FIND PERSONALIZED JOBS
Sign up to Zippia and discover your career options with your personalized career search.
Sorry, we can't find that. Please try a different city or state.

Systems Planner

This job has expired and is no longer available.
APPLY NOW
Apply Now
×
FIND
PERSONALIZED JOBS

Sorry, we can't find that. Please try a different city or state.

CONTENT HAS
BEEN UNLOCKED
Close this window to view unlocked content
or
find interesting jobs in

Log In

Log In to Save

Sign Up to Save

Sign Up to Dismiss

Sign Up

SIGN UP TO UNLOCK CONTENT

or

The email and password you specified are invalid. Please, try again.

Email and password are mandatory

Forgot Password?

Don't have an account? Sign Up

reset password

Enter your email address and we will send you a link to reset your password.

Back to Log In

Log In

Log In to Save

Sign Up to Save

Sign Up to Dismiss

Sign up to save the job and get personalized job recommendations.

Sign up to dismiss the job and get personalized job recommendations.

or

The email and password you specified are invalid. Please, try again.

Email and password are mandatory

Already have an account? Log in

reset password

Enter your email address and we will send you a link to reset your password.

Back to Log In

Company Saved

Answer a few questions and view jobs at that match your preferences.

Where do you want to work?

Job Saved

See your Saved Jobs now

or

find more interesting jobs in

Job Dismissed

Find better matching jobs in

Your search has been saved!

Top 50 Systems Planner Skills

Below we've compiled a list of the most important skills for a Systems Planner. We ranked the top skills based on the percentage of Systems Planner resumes they appeared on. For example, 5.2% of Systems Planner resumes contained Operational Efficiency as a skill. Let's find out what skills a Systems Planner actually needs in order to be successful in the workplace.

These are the most important skills for a Systems Planner:

1. Operational Efficiency

demand arrow
high Demand

2. Test Cases

demand arrow
high Demand
Here's how Test Cases is used in Systems Planner jobs:
  • Develop test cases from Business and Technical Requirements.
  • Create detailed test cases and test plans for .NET web applications.

Show More

3. Technical Support

demand arrow
high Demand
Here's how Technical Support is used in Systems Planner jobs:
  • Provided technical support for installation forces.
  • Produce customized antisera for OEM customers develop assays, manufacture product, provide technical support and trouble-shooting.

Show More

4. Logistics

demand arrow
high Demand
Here's how Logistics is used in Systems Planner jobs:
  • Coordinated & Assisted on Well-Drilling Operations and Logistics.

Show More

5. Electrical Systems

demand arrow
high Demand
Job type you want
Full Time
Part Time
Internship
Temporary

6. Project Management

demand arrow
high Demand
Here's how Project Management is used in Systems Planner jobs:
  • Provide project management and resource planning activities to ensure departmental goals are achieved.

Show More

7. Production Schedules

demand arrow
high Demand

8. Management System

demand arrow
high Demand
Here's how Management System is used in Systems Planner jobs:
  • Design and development of PC based records management system-University of Illinois College of Nursing.

Show More

9. MSE

demand arrow
high Demand
Here's how MSE is used in Systems Planner jobs:
  • Assessed and provided interim online services that allow customers to better serve themselves and contribute to the GEOINT base.
  • Incorporated use of internal COMSEC devices that processed Over The Air Rekeying (OTAR) capability.

Show More

10. Communications Architecture

demand arrow
high Demand

11. BOM

demand arrow
high Demand

12. MRP

demand arrow
high Demand
Here's how MRP is used in Systems Planner jobs:
  • Confirm work bench is accurate with MRP for material regarding lead times and safety stock.
  • Implemented critical route card changes and ensure that MRP is updated to current revision.
  • Maintain MRP reports, material releases and vendor relationships.
  • Serve as a member of the MRP support group with our software MXP.

Show More

13. Business Requirements

demand arrow
high Demand
Here's how Business Requirements is used in Systems Planner jobs:
  • Assessed business requirements, evaluated solution alternatives, and presented recommendations to management.
  • Team lead in the investigation and development of business requirements for two multi-billion dollar billing and invoicing systems.

Show More

14. Inventory Control

demand arrow
high Demand

15. Troubleshoot

demand arrow
average Demand
Here's how Troubleshoot is used in Systems Planner jobs:
  • Use PLC Software to assist in troubleshooting and diagnosing system failures.
  • Use Electrical Prints to troubleshoot and diagnose equipment failures.
  • Install, Maintain and Troubleshoot AC/DC Drive Systems.

Show More

16. ISO

demand arrow
average Demand
Here's how ISO is used in Systems Planner jobs:
  • Acted as liaison between operational user groups and developers organization.
  • Worked closely with Project Management teams to isolate and resolve defect and incidents that came up through implementations.
  • Coordinated and maintained support agreements while serving as communications advisor for Military Construction program.
  • Work hand in hand with Supervisors, assist with any daily duties Run Daily, Weekly Reports.
  • Implement Preventive Maintenance (PM's) Schedule PM's and work orders to Supervisors weekly Add new equipment into system.
  • Home Based) Key liaison between development engineering, product group, sales, system engineering and customer.

