Performed linework of daily work on autocad based program.
  • Survey software included Western Surface, S3, Trimble GPSurvey with TrimMap, and Autocad.

Show More

57 CAD Jobs

No jobs at selected location

9. Construction Stakeout
demand arrow
high Demand
Here's how Construction Stakeout is used in Survey Party Chief jobs:
  • Performed boundary, topographic, aerial control, as-built and wetland surveys, as well as construction stakeout.
  • Coordinate and provide construction stakeout, to include curb and gutter, roadway and all utilities.
  • Hired as Party Chief specifically to cover the large amount of commercial and residential construction stakeout.
  • Prepared construction stakeouts, location surveys, topographic surveys, boundary surveys and as-built surveys.
  • Performed Construction Stakeout, Boundary, Topographic, ALTA and Oilfield surveys.
  • Directed a field crew in mapping and construction stakeout surveys.
  • Assisted field survey personal in conducting construction stakeout surveying.
  • Computed Construction Stakeout points in field from approved plans.
  • Worked primarily by myself to complete an array of survey tasks, mostly construction stakeout and building layout.
  • Survey work included construction stakeout, topos, boundaries, ALTA and property surveys.
  • Conduct pre-construction stakeout on Enbridge SAX 2 project.
  • Head of two and three man survey crews.Set up and ran GPS Networks for big jobs.Fish and Wildlife Boundaries.Environmental surveys.Construction stakeout.

Show More

10. Survey Equipment
demand arrow
high Demand
Here's how Survey Equipment is used in Survey Party Chief jobs:
  • Inspect survey equipment and software for performance abilities and operation readiness.
  • Calibrated and maintained survey equipment.
  • Order, deliver, and distribute survey equipment and keep track of inventory for 17 field crews totaling 400k.
  • Job Description: Direct field crew to complete job tasks, take field notes, operate survey equipment.
  • Maintained a company vehicle in working order, complete with a full array of survey equipment.
  • Collected detailed data through survey equipment and field notes for Launch and Receiver site fabrication.
  • Supervised and trained over 15 peers and junior enlisted on maintenance and operation of Survey equipment
  • Maintained and repaired highly technical survey equipment, and kept all equipment fully calibrated.
  • Operated survey equipment for layout of underground utilities, curb, gutter and buildings.
  • Maintain all survey equipment ensuring each instrument or tool is in proper working order
  • Used survey equipment such as tapes, chains and sight rods.
  • Operated survey truck and maintained survey equipment and tools.
  • Cared for and maintained high precision survey equipment.
  • Utilized both conventional and GPS survey equipment.
  • Maintain survey equipment and work vehicle.
  • Field calibrations on survey equipment.
  • Play lead role in the mobilization, operation, and de-mobilization of vessel survey equipment.
  • Managed three person crew using GPS systems and conventional survey equipment.
  • Maintain survey equipment.Supervisor: Randell West, Survey Dept.
  • Operated Leica GPS and Sokkia survey equipment with Carlson software.

Show More

1 Survey Equipment Jobs

No jobs at selected location

11. Sewer Lines
demand arrow
high Demand
12. RTK
demand arrow
high Demand
Here's how RTK is used in Survey Party Chief jobs:
  • Worked with static and RTK GPS technology, digital leveling, and other survey equipment as required.
  • Performed GPS observations using RTK units and submitted results to NGS for computation.
  • Design GPS static and RTK surveys to establish survey control on projects.
  • Recommended and implemented new training procedures for GPS/RTK field locations.
  • Used Trimble 5700 GPS to establish static and RTK control for various FDOT Projects, R/W and construction control projects.
  • Reduce level notes, draw sketches of properties, and interface with client GPS Mapping, RTK, Static.
  • Diagnosed parameters and settings for OPUS controls and set RTK controls for the Zupt systems for proper usage.
  • Operate instruments, including robotic and conventional, survey pro, Trimble GPS/RTK, and digital level.
  • Utilize all map resources, Trimble RTK and Post processing data

Show More

1 RTK Jobs

No jobs at selected location

13. Leica
demand arrow
high Demand
Here's how Leica is used in Survey Party Chief jobs:
  • Experience with Leica ts12 total station and AutoCAD with Carlson software.
  • Experience in using Robotic instrument and GPS mainly Leica models.
  • Operated Leica HDS-6000 3-D Laser Imaging Scanner.
  • Installed a new Leica Wireless System on a GP-4000 slip-form paver.
  • Set and verified all control for projects.Leica equipment.
  • Perform topographic, boundry, and construction surveys per clientsrequest while managing employees.Equipment operated: Leica and Carlson survCE.

