FIND PERSONALIZED JOBS
Sign up to Zippia and discover your career options with your personalized career search.
Sorry, we can't find that. Please try a different city or state.

Test Manager

This job has expired and is no longer available.
APPLY NOW
Apply Now
×
FIND
PERSONALIZED JOBS

Sorry, we can't find that. Please try a different city or state.

CONTENT HAS
BEEN UNLOCKED
Close this window to view unlocked content
or
find interesting jobs in

Log In

Log In to Save

Sign Up to Save

Sign Up to Dismiss

Sign Up

SIGN UP TO UNLOCK CONTENT

or

The email and password you specified are invalid. Please, try again.

Email and password are mandatory

Forgot Password?

Don't have an account? Sign Up

reset password

Enter your email address and we will send you a link to reset your password.

Back to Log In

Log In

Log In to Save

Sign Up to Save

Sign Up to Dismiss

Sign up to save the job and get personalized job recommendations.

Sign up to dismiss the job and get personalized job recommendations.

or

The email and password you specified are invalid. Please, try again.

Email and password are mandatory

Already have an account? Log in

reset password

Enter your email address and we will send you a link to reset your password.

Back to Log In

Company Saved

Answer a few questions and view jobs at that match your preferences.

Where do you want to work?

Job Saved

See your Saved Jobs now

or

find more interesting jobs in

Job Dismissed

Find better matching jobs in

Your search has been saved!

Top 50 Test Manager Skills

Below we've compiled a list of the most important skills for a Test Manager. We ranked the top skills based on the percentage of Test Manager resumes they appeared on. For example, 36.1% of Test Manager resumes contained Test Cases as a skill. Let's find out what skills a Test Manager actually needs in order to be successful in the workplace.

These are the most important skills for a Test Manager:

1. Test Cases

demand arrow
high Demand
Here's how Test Cases is used in Test Manager jobs:
  • Created, Reviewed, and Approved Test Documentation including Test Plans, Test Cases, Test Estimation and Test Data Requests.
  • Initiated a program-wide audit process to verify the quality of test cases and provide weekly feedback to the test team.
  • Test automation of 1000+ test cases led to more test coverage and consistent test quality and reduced human error factors.
  • Prepared the test artifacts for regression, identified the regression test cases and set up the regression test bed.
  • Supervised 8 analysts in the development of test plans and test cases for a resident 800 billing system.
  • Designed and reviewed Test plan and Test cases and identified the gaps between Requirements and Test cases.
  • Prepare test plans and test cases to ensure the product adheres to the sprint backlog/story.
  • Created Test cases from business use cases, Test data for SOAP UI testing.
  • Create and execute IT Assembly, Integration, Regression, System test cases.
  • Automated test cases using Selenium IDE & Web Diver with JAVA & TestNG.
  • Assign Test cases to Offshore, review them and provide review comments.
  • Managed test cases and defects and assigned tasks to the corresponding resources.
  • Used Mercury Quality Center to write test cases.
  • Revised test plans and test cases as needed.
  • Involved in the execution of test cases.
  • Estimate test cases and test scenarios.
  • Developed use case diagrams using UML for acceptance testing Executed test cases and utilized the defect-tracking tool - Rational ClearQuest.
  • Identified the final regression test bed and provide a roadmap for preparation of the regression test cases for automation.
  • Created test scenarios and test cases and reviewed with the project team Test case execution.
  • Developed test cases, test scripts for four different Internet based financial applications.

Show More

4 Test Cases Jobs

No jobs at selected location

2. Status Reports

demand arrow
high Demand
Here's how Status Reports is used in Test Manager jobs:
  • Produced Release-specific Monthly and Yearly Metrics and Status reports for senior management.
  • Provided weekly status reports on Defects, Test Cases performed and any new or existing issues related to the provider domain.
  • Functioned in lead capacity on multiple projects, and provided management with timely status reports and test results.
  • Extract metrics and graphs from bug reporting tool (HP QC) and provide status reports to stakeholders.
  • Published Daily Status, Weekly Status and Overall Project Status Reports to various stakeholders and higher ups.
  • Provide regular status reports to upper management, updating tasks and tasks estimates, as necessary.
  • Develop detailed work plans, schedules; project estimates, resource plans and status reports.
  • Created and maintained project test plans, communications plans, and status reports.
  • Provide weekly status reports to Management (PMO, Audit and Corporate).
  • Send out daily and weekly status reports to the stakeholders.
  • Prepare and distribute Weekly QA status reports and Defects reports.
  • Provide daily and weekly status reports to Project Management.
  • Reviewed status reports submitted by application QA Leads heads.
  • Provide Weekly Status reports to the TD IT Managers.
  • Create and publish status reports to senior leadership.
  • Review daily QA project status reports.
  • Prepare and publish status reports.
  • Produce testing deliverables such as the Testing Readiness Checklists, Master Test Plan, Weekly Status Reports and Test Summaries.
  • Create and distribute detailed status reports that reflect progress against team deliverables.
  • Experience in Daily Status reports (DSRs), Weekly Status Reports (WSRs) and reporting to the Stake Holders.