Show More

17. Oversaw

demand arrow
average Demand

18. Customer Service

demand arrow
average Demand

19. Intranet

demand arrow
average Demand
Here's how Intranet is used in Systems Planner jobs:
  • Implemented and administered an intranet Supplier/Orbital communication tool.
  • Owned and managed security for web-based systems and Intranet worldwide.

Show More

20. DOD

demand arrow
average Demand
Here's how DOD is used in Systems Planner jobs:
  • Provide briefings and reports to high-level DoD/IC decision-makers to support long range planning
  • Managed DOD and EPA programs for military base closure Systems analysis and logistics modelling Other GPS and GIS classified projects.

Show More

21. On-Time Delivery

demand arrow
average Demand
Here's how On-Time Delivery is used in Systems Planner jobs:
  • Track orders to ensure on-time delivery, communicate any delays that may cause production interruptions.

Show More

22. SME

demand arrow
average Demand
Here's how SME is used in Systems Planner jobs:
  • Collected, processed, and developed readiness assessment reports for use in tracking and managing MOD and MOI readiness progression.
  • Provide Afghan National Security Forces defense readiness, planning, coordination of assessments and reporting for the CSTC-A CJ3/CJ5.

Show More

23. C4

demand arrow
average Demand
Here's how C4 is used in Systems Planner jobs:
  • Developed frequency operational requirements, telecommunications service request and disseminated operation information to ensure C41 communications connectivity.
  • Supervised 6 Project Managers for upward and downward generated C4 systems requirements and implementations.
  • Managed installation, modification, and removal of C4 systems.

Show More

24. Joint Staff

demand arrow
average Demand

25. Computer System

demand arrow
average Demand
Here's how Computer System is used in Systems Planner jobs:
  • Utilize the Movex 10C computer system that will be used by the entire company in July.

Show More

26. Multi-National

demand arrow
average Demand

27. GPS

demand arrow
average Demand

28. Network Configuration

demand arrow
average Demand

29. Benefit-Cost Analysis

demand arrow
average Demand

30. Autocad

demand arrow
low Demand
Here's how Autocad is used in Systems Planner jobs:
  • Initiated channel configurations for systems using software tools such as AutoCAD and Enterprise Physical Connection Tool (EPCT).
  • Update systems maps and create job sheets using AUTOCAD

Show More

31. Switch Network

demand arrow
low Demand

32. Voip

demand arrow
low Demand
Here's how Voip is used in Systems Planner jobs:
  • Gather and compile network capacity data algorithms throughout the wholesale cable VoIP network.

Show More

33. QA

demand arrow
low Demand
Here's how QA is used in Systems Planner jobs:
  • Created test scripts as a guideline for QA.

Show More

34. Drsn

demand arrow
low Demand

35. DSP

demand arrow
low Demand

36. DSN

demand arrow
low Demand

37. ACE

demand arrow
low Demand
Here's how ACE is used in Systems Planner jobs:
  • Maintained logistical operations and excellent supplier relationships in order to support customer systems worldwide and expedite replacement of end-of-life part items.
  • Performed Aerospace Vehicle Distribution Office duties, coordinating critical missile downstage shipments.
  • Design capacity management prototype user interfaces for external wholesale cable providers.
  • Managed system-level interface issues by consulting technical subject matter experts (SME) to discuss design concepts and overall system impact.
  • Planned contacts for DSP, GPS, MSX and ACE using a Sun Workstation to meet all satellite requirements.
  • Coordinate missions and plan collects for unique AF space ISR system using Satellite Tool Kit (STK).
  • Schedule the Aerospace Vehicle Distribution Office duties in coordinate for the critical missile downstage shipments.
  • Estimated and assigned required disk space for live jobs and archived completed jobs to tape.
  • Created training documents and trained replacement while reducing backlog and ship on time metrics.
  • Design for a new office space in New Orleans.
  • Deployed and interface systems into GSC-39, GSC-52, HTM, and DKET for Data path and OKET for Space link.
  • Worked with Data path, Space link, ITT and L3 COMM on multiple projects.
  • Provided a dynamic situational awareness representation for customer analysis of conditions and identification of adjacent team members.
  • Total E&P Luanda, Angola Lead layout and space planning designer for 15 floors of custom office furniture.
  • Resolve interface conflicts between old systems and new design systems Troubleshoot for all communication protocol.