Show More

14. TDS
demand arrow
high Demand
Here's how TDS is used in Survey Party Chief jobs:
  • Experience with multiple Robotic Survey Instruments, digital levels and TDS data collectors, first order control surveys.
  • Survey programs: TDS, Pocket 3D, TopSURV.
  • Used Hewlet/Packard 48GX with TDS surveypro software to calculate additional needed information.

Show More

15. Survey Data
demand arrow
average Demand
Here's how Survey Data is used in Survey Party Chief jobs:
  • Verify accuracy of survey data, including measurements and calculations conducted at survey sites.
  • Worked with contractors in providing survey data for expediting construction projects.
  • Collected and disseminated survey data.
  • Permit Landowners Upload and Download all Survey DATA 1st Office computer and in 1986 started using GPS and AUTOCAD (9)
  • Reviewed special provisions and assisted in the preparation of survey data sheets and SD forms for multiple ODOT survey projects.
  • Recorded and kept legal field notes of all survey data was responsible for ensuring the mathematical validity of data.
  • Lead field crew in the collection of survey data regarding topography, construction staking, and utility measurements i.e.
  • Performed project research, boundary calculations, and recorded accuracy of survey data, notes, and sketches.
  • Coordinate survey crew, notate and sketch in field book, and upload and process raw survey data.
  • Verified the accuracy of survey data, including the measurements and calculations of survey locations.
  • Document controls; compile survey data, document issues, and activities affecting project operations.
  • Document control of crew activities, survey data, and activities affecting project operations.
  • Do survey calculations and produce CAD drawings from sketches, and survey data.
  • Post-processed and plotted survey data, and ran calculations for construction stakeout.
  • Survey Data Entry, Construction Calculations, Boundary Resolution, Field Surveys.
  • Keep detailed and accurate records of crew activities, survey data.
  • Gather field survey data through use of conventional and GPS methods.
  • Analyzed control of survey data to ensure land survey standards.
  • Verified, corrected and adjusted survey data in the field.
  • Calculate parcel boundaries from field survey data.

Show More

9 Survey Data Jobs

No jobs at selected location

17. Carlson
demand arrow
average Demand
Here's how Carlson is used in Survey Party Chief jobs:
  • Drafted topographic, ALTA, preliminary/final plats for the survey department utilizing Carlson (CADD embedded) software.
  • Estimate quantities, linear footage, and yardage, both manually, and utilizing Carlson Takeoff.
  • Prepared base mapping and stakeout prep drawings using AutoCAD or Carlson Cad software.
  • Used AutoCAD with Carlson software to maintain maps and calculate coal tonnages.
  • Used Carlson Explorer data collector and also EFB for FDOT work.
  • Survey underground utilities that have been located using Carlson software.
  • Experience with Carlson and HP48 data collectors.
  • Experience in the field and office preparing drawings and providing technical assistance Generating topographic maps with Carlson software.

Show More

2 Carlson Jobs

No jobs at selected location

18. New Construction
demand arrow
average Demand
Here's how New Construction is used in Survey Party Chief jobs:
  • Head Party Chief in 2010 responsible for all new construction jobs from start to completion.
  • Managed several new construction staking projects from "field to finish".