Show More

3. QA

demand arrow
high Demand
Here's how QA is used in Test Manager jobs:
  • Worked with range QA, division and departmental engineering staff to identify solutions that meet customer test and data requirements.
  • Developed effective team working relationship with engineering, manufacturing, test and QA organizations to execute product line goals.
  • Ensured successful upgrade from their current configurations to support the new banking system and also establish the QA process.
  • Involved with UAT hand-off from QA, train and mentor UAT users and document procedures and application flows.
  • Represent QA Team in DCAB meetings and decide on Go/NO-GO based on the metrics.
  • Installed and set up the QA environment with new racks and servers.
  • Provide technical support and training to QAO members and business partners.
  • Managed a small SQA team in a large pharmaceutical firm.
  • Trained QA Analysts for developing under Mercury QTP.
  • Worked and implemented QA Efforts using Agile methodologies.
  • Analyzed and calculated the HVAC (AC, power, UPS) requirements for the QA lab.
  • Analysed product development/test/implement life cycle, QA process, methodology & resource allocation.
  • Helped develop TRD (Technical requirement document) and some of the missing links of complete QA cycle.
  • Liaised with Dev, QA, Support and Operations teams and got the issues resolved on priority.
  • Represented QA in meetings with Identrus, Citibank, Wells Fargo & Royal Bank of Scotland.
  • Conducted Internal Process Reviews and Project Health Checks in conjunction with PQAs for every Quarter.
  • Managed QA of entire flag-ship project, reporting the director Wendy Kotulla.
  • Worked as the QA Team Lead at Weyerhaeuser.
  • Worked as the QA Team Lead in the SAP implementation at Lucent Technologies and after its spin-off at Avaya, Inc.
  • Procured, configured, and utilized Compuware Testpartner, QA Director, and Reconcile.

Show More

1 QA Jobs

No jobs at selected location

4. Project Management

demand arrow
high Demand
Here's how Project Management is used in Test Manager jobs:
  • Conducted daily testing progress meetings, prioritizing defects and communicated overall testing progress to project management office and client.
  • Mentored business analysts within Project Management Office on business analysis and requirements engineering best practices.
  • Performed project management, business process management, test management, and requirements engineering.
  • Worked with project management scheduling system at component level and organizational interfaces.
  • Provided guidance in project management methodology, estimation and scope management.
  • Fulfilled project management responsibilities relating to both major and minor releases.
  • Developed Project Management Plan and Risk Management Plan.
  • Defined SOW for Manual and Automation Test Activities and proposed Time, schedule, and Cost effectiveness to Project Management.
  • Conducted a workshop for project management and team leads on regression testing, including for utility software and reporting.
  • Coordinate and provide system admin support for Project Office/technology, requirement, testing, and project management tools.
  • Provided technical, engineering, and project management support and leadership to several aspects of the project.
  • Provided feedback to project management on testing progress, both periodic and as asked on specific issues.
  • Perform Test Project Management including resource capacity / demand models across all work streams.
  • Worked with client and project management to ensure feasible but time bound planning.
  • Developed Test Plans and Test Schedules with Development Leads and Project Management peers.
  • Project Management for this program was a modified Agile approach.
  • Developed testing project management workflow to assist in timing and prioritization of tests.
  • Presented findings to top client and project management on test team reorganization, including TCoE, regression testing and automation.
  • Project Management o Lead a team of 8 technical testers writing Java code to test a network B2B server.
  • Project management for Infosys's engagement with Microsoft 'Solution Accelerator' set of products development and testing.

Show More

3 Project Management Jobs

No jobs at selected location

5. UAT

demand arrow
high Demand
Here's how UAT is used in Test Manager jobs:
  • Observe and evaluate required competencies among employees and communicate solutions and opportunities to management.
  • Designed and coordinated UAT planning, implementation and coordination with Business and end-users.
  • Perform various Project Process evaluations and make recommendations to management.
  • Managed 64 joint Department of Defense (DoD)/NASA/Missile Defense Agency/private industry test and evaluation programs valued at $320M.
  • Identify and manage project issues and risks as it relates to resource constraints, environmental issues, and management situations.
  • Implemented first Project (Brokerage Commissions) as a Test Lead with ZERO UAT defects using Agile Methodology.
  • Completed AC total dose radiation evaluation which resulted in IRIDUM choosing H4C over competing technologies.
  • Experience in documenting & preparing use cases, writing System/UAT plans and system/UAT test cases.
  • Coordinated and socialized UAT, end-to-end testing activities and schedules from project initiation to release.
  • Provide evaluation reports on the results of the test to USMC leadership for decision making.
  • Executed more than 700 operations, 27 position evaluations, and 10k training items.
  • Planned and completed UAT in remote offices with limited staff and minimal supervision.
  • Prepare and direct scheduling and maintain adequate work coverage for 10 technicians.
  • Participated in UAT and interacted with the users to address their issues.
  • Evaluate and purchase automation testing tools and other testing tools.
  • Evaluate and write performance reviews for the test team members.
  • Monitored the System test, IPWT test, schedule and UAT for all CR's.
  • Conduct CRP and UAT sessions.
  • Evaluated team s skillset and recommended automation and performance test and Section 508 training.
  • Led the functional, integration and UAT testing for this and also was involved with it's release management.