Show More

38. R

demand arrow
low Demand
Here's how R is used in Systems Planner jobs:
  • Organized customer information and job specifications for the system operators.
  • Provided Project Management expertise through hospitality initiatives.
  • Participated in consultant's selection process.
  • Provided networking engineering solutions to extend Victory Enterprise Secure, Non Secure and Joint Data and Voice Networks.
  • Planned expansion & reliability of transmission grid with power load flow software for steady state & contingency analysis.
  • Participated in the development of plans and strategies for state highway systems plan, WTP, and MTP.
  • Supported R&O department with quick turnaround repairs of parts and equipment for U.S. Navy systems.
  • Reviewed Bills of Material and made corrections to ensure accuracy and quality before releasing to production.
  • Schedule and plan jobs to work centers effectively, and efficiently to meet customer due dates.
  • Reason for Leaving: Lay off due to downsizing and restructuring the organization.
  • Review planned orders, create requisitions, manage approvals and transmit to suppliers.
  • Perform Professional Planning work in support of Puget Sound Region planning studies.
  • Set up forecasting and safety stock levels of high turnover inventory.
  • Coordinated work and studies with federal and local agencies.
  • Assist my boss on various projects.
  • Cover for the Buyer purchasing mill rolls, and diazo film in event of absence or vacation.
  • Worked closely with application development teams in creating project profiles, plans, budgets, and timelines.
  • Expedited shipments from offsite locations to schedule material receipts to support weekly production plan.
  • Managed projects budgets and control.
  • Involved in many steering committies and technical working on transportation planning issues.

Show More

39. Hvac

demand arrow
low Demand
Here's how Hvac is used in Systems Planner jobs:
  • Led HVAC upgrade; organized schedule & relocation of personnel; $2.5M project completed on time.

Show More

40. System Design

demand arrow
low Demand
Here's how System Design is used in Systems Planner jobs:
  • Enabled 95% of large projects awarded within personal territory by determining product offerings, verifying system design and assessing competition.

Show More

41. Circuit Boards

demand arrow
low Demand

42. Network Enhancements

demand arrow
low Demand

43. Product Quality

demand arrow
low Demand

44. QMS

demand arrow
low Demand

45. New Equipment

demand arrow
low Demand

46. Cobs

demand arrow
low Demand

47. Ensure Accuracy

demand arrow
low Demand

48. Data Analysis

demand arrow
low Demand
Here's how Data Analysis is used in Systems Planner jobs:
  • Advised the Company/Clients for the most probable areas of Hydrocarbon existence, upon DDM Technology Data Analysis results.
  • Provided data analysis and generated monthly status reports/graphs/metrics to performance using Excel and Powerpoint.

Show More

49. Transmission Planning

demand arrow
low Demand
Here's how Transmission Planning is used in Systems Planner jobs:
  • Perform transmission planning and accomplish integration feasibility & impact studies.

Show More

50. System Interfaces

demand arrow
low Demand

Systems Planner Jobs

NO RESULTS

Aw snap, no jobs found.

20 Most Common Skills For A Systems Planner

Operational Efficiency

8.7%

Test Cases

8.0%

Technical Support

6.7%

Logistics

5.3%

Electrical Systems

5.3%

Project Management

5.3%

Production Schedules

5.3%

Management System

4.7%

MSE

4.7%

Communications Architecture

4.7%

BOM

4.7%

MRP

4.7%

Business Requirements

4.7%

Inventory Control

4.7%

Troubleshoot

4.0%

ISO

4.0%

Oversaw

4.0%

Customer Service

4.0%

Intranet

3.3%

DOD

3.3%
Show More

Typical Skill-Sets Required For A Systems Planner

Rank Skill
1 Operational Efficiency 5.2%
2 Test Cases 4.8%
3 Technical Support 4.0%
4 Logistics 3.2%
5 Electrical Systems 3.2%
6 Project Management 3.2%
7 Production Schedules 3.2%
8 Management System 2.8%
9 MSE 2.8%
10 Communications Architecture 2.8%
11 BOM 2.8%
12 MRP 2.8%
13 Business Requirements 2.8%
14 Inventory Control 2.8%
15 Troubleshoot 2.4%
16 ISO 2.4%
17 Oversaw 2.4%
18 Customer Service 2.4%
19 Intranet 2.0%
20 DOD 2.0%
21 On-Time Delivery 2.0%
22 SME 1.6%
23 C4 1.6%
24 Joint Staff 1.6%
25 Computer System 1.6%
26 Multi-National 1.6%
27 GPS 1.6%
28 Network Configuration 1.6%
29 Benefit-Cost Analysis 1.6%
30 Autocad 1.2%
31 Switch Network 1.2%
32 Voip 1.2%
33 QA 1.2%
34 Drsn 1.2%
35 DSP 1.2%
36 DSN 1.2%
37 ACE 1.2%
38 R 1.2%
39 Hvac 1.2%
40 System Design 1.2%
41 Circuit Boards 1.2%
42 Network Enhancements 1.2%
43 Product Quality 1.2%
44 QMS 1.2%
45 New Equipment 1.2%
46 Cobs 1.2%
47 Ensure Accuracy 1.2%
48 Data Analysis 1.2%
49 Transmission Planning 1.2%
50 System Interfaces 1.2%
{[{skill.rank}]} {[{skill.name}]} {[{skill.percentageDisplay}]}%
Show More

2,711 Systems Planner Jobs

Where do you want to work?

To get started, tell us where you'd like to work.
Sorry, we can't find that. Please try a different city or state.