Show More

6 New Construction Jobs

No jobs at selected location

19. Vertical Control
demand arrow
average Demand
Here's how Vertical Control is used in Survey Party Chief jobs:
  • Established and implemented methodologies for maintaining a vertical control network on dynamic surfaces traversing long distances over water.
  • Land and route surveying, construction staking, setting horizontal and vertical control, bridge surveys, and control monuments.
  • Established horizontal and vertical controls for long term large-scale projects including highways, bridges, and stadium construction.
  • Lay out grids, and determine horizontal and vertical controls.
  • Established city Benchmark system (vertical control).
  • Perform land surveys including boundary surveys, horizontal and vertical control surveys, photogrammetric surveys and construction staking.
  • Find existing monumented vertical control along project corridor.
  • Established a vertical control network on fire hydrants using an electronic level for the city of Twin Falls.

Show More

20. Control Points
demand arrow
average Demand
Here's how Control Points is used in Survey Party Chief jobs:
  • Managed a three-person crew responsible for surveying underground surface control points, and locations for large uranium mining operation.
  • Used said control to elevate and coordinate photo control points on aerial photography used in mapping projects.
  • Experience with robotic GPS equipment to establish control points and perform topographic survey.
  • Set control points and Design points on right of way of pipeline.
  • Established control points, boundary points with most exactly accuracy.
  • Maintain control points and continually monitor traverses to ensure precision.
  • Preformed Traverse and Bench Loops to set control points.
  • Use of total stations to set control points.
  • Set control points to start a project.
  • Base line, control points, and utilities were for Route 9A West Side Manhattan (6.3 ml).
  • Lay control points with GPS.
  • Set up calibration files and fixed coordinates for Trimble 5800 GPS base station by surveying existing control points.

Show More

21. Nikon
demand arrow
average Demand
22. GIS
demand arrow
average Demand
Here's how GIS is used in Survey Party Chief jobs:
  • Support staff Geologist in wetland delineation for mitigation design.
  • Provide technical assistance to others on assigned projects and serve as a resource person to other departments on GIS related topics.
  • Managed travel related budgets, equipment logistics, and the hiring of local staff including training and disciplinary process.
  • Capture, store, and retrieve data to be used for Geographic Information Systems (GIS).
  • Prepared GIS maps of crude oil pipeline networks in North Dakota using ArcGIS 10.0
  • Contribute to the development and maintenance of the GIS.
  • Augmented town wide GIS mapping with GPS field editing.
  • Generated 3D models for several urban area GIS.
  • Researched deeds utilizing GIS and court records.
  • Used GPS/GIS technology and satellites data.
  • Constructed maps utilizing Autocad and GIS programs
  • Used handheld GPS to collect and download data into a GIS database for WSDOT roadway features inventory program (RFIP)
  • survey and Geographical Information Systems (GIS) Dar-es-Salaam Tanzania and Up Country.

Show More

121 GIS Jobs

No jobs at selected location

23. Preliminary Survey
demand arrow
average Demand
Here's how Preliminary Survey is used in Survey Party Chief jobs:
  • Performed preliminary survey for proposed pipeline route.
  • Perform as-built surveys, preliminary surveys and locating anomalies for dig up, repair and replacement of existing pipeline.
  • Performed preliminary survey for pipeline projects including locatingunderground utility, and boundary work.
  • Survey Party Chief in charge of survey crew on preliminary survey of 69 mile 36 pipeline.
  • Worked on numerous gas pipeline asbuilts & preliminary surveys along with land surveys.
  • Supervised (4) survey crews working on 45 mile preliminary survey.
  • Team lead on four man crew conducting Preliminary Survey on Phillips 66 Sweeney Fractionator Project
  • Head of two man survey crew.Preliminary survey for Q-Bridge.

Show More

24. Survey Projects
demand arrow
average Demand
Here's how Survey Projects is used in Survey Party Chief jobs:
  • Developed proposals for survey projects in accordance with all applicable standards and specifications.
  • Engaged in making plane and/or geodetic surveys for construction, topographic, right-of-way, and control survey projects.
  • Perform needed office and field calculations for survey projects as well as post processing.
  • Used various computer surveying programs to calculate and implement survey projects.
  • Project Manager for all survey projects.
  • Managed extensive boundary survey projects in both rural and urban environments for private land developers.

Show More

1 Survey Projects Jobs

No jobs at selected location

25. Courthouse Records
demand arrow
average Demand
Here's how Courthouse Records is used in Survey Party Chief jobs:
  • Worked with County Courthouse Records (CCR) locating foreign pipeline crossings.