Show More

5 UAT Jobs

No jobs at selected location

Job type you want
Full Time
Part Time
Internship
Temporary

6. Business Requirements

demand arrow
high Demand
Here's how Business Requirements is used in Test Manager jobs:
  • Analyzed, tested, and certified application specific software and performed many reviews of business requirements and functional specification documents.
  • Analyzed Business Requirements Document, Use case and system Specification document to develop detailed test scripts.
  • Analyzed business requirements, derived functional and Non-functional requirements, identified the impacted test teams.
  • Reviewed business requirements and functional specifications to build accurate test estimations and resource requirements.
  • Analyzed Business Requirements and understood customer and developed QA/SIT Test Plan using Testing Methodology.
  • Worked with business users to analyze and review business requirements and system functional specifications.
  • Documented business requirements for billing systems, including upgrade and system transition plans.
  • Reviewed Business Requirements and Designed Specifications and provided technical and usability feedback.
  • Gathered and defined business requirements and obtained user sign-off on functional specifications.
  • Developed Test cases based on the technical specifications and business requirements.
  • Analyzed business requirements and business critical areas to define test strategy.
  • Reviewed test scenarios and test cases relative to the business requirements - provide hands-on assistance with tasks as needed.
  • Participated in JAD meetings and gathered business requirements through a variety of techniques such as work sessions and interviews.
  • Reviewed the business requirements and functional specifications, design documents for implementation of OBIEE in HIGLAS.
  • Deliver new and complex high quality QA solutions to clients in response to varying business requirements.
  • Analyzed business requirements and user requirements, prepared test strategy and test cases.
  • Review of setups/configurations, business requirements and workflow scenarios along with user manuals.
  • Analyzed business requirements and other project-related documentation (NFR) to create workload model, test strategies, plans and etc.
  • Reviewed business requirements and functional specification documents Designed and created test cases in QC and test data using MS SQL.
  • Reviewed business requirements and functional specification documents Responsible for SIT and UAT Entry and Exit criteria for deliverables of each sprint.

Show More

7. SQL

demand arrow
high Demand
Here's how SQL is used in Test Manager jobs:
  • Developed complex SQL queries for querying data against different databases for data verification process.
  • Performed extensive database validation and verification for MS SQL Server.
  • Performed Positive and Negative testing using valid and Invalid data on Development, Test Database Environments on SQL and Oracle.
  • Executed and validated SQL stored procedure results as per requirements and design and troubleshoot issues with developers and business.
  • Develop and maintain automation tests on assigned projects using the following tools; QuickTestPro, TOAD, SQL Plus.
  • Verified Microsoft SQL server data versus data on client's AS/400 system and client's website.
  • Utilized Data Grid and Data List to display and manipulation of records from SQL Server.
  • Manipulated Oracle 10g database via SQL in order to test triggers and test data integrity.
  • Defect tracking used Rational Clear case with SQL commands as query language.
  • Worked on SQL Server and Oracle databases for the validating data.
  • Developed SQL Queries and Procedures to perform database testing 8.
  • Use CasesPerformed Data Refreshes for Facility Registry System using PL/SQL.
  • Write SQL to compare and reconcile source and target databases.
  • Analyzed data and pulled reports using SQL for AMWA.
  • Designed and developed SQL queries to perform back-end testing.
  • Create and execute the SQL statements for Testing.
  • Performed backend testing to test the validity of the data in the reports using SQL queries on the database.
  • Experience in Database testing using Teradata SQL Assistant.
  • Organized the testing kick-off meeting Defined the Strategy Execute MS SQL scripts to extract customer data.
  • Involved in infrastructure setup on development and testing environment Environment: iOS / Android / XCode / Eclipse / MySQL

Show More

1 SQL Jobs

No jobs at selected location

8. Test Procedures

demand arrow
high Demand
Here's how Test Procedures is used in Test Manager jobs:
  • Developed and implemented test procedures to verify and validate Engineering designs to customer specifications.
  • Engaged in detailed manufacturing test procedures, and automated test equipment when required.
  • Company's principal engineer for approving certification flight test procedures.
  • Work with various GSE RPS Business users to create standard test documentation (Test plan templates and Test procedures).
  • Coordinated test schedules with the government and contractor engineers, enforced standards for test readiness and executed detailed test procedures.
  • Created test plans and test procedures based on fielding environments to evaluate threshold and objective requirements for hardware and software.
  • Developed and wrote use cases and test procedures using Word, Excel, PVCS, and Test Director.
  • Reviewed quality, operating, and test procedures; instituted updates, and wrote new procedures as necessitated.
  • Reviewed and prepared test procedures for demonstration of required functionality to the Government prior to closure.
  • Developed manufacturing test plan and high level test procedures for system and subsystem checkout.
  • Improved test procedures to align with engineering best practices and improve worker efficiency.
  • Lowered returns 4% in key categories through development of new test procedures.
  • Coordinated Acceptance Test Procedures (ATP) for delivered items and associated plans.
  • Established System Test Plan and test procedures using IEEE Standard.
  • Instituted test procedures, standards and employee performance ratings.
  • Analyzed the test procedures residual log data.
  • Developed test plans and test procedures.
  • Designed and implemented all Novametrix medical device test procedures.
  • Write Software test procedures and scripts for GSE Refinery Planning and Scheduling Add-ons.
  • Managed test development, test procedures generation, and schedule Advanced Special Programs Staff.