Show More

26. Sokkia
demand arrow
average Demand
Here's how Sokkia is used in Survey Party Chief jobs:
  • Operated SOKKIA SET4-B Model 2 Instrument with a SDR 33 Data Collector.
  • Operated Sokkia Total Station Instrument with SMI software.
  • Work with GPS- navigators: Sokkia, Trimble R4, and R8.
  • Used Sokkia and Leica total stations, Survey Pro software * Responsible for calculations, staking for construction.

Show More

27. Property Corners
demand arrow
average Demand
Here's how Property Corners is used in Survey Party Chief jobs:
  • Used property maps and construction site plans to find existing property corners and set points on sites according to those plans.
  • Survey for property corners, building corners & footers, Site Location, etc.
  • Conduct large scale boundary surveys and set property corners/discs.
  • Set property corners, section corners.
  • Locate all line x-ings, property corners, profiled roads and creeks.

Show More

28. Crew Members
demand arrow
average Demand
Here's how Crew Members is used in Survey Party Chief jobs:
  • Provide input to Project Manager (Field Supervisor) and Group Leader for the formal performance evaluation of crew members.
  • Train crew members to be able to excel at their positions and advance in the field of surveying.
  • Train crew members, and direct their work in such activities as performing surveys or crew tasks.
  • Trained survey crew members on surveying principles, practices, and methods.
  • Assist, and train other field crew members and party chiefs.
  • Led 6 crew members on Condemnation Surveys throughout Missouri.
  • Approved and submitted crew members time sheets and expense reports.Download data and field notes.

Show More

24 Crew Members Jobs

No jobs at selected location

29. Deed Research
demand arrow
average Demand
Here's how Deed Research is used in Survey Party Chief jobs:
  • Deed research, drafting, data entry, topographic survey and construction stakeout for the natural gas industry.
  • Gained knowledge and experience with deed research and gathering data on road layout.
  • Full property Surveys from Deed research to Subdividing large tracts of land.
  • Deed research and plot plan research conducted where historical reference was needed.
  • Performed deed research and drafted legal sketches.

Show More

30. Property Lines
demand arrow
low Demand
Here's how Property Lines is used in Survey Party Chief jobs:
  • Completed courthouse research to collect plat and deed records to establish existing property lines on projects.
  • Calculated heights, depths, relative positions, property lines, and other characteristics of terrain.
  • Calculated heights, depths, relative positions and property lines.
  • Verified property lines and performed house location surveys.
  • Led in the staking of Property lines, Boundary corners for Logging companies, Staking ofSubdivisions and Roads.
  • Calculated heights,depths, relative positions and property lines.

Show More

31. Construction Plans
demand arrow
low Demand
Here's how Construction Plans is used in Survey Party Chief jobs:
  • Coordinated technical investigations, surveys, drafting, development of construction plans and specifications.
  • Complete complex technical surveys for the development of roadway, intersection and bridge construction plans.
  • Prepared construction plans and documents, record drawings, and calculated quantities.
  • Assist in project designs and preparation of construction plans.
  • Perform all field calculations according to construction plans.

Show More

7 Construction Plans Jobs

No jobs at selected location

32. Tsc3
demand arrow
low Demand
Here's how Tsc3 is used in Survey Party Chief jobs:
  • Used Trimble TSC3 data collector.
  • Bray's bayouTrimble surveying R-6, R-8, TSC3 GPS, 5600-5800 Robotics, Conventional ACU Trimble equipment in water.

Show More

33. Civil 3D
demand arrow
low Demand
Here's how Civil 3D is used in Survey Party Chief jobs:
  • Performed downloads, uploads, drafting of underground utilities using 2013 Civil 3D, and various other office duties.
  • Used TerraModel, and some AutoCAD Civil 3D.
  • Process field data using Civil 3D.