Show More

3 Test Procedures Jobs

No jobs at selected location

9. User Acceptance

demand arrow
high Demand
Here's how User Acceptance is used in Test Manager jobs:
  • Facilitated user acceptance testing and test strategies with developers and testers.
  • Coordinated user acceptance testing efforts between SunTrust and Xerox
  • Developed the testing strategy, testing approach and test plan documents for Integrated, End-to-end and User Acceptance testing.
  • Worked with multiple teams to set-up testing environments and resources to support system and user acceptance testing Accomplishments.
  • Plan integration, regression, and user acceptance testing for the front and back-end for mobile applications.
  • Involved in performing functional, application, integration, system, Regression and User acceptance tests.
  • Performed User Acceptance testing (UAT) and made changes using Rational Clear Quest.
  • Assisted business users in defining User Acceptance Testing, test cases and plans.
  • Performed User Acceptance Testing on behalf of End Users at client's environment.
  • Perform integration testing, User acceptance testing and regression testing using the UAT.
  • Lead the team responsible for System Integration Testing and User Acceptance Testing.
  • Organized and executed user acceptance testing (UAT) for multiple applications.
  • Performed Build Verification testing, User interface testing, User Acceptance Testing.
  • Led the final testing phases (end-to-end and user acceptance testing).
  • Define entry and exit criteria for all user acceptance testing.
  • Involved in extensive User acceptance testing of the final product.
  • Developed User Acceptance Testing Processes and Procedures.
  • Project Manager Took over the conversion project at User Acceptance Testing phase.
  • Guide customers through user acceptance by providing UAT scripts , Implemented automated life cycle test tool use across multiple projects.
  • Provided onsite training for User Acceptance Testing and onsite support for UAT.

Show More

10. Windows XP

demand arrow
high Demand
Here's how Windows XP is used in Test Manager jobs:
  • Set all test direction for Windows XP and Windows Server 2003 application compatibility, and Windows XP Application Compatibility technology.
  • Lead team responsible for quality, availability and compatibility of device drivers interacting with Windows 8.1 through Windows XP.
  • Tested 100 stored procedures for the changes.Environment: Microsoft SQL Server, Windows XP.

Show More

11. Defect Management

demand arrow
high Demand
Here's how Defect Management is used in Test Manager jobs:
  • Perform defect management activities and produce test summary reports (daily/weekly/Monthly).
  • Evaluated/drafted effective test case creation, execution and defect management guidelines.
  • Administered defect management including monitoring and reporting.
  • Involved in Defect Management activities.
  • Defect Management through Quality Center.
  • Defect management using Test director.
  • Identify and participate in requirements gatherings of enhancements, bug fixes, testing and defect management during testing cycle.
  • Logged and managed defects using Microsoft Test Manager (MTM) defect management tool.
  • Lead large initiatives including Defect Management for org of >100.
  • Used QC9.2 and QC 10.0 for defect Management and bug tracking.
  • Defect Management - Production test support for data migration.
  • Set up and ran a rigorous defect management system.
  • Defect Management, Defect prevention and Root Cause analysis.
  • Defect Management & follow-up until closure.
  • Defect tracking & defect management.
  • Involved in Defect Management activites.
  • Involved in BRDs, high-level design (HLD), Low-level Design (LLD), defect management, implementation support.
  • Defined the defect management process, and provided a testing matrix for overall testing traceability.
  • Defect management and tracking lessons learnt during the project.
  • Implemented various TCoE processes including Defect Management, TCoE Planning & Strategy, tracking planed and actual efforts on MPP.

Show More

1 Defect Management Jobs

No jobs at selected location

12. Platform

demand arrow
high Demand
Here's how Platform is used in Test Manager jobs:
  • Experience with managing/testing concurrent projects, across multiple platforms with complex architecture and technologies.
  • Managed a 35 member Global Team, leading test projects for HP Flight Operations applications in Agile/SDLC platforms for Airline clients.
  • Migrate JDSU applications and databases from their current x86/Linux/Oracle platforms hosted in an Oracle OOD environment to new POWER/AIX/Oracle platforms.
  • Performed 508 Compliance utilizing Accessibility Management Platform (AMP) and Job Access With Speech (JAWS).
  • Designed Mobile and Digital test strategy documents which enables the customer to handle testing in the modern platform.
  • Tested web, links, buttons and different modules related to mobile web and e-commerce ATG platform.
  • Test Manager for the external certification program for one of Microsoft's leading console gaming platforms.
  • Monitor software test environments, program migration and configuration controls to ensure stable test platforms.
  • Streamlined testing model for the component-based financial BI products built on JAVA EE platform.
  • Work & establish methodology to migrate from current OS XP to Windows 7 platform.
  • Used Sauce labs for selenium and run the tests on the cloud testing platform.
  • Provided test plans & procedures supporting Iridium system cross link TCP/IP communication platform.
  • Used Selenium Grid to run test cases in multiple browsers and Platforms.
  • Manage and Facilitate IT and User Testing on multiple SAP platforms.
  • Planned and coordinated 15 to 20 new development platforms each year.
  • Trained Techs and Analysts on NGS sequencing platform.
  • Performed performance testing for EMM platform using JMeter.
  • Recommended alternative webform platforms to improve time to market and reduce development costs.
  • Tested various gaming platforms (PS3, Xbox, etc.
  • Tested the application platform runtime environment for server side and networking application are written in c++ , Java script and Linux environment..

Show More

2 Platform Jobs

No jobs at selected location

13. QTP

demand arrow
high Demand
Here's how QTP is used in Test Manager jobs:
  • Supervised installation and customization of the HP test tools for the project, including HP QC 10 and QTP 10.
  • Helped in the automation of the test cases from the offshore center who were using QuickTest Professional (QTP).
  • Used Test Director as a test management tool & Quick Test Pro (QTP) for test automation.
  • Defined QTP and ALM guidelines and integrated test runs for transparency to teams for better visibility.
  • Developed and maintained QTP test scripts to support regression testing whenever a Change Request is completed.
  • Led the automation of the test cases, using QuickTest Professional (QTP).
  • Recorded Automated Test Scripts for Functional and Regression Testing of the application using QTP.
  • Performed regression testing using QTP through VB Script and load runner for load testing.
  • Developed and maintained test scripts (WinRunner, QTP, Load Runner).
  • Executed automation scripts using QTP/UFT for regression testing using Key Word Driven framework.
  • Instructed team on use of tools including QTP and mentored various team members.
  • Used QTP to perform regression testing for all modifications and new builds.
  • Managed smoke testing using automation tool QTP out of India office.
  • Generated Test Scripts using QTP for automating Regression and Functionality tests.
  • Created Exception handlers and user-defined functions in QTP.
  • Developed and deployed automates testing scripts using QTP.
  • Develop automation code using QTP.
  • Test tools used were HP QC and QTP.
  • Experienced BPT using QTP/UFT and TFS Experienced Data Migration, data mapping and participated in for EDI and penetration testing.
  • Created processes for traceability and better test coverage in ALM, QTP/UFT and SOAP UI.

Show More

14. Onsite

demand arrow
high Demand
Here's how Onsite is used in Test Manager jobs:
  • Implemented a Data warehouse-ETL based project with a budget of 4M with a Team of 1 onsite and 2 offshore testers.
  • Schedule and attend the regular bi-weekly client call with onsite and offshore teams and discuss the weekly status with the client.
  • Project Coordination- Onsite QA and Off-shore QA team on clarifying the application issues, technical issues and executing.
  • Manage timeliness, quality and productivity of all projects (onsite & offshore) for the customer.
  • Led a fairly large team of twenty five testers, all onsite, and four other leads.
  • Led a team of twenty five testers onsite and forty five testers and leads offshore.
  • Encourage customer to work in onsite / offshore model to reduce effort and cost.
  • Lead a team of ten onsite testers and fifty testers and leads offshore.
  • Cross Functional Coordination, Onsite / Offshore Co - Ordination activities.
  • Ensured smooth implementation by providing onsite support to client in Manila.
  • Lead daily stand up meetings with both onsite and offshore teams.
  • Test Support - On call support with onsite.
  • Manage QA team members both offshore and onsite.
  • Team Size: 3 onsite 10 offshore
  • Coordinate Testing activities with regards to Test team assignments whether onsite/offsite/offshore.
  • Managed Test Leads and a Team of resources at Onsite and Offshore for Pricing Modernization Project and for Insbridge Governance Project.
  • Implemented the project using the onsite/offshore model for configuration, development and testing, working with the system integrator, Infosys.
  • Worked as onsite and offshore Test Manger and was responsible for the delivery of testing projects both performance and functional.
  • Led onsite team in Kronberg, Germany working with the offshore teams at multiple locations in India.
  • Initial placement after joining Infosys for a short project, with only five testers, all onsite.

Show More

15. QC

demand arrow
average Demand
Here's how QC is used in Test Manager jobs:
  • Ensured that quality requirements were defined, agreed on and determined resource requirements to support QC tasks.
  • Analyze and log Test defects in QC, coordinate resolution of defects and providing excellent documentation.
  • Used QC (Test Director) for Test Planning, Test Execution, and Generating Reports.
  • Report of test status and metrics based on testing measures taken directly from HP/ALM or HP/QC.
  • Created Excel macros within QC11 to help Test Managers report their progress in Excel format.
  • Implemented a framework for automating selected module components - using QC (Quality Center).
  • Updated QC with UAT test condition, expected results, actual results and defects.
  • Perform black-box testing including smoke, regression, integration and functional Testing using QC.
  • Prepared low level Test Scripts in MS- Excel and upload into ALM QC.
  • Created QC queries to pull the data from Quality center for Test Reporting.
  • Provide HP QC Project Administration and Configuration of all HP QC Modules.
  • Team is using QC as test repository and reporting tool.
  • Managed and reported defect and script progress using QC.
  • Configure QCN/WPD file per Carrier PRI specification.
  • Project was managed using HP QC.
  • Served in the role of QC Administrator for the FPS Application DETAILED EXPERIENCE SUMMARY
  • Get the test case approved from business Granting access to the team in QC.
  • Project Name: Mphasis Internal Project Environment: Web Application Skill/Tools: QC
  • Test management using QC Review of test scenarios and test cases.
  • Manage QC project, arrange access and generate reports Managing the SIT phase of the project.

Show More

2 QC Jobs

No jobs at selected location

16. Suite

demand arrow
average Demand
Here's how Suite is used in Test Manager jobs:
  • Developed framework for building performance regression test suite for PL/SQL based on instruction count analysis
  • Developed automated test suite for company's best-selling Spectra instant camera electronics.
  • Created regression test suites and load testing scenarios and tracked the results for performance management, besides helping manual testing.
  • Defect analysis for different BU's and writing new test scripts for enhancing regression base suite for base code testing.
  • Review and record all test results for each test suite and provide a high level summary for areas tested.
  • Supervised creation of test suites of QTP scripts and executed from Quality Center for regression testing of the application.
  • Utilize the Rational Test Suite throughout the project while coordinating between US based test sites and India.
  • SIT team was to run regression suite and find if new patch has brought any side defect.
  • Managed multiple simultaneous releases for different suite of products including patch, mini and major releases.
  • Resolve the queries of the team members & provide the review comments on each test suites.
  • Developed, maintained, and even executing performance test suites for various Software applications / products.
  • Revamped the test suites for Sprints and introduced End-to-End, Targeted Regression and Smoke testing.
  • Served as Rational Test suite administrator, including Clear Quest, RFT & RPT.
  • Propose and implement test matrices, test suite and test bed development.
  • Certified in use of Rational Suite 2000.
  • Managed the testing of the configuration and setup for clients being implemented on the Healthways suite of managed care systems.
  • Lead AF operational test analyst for the CV-22EC suite, a $53-billion congressional oversight and multiservice acquisition program.
  • Involved in every aspect of product testing in oracle eBusiness Suite 11i and OTM.
  • Test suites were managed and executed using Mercury's Quality Centre.
  • Create regression suite using data-driven framework using QTP 7.

Show More

17. Unix

demand arrow
average Demand
Here's how Unix is used in Test Manager jobs:
  • Created over 10,000 automated tests to run on four strategic platforms of Windows, AS/400, OS/390 and UNIX.
  • Created the Automation script to do the Test execution for each cycle using SQL script and Unix.
  • Tested and set up software and hardware under Windows, DOS, Unix and Mac.
  • Resolved user issues related to Interface and functional testing using SYBASE, UNIX and JAVA.
  • Experience in testing the Data Feed/File Feed for incoming and outgoing files in UNIX.
  • Developed UNIX shell scripts and executed scripts and validated output.
  • Transferred the files from UNIX to Main Frames environment.
  • Approved test completion for production implementation Environment - Oracle, Unix, Hyperion (canned reports), Quality Centre
  • Worked on STS application which includes technology like Perl, C++, Sybase, Unix.
  • Executed the Informatica Maps both manually and using UNIX Scripts.
  • Execute test scenarios and data validations in SQl, Unix.

Show More

18. ALM

demand arrow
average Demand
Here's how ALM is used in Test Manager jobs:
  • Performed industry software comparison analysis on ALM/PLM.
  • Used HP Application Life Cycle Management (ALM) - Quality Center 11 as tool to keep track of tests cycles.
  • Used to develop Test Plan, Test Strategy, Test Cases, and executed them in test lab (QC/ALM).
  • Assisted Palmetto engineers in drafting system design reviews, as well as Pre-Test and Balance synopsis when requested by customers.
  • Coordinated with Palmetto field technicians and engineers in all necessary work required to achieve Testing and Balancing.
  • Decreased customer-reported defects by almost 50% and guided the testing of scheduled maintenance releases.
  • Clear view is Internal Fannie Mae Reporting tool, which is integrated with ALM.
  • Used Quality Center/ALM to house all test documentation and report/track all issues and defects.
  • Overhauled Test Structure in ALM, created simplified testing methods providing greater visibility.
  • Project ALM audit for other projects for audit readiness and QA best practices.
  • Used ALM to track the testing effort and created the test progress reports.
  • Created Test Cases and Test Scripts documents and documented them on HP ALM.
  • Updated test results to HP ALM repository and generated test reports for formal sign-off
  • Revamped ALM test structures, processes and strategies for obtaining optimal efficiency.
  • Involved in monitoring defects in ALM and track them to closure.
  • Prepared Test reports and Test metrics with the help of QC ALM
  • Utilized HP ALM and Excel templates to create daily KPI reports.
  • Developed many Analysis views from the ALM 11.52 Dashboard module.
  • Raised and Tack the defects in QC/ ALM 11.0 and log the defects.
  • Performed all listed services for the Charlotte, Raleigh and Greenville Palmetto offices Successfully completed in-house AutoCAD training course.

Show More

19. XML

demand arrow
average Demand
Here's how XML is used in Test Manager jobs:
  • Executed testing for EntireX XML Gateway for Mediator, which runs an EntireX XML Mediator sequence document against given XML payload.
  • Executed testing for EntireX XML Gateways for Basic, which includes File System (FS), Program and Socket Gateways.
  • Test Data is created using scripts that access an XML Harness where data is then sent to service layer for validation.
  • Performed multiple duties including XML Development, creation of test cases, testing and validation for new releases and updates.
  • Experienced in verifying and validating XML request and response files from the third party service provider using SOAP UI.
  • Initiated and coordinated code reviews for both the SGML-based (Perl) and XML-based (Java) tool sets.
  • Verified the file/data transformation from Flat File to XML to EDI for transmission to the Distribution Energy Company.
  • Involved in testing both SOAP and REST services using Rest Assured and tested both XML and JSON formats.
  • Installed and configured EntireX XML Gateways on JBOSS and WebLogic Servers in Windows and UNIX environment.
  • Created XML billing input files for the expected products in UNIX environment.
  • Helped develop Federal Geographic Data Committee website using XML.
  • Performed validation on the XML format billing input file.
  • Developed lucid custom logging using XML + XSLT.
  • Used LINQ to extract and process XML Data.
  • Rated & billed the XML files.
  • Performed services testing with SOAP UI by validating request and response for XML, JSon files.
  • Tested integrated software (Web Services (SOAP and REST), and messages Validated XML Files.
  • Involved in Integration testing for IR, GBS, MRP and FRP, Infopoint XML, Informatica and TLM.
  • Tested Pega XML, SOAP, MQ, Clipboard, Harness, Preflight, , PAL etc.