Show More

34. Construction Sites
demand arrow
low Demand
Here's how Construction Sites is used in Survey Party Chief jobs:
  • Communicate with project managers or on site supervisor to deliver acceptable layout on construction sites.
  • Communicated with site managers to determine most efficient and practical layout on construction sites.
  • Establish control points for crews on construction sites as well as residential boundary surveys.
  • Performed various aspects of layout at construction sites throughout New Jersey.
  • Transport materials, tools and needed equipment to construction sites.

Show More

9 Construction Sites Jobs

No jobs at selected location

35. Survey Reports
demand arrow
low Demand
Here's how Survey Reports is used in Survey Party Chief jobs:
  • Analyzed survey reports, maps, blueprints and other topographical and geologic data to effectively plan projects.
  • Analyze survey reports, maps, drawings, blueprints, aerial photography, and other topographicalor geologic data to plan projects.
  • Established and reestablished bench marks & topographic surveying by RTK GPS system Provided necessary survey reports.

Show More

1 Survey Reports Jobs

No jobs at selected location

36. Civil Engineering
demand arrow
low Demand
Here's how Civil Engineering is used in Survey Party Chief jobs:
  • Hired to build a land surveying presence to an established civil engineering firm.
  • Utilized AutoCAD software and civil engineering plans for survey layout.
  • Directed field land survey crew performing boundary surveys, civil engineering design surveys, as-built surveys and development surveys.
  • Key Accomplishments Gained hands on experience into many facets of civil engineering, surveying and crew leadership.
  • Worked full time while earning a civil engineering degree.

Show More

78 Civil Engineering Jobs

No jobs at selected location

37. Tsc2
demand arrow
low Demand
Here's how Tsc2 is used in Survey Party Chief jobs:
  • Collected data with Trimble Generation R-8, and TSC2 Systems to perform pre-plot and post-plot seismic surveys.

Show More

38. Fema
demand arrow
low Demand
Here's how Fema is used in Survey Party Chief jobs:
  • Assist with FEMA elevation certificate surveys.
  • Research FEMA flood panels and LOMCs to determine flood zones.

Show More

310 Fema Jobs

No jobs at selected location

39. Highway Construction
demand arrow
low Demand
Here's how Highway Construction is used in Survey Party Chief jobs:
  • Managed and operated a one-man GPS survey unit to perform all facets of surveying stakeout on a highway construction project.
  • Generate road alignments, calculations for highway construction, guardrail and signage markings; including water and reuse lines.
  • Direct the work of a survey party of technicians acquiring survey data necessary to design highway construction project.
  • Used Trimble instuments to locate and receive information for bridge work as well as highway construction.

Show More

1 Highway Construction Jobs

No jobs at selected location

40. Data Processing
demand arrow
low Demand
Here's how Data Processing is used in Survey Party Chief jobs:
  • Performed field data processing and deed composition Performed Land Surveys and Stakeout Utilized AutoCad and Carlson Survey Software

Show More

55 Data Processing Jobs

No jobs at selected location

41. Survey Operations
demand arrow
low Demand
Here's how Survey Operations is used in Survey Party Chief jobs:
  • Perform survey operations for Paladins.
  • Interact with client and members of the survey crew to ensure site survey operations.
  • Manage seismic survey operations for multiple crews throughout North America.
  • Survey Operations on Dive vessels Lift boat vessels and Lay barges
  • Assisted in West Point Cadet training in survey operations.
  • Directed all field GPS survey operations.
  • Conduct project research, perform survey operations, and record data to insure project success Supervise the training of new hires.
  • Coordinated Survey operations in newly formed civil engineering & land surveying company focusing on mining, oil & gas work
  • Performed data logs for survey operations alone as logged all data needed for recordingvideo with Visual Soft Visual DVR.

Show More

43. Customer Service
demand arrow
low Demand
3,312 Customer Service Jobs

No jobs at selected location

44. Route Surveys
demand arrow
low Demand
45. Cogo
demand arrow
low Demand
Here's how Cogo is used in Survey Party Chief jobs:
  • Solve the more routine and less complex surveying problems using COGO Applications and/or handheld software.
  • Experience with AutoCAD, Agtek graphic surveying software, and LLCOGO graphic design software.