Show More

20. Scrum

demand arrow
average Demand
Here's how Scrum is used in Test Manager jobs:
  • Collaborate with application development project managers and Scrum masters on task milestones and schedules for critical path analysis.
  • Participated in daily Scrum meetings with Business and Developers.
  • Participated in Daily scrum meetings, sprint planning, sprint review, and sprint retrospective as QA representative.
  • Created and presented an Agile Testing talk for the Engineering Excellence organization after our first release using SCRUM.
  • Worked as a Scrum Master and involved in the handling Scrum Processes on the project level.
  • Facilitate, monitor, and guide sprint planning, scrum activities, and user story acceptance.
  • Included iterative releases of website development and content and use of Agile Scrum style development methodologies.
  • Communicate with clients in major markets regarding the status of testing in Agile/Scrum methodology.
  • Run as scrum master, create and assign the tasks to each team member.
  • Worked on both the Waterfall and Agile (Scrum) Methodologies based projects.
  • Participate and perform the role of scrum master during Agile testing methodology.
  • Prepared and attended requirements scrums, internal to the test team.
  • Followed scrum in agile methodology for the entire project.
  • Followed Agile Methodology for releases with 4 weeks scrums.
  • Attend Scrum and Scrum of Scrum Meetings.
  • Utilized Agile and Scrum methodologies preparing releases.
  • Team coach for scrum implementation.
  • Work with Product Owners, SME's and Scrum masters to create.
  • Work closely with Scrum/Project Manager to ensure timely delivery of deliverables.
  • Attend SCRUM meetings and having best practices of AGILE Methodologies Peer-to-peer code review and unit testing.

Show More

21. HP Quality

demand arrow
average Demand
Here's how HP Quality is used in Test Manager jobs:
  • Conducted training on HP Quality Center 9.2 or the project team; developed job aids for creating scripts within Quality Center.
  • Created Dashboards using HP Quality Center to provide real-time analysis of the project's health to staff and management.
  • Administered the test management tool HP Quality Center and maintained all test scripts and test execution within the tool.
  • Peer reviewing the QA Test Cases/Scenario and verifying identified defects through defect tracking tool 'HP Quality Center'.
  • Fixed an improper setup of HP Quality Center and instituted a defined SDLC process utilizing Quality Center.
  • Managed the implementation of HP Quality Center as primary test management tool for HIGLAS project.
  • Create and communicate the defect Management process to be utilized in HP Quality Center.
  • Configured and then executed the integration of Solution Manager and HP Quality Center.
  • Defined the testing tools and best practices (HP Quality Center).
  • Utilized HP Quality Center to document defects and run necessary metrics reports.
  • Created test script templates to upload them in to HP Quality Center.
  • Manage the Uploads of Test Cases and Scenarios into HP Quality Center.
  • Tracked activities using Microsoft Project and HP Quality Center 10.
  • Test Management and defect tracking using HP Quality Center.
  • Used HP Quality Center for bug tracking.
  • Utilized HP Quality Center 10.00.
  • Hibernate, HP quality center, QTP, Agile.
  • Coordinated the development of test scenarios and supervised the upload to HP Quality Center.
  • Managed the defects using HP Quality Center Generate QC reports.
  • Reviewed business requirements and functional specification documents Creation of Test Cases in HP Quality Centre (ALM).

Show More

22. Sharepoint

demand arrow
average Demand
Here's how Sharepoint is used in Test Manager jobs:
  • Engineered testing processes utilizing SharePoint initiatives which were adopted for future testing efforts throughout the company.
  • Experience with SharePoint Document Management and Enterprise Search capabilities.
  • Managed, documented and controlled all the Requirements, Test cases, Test scripts and Test results using SharePoint.
  • Assisted in teaching others in First Air Force how to use SharePoint within their infrastructure.
  • Track and update the progress of the project documents in SharePoint and manage the metrics.
  • Project's SharePoint creation and test result report preparation and initiating sign-off process.
  • Managed defect reporting and tracking through the SharePoint for all phases of Testing.
  • Project Summary:Migrate applications from Lotus Notes applications to SharePoint.
  • Managed SharePoint site that contained test team documents and media files.
  • Maintained and created the SharePoint web pages for DSL business unit.
  • Involved in site creation on SharePoint and User administration.
  • Managed all the documents on SharePoint and Shared drives.
  • Deploy SharePoint package to Test Environment.
  • Transitioned test and defect management from SharePoint/Excel to ServiceNow resulting in increased efficiency and reusability.
  • Experience in debugging tool Charles debugger, used J-miter and Junite for unit testing, and SharePoint server.
  • Served as the North Dakota SharePoint, RequistePro, and Clearquest Test Manager and Rational Manual Tester Administrator.
  • Managed all testing documentation using Sharepoint making updates as needed through the internal change control process.
  • Identified tools, resources, deliverables, documentation for multiple projects Developed & Configured SharePoint 2007 solution.

Show More

23. Mainframe

demand arrow
average Demand
Here's how Mainframe is used in Test Manager jobs:
  • Developed new tools for aiding test execution in Mainframe environment thereby contributed to the process improvement.
  • Designed and developed QTP Hybrid Frame Work for flex, java, mainframe, power builder applications.
  • Set up SQA tool to capture/replay from the mainframe now fully automated on CICS/TSO system.
  • Ensured the data in the front end of IRIS is updated accurately in Mainframes database.
  • Established test environments for mainframe applications in Y2K testing and conducted regression testing.
  • Set up JCL environment and utilized COBOL on IMB mainframe.
  • Managed Mainframe testing activities for a group of 6 testers.
  • Performed the validation on the Mainframes Output files produced.
  • Performed Job set up for the Mainframe Batch jobs.
  • Managed test environments in an IBM Mainframe environment.
  • Designed and developed enterprise application integration (EAI) components used to connect webTA to several mainframe applications.
  • HIT replaces the core Health Insurance administration system that runs on the ageing Fujitsu mainframe system.
  • Unclaimed Property Compliance System (.NET architected) and APECS Mainframe.
  • Project encompassed replacing a mainframe legacy system with 'Varicent' a Wed based Incentive Compensation Management software package.
  • NET framework, SQL server and Mainframe applications Project Doral provides high quality oral healthcare through expert government dental plan administration.
  • Used RFT to automate different application like Mainframe, Java and .Net Based applications.

Show More

24. Traceability Matrix

demand arrow
average Demand
Here's how Traceability Matrix is used in Test Manager jobs:
  • Reviewed and analyzed system requirements, developed the requirement traceability matrix, identified assumption and risks.
  • Managed the development of testing documents and Requirements Traceability Matrix for several projects.
  • Create and Publish Requirement Traceability Matrix.
  • Developed and maintained the traceability matrix.
  • Designed and maintained Traceability matrix.
  • Managed Release Cycle testing setup, requirements gathering, test case uploads and development of a requirement traceability matrix.
  • Developed testing strategy for IPM project & created requirement traceability matrix, created test estimates and testing project plan.
  • Analyzed Product Backlog, Sprint backlog & Story and generated Traceability Matrix, Test Plans and Test Scripts accordingly.
  • Prepared, reviewed test planning documents - test plan, test cases and requirement traceability matrix documents.
  • Documented the Traceability Matrix linking the Requirements to test cases to ensure everything is tested.
  • Create Traceability Matrix and Test Metrics in QC and maintain Defect Life Cycle.
  • Facilitated the use of Solution Manager for requirements traceability matrix with HP ALM.
  • Maintained Test Execution Log, Test Planning Log and Traceability Matrix.
  • Ensured all testers created traceability matrix from requirements to test scripts.
  • Maintained the Traceability Matrix between the Requirements and Test cases.
  • Constructed the Requirements Traceability Matrix documented based on SSDM S2101.
  • Created Traceability Matrix (RTM) for Requirement coverage.
  • Prepare the Requirements Traceability Matrix using requirements elicitation and analysis tools and techniques including traceability techniques.
  • Developed and maintained a requirements traceability matrix.
  • Test Case, Execution, Defect Mgmt, Traceability Matrix).

Show More

2 Traceability Matrix Jobs

No jobs at selected location

25. Sdlc

demand arrow
average Demand
Here's how Sdlc is used in Test Manager jobs:
  • Implement and monitor SDLC (Waterfall/Agile Methodology) Compliance, Change Control, Issue and Risk Management and Client Satisfaction.
  • Led the task of introducing best practices by analyzing DOL SDLC Methodology and by ensuring proper adherence.
  • Reviewed, finalized and approved (signed the documents electronically in MSB) all SDLC Testing documentation.
  • Implement process improvement methodologies across SDLC in defect reduction, testing/QA standards, and applying best-practices.
  • Establish LOE of each phase of SDLC and prioritized QA task to facilitate Project Management.
  • Designed the business requirement collection approach based on the project scope and SDLC Methodology.
  • Advocated Release/Change Management processes adhere to SDLC, Agile frameworks and SLA s..
  • Experienced in SDLC (Classical, Agile and Incremental) and STLC Methodologies.
  • Created Test Orientation plan and test strategy for Agile SDLC based projects.
  • Work with the project manager to build the SDLC test schedule.
  • Worked in Agile Scrum model and followed SDLC delivery process.
  • Sound Knowledge in SDLC and STLC process.
  • Trained QA staff on the SDLC.
  • Coordinate and update the test schedule throughout the SDLC with the project manager for all testing tasks and deliverables.
  • Managed the entire SDLC for the 2011 Appropriate Access Recertification project; this includes approximately 100 applications.
  • Participate in and lead workgroups in reviewing, modifying and creating processes and directives for the SDLC.
  • Review and modify existing Software Development Lifecycle (SDLC) process for the entire project.
  • Created templates for all aspects of testing throughtout the SDLC.
  • Deliver all required E2E test deliverables as per SDLC2.0 standard.
  • Reviewed test objective matrices and test cases Developed processes to accommodate CBA SDLC and the IBM Test Methodology

Show More

1 Sdlc Jobs

No jobs at selected location

26. Soap User Interface

demand arrow
average Demand

27. System Integration

demand arrow
average Demand
Here's how System Integration is used in Test Manager