Show More

46. QA
demand arrow
low Demand
Here's how QA is used in Survey Party Chief jobs:
  • Survey Party Chief involved in engineer lay out, final check, QAQC inspect and approval prior to pouring of concrete.
  • Augment with the joint forces, Department QA\QC, Implemented standards and procedure
  • Perform a final QA/QC check with contact Project Manager.
  • Conducted QA/QC of data and downloaded to computer.
  • Position: QA/QC Fabrication Work Shop Team Leader.

Show More

24 QA Jobs

No jobs at selected location

47. QC
demand arrow
low Demand
Here's how QC is used in Survey Party Chief jobs:
  • Position: QC / Welding Engineer.

Show More

102 QC Jobs

No jobs at selected location

48. Government Agencies
demand arrow
low Demand
Here's how Government Agencies is used in Survey Party Chief jobs:
  • Provided government agencies with quality and accurate ALTA/ACSM, right-of-way, easement, boundary, topographic and as-built land surveys.
  • Interact with local government agencies and utility companies.

Show More

34 Government Agencies Jobs

No jobs at selected location

49. Technical Support
demand arrow
low Demand
Here's how Technical Support is used in Survey Party Chief jobs:
  • Provide technical support for survey and construction management divisions.
  • Provided technical support during operations and maintenance.

Show More

129 Technical Support Jobs

No jobs at selected location

50. General Public
demand arrow
low Demand
111 General Public Jobs

No jobs at selected location

Survey Party Chief Jobs

NO RESULTS

Aw snap, no jobs found.

20 Most Common Skills For A Survey Party Chief

Topographic Surveys

30.4%

Property Boundaries

13.9%

GPS

11.8%

Construction Layout

8.5%

Total Station

6.6%

Data Collection

3.7%

Topcon

2.9%

CAD

2.6%

Construction Stakeout

2.5%

Survey Equipment

2.2%

Sewer Lines

1.8%

RTK

1.7%

Leica

1.7%

TDS

1.7%

Survey Data

1.7%

Legal Descriptions

1.5%

Carlson

1.4%

New Construction

1.3%

Vertical Control

1.1%

Control Points

1.0%
Show More

Typical Skill-Sets Required For A Survey Party Chief

Rank Skill
1 Topographic Surveys 26.0%
2 Property Boundaries 11.9%
3 GPS 10.1%
4 Construction Layout 7.2%
5 Total Station 5.6%
6 Data Collection 3.2%
7 Topcon 2.5%
8 CAD 2.3%
9 Construction Stakeout 2.1%
10 Survey Equipment 1.9%
11 Sewer Lines 1.6%
12 RTK 1.5%
13 Leica 1.5%
14 TDS 1.5%
15 Survey Data 1.4%
16 Legal Descriptions 1.2%
17 Carlson 1.2%
18 New Construction 1.1%
19 Vertical Control 0.9%
20 Control Points 0.8%
21 Nikon 0.8%
22 GIS 0.8%
23 Preliminary Survey 0.7%
24 Survey Projects 0.7%
25 Courthouse Records 0.7%
26 Sokkia 0.6%
27 Property Corners 0.6%
28 Crew Members 0.6%
29 Deed Research 0.6%
30 Property Lines 0.6%
31 Construction Plans 0.5%
32 Tsc3 0.4%
33 Civil 3D 0.4%
34 Construction Sites 0.4%
35 Survey Reports 0.4%
36 Civil Engineering 0.4%
37 Tsc2 0.4%
38 Fema 0.4%
39 Highway Construction 0.4%
40 Data Processing 0.4%
41 Survey Operations 0.4%
42 Legal Documents 0.4%
43 Customer Service 0.4%
44 Route Surveys 0.4%
45 Cogo 0.3%
46 QA 0.3%
47 QC 0.3%
48 Government Agencies 0.3%
49 Technical Support 0.3%
50 General Public 0.3%
{[{skill.rank}]} {[{skill.name}]} {[{skill.percentageDisplay}]}%
Show More

614 Survey Party Chief Jobs

Where do you want to work?

To get started, tell us where you'd like to work.
Sorry, we can't find that. Please try a different city or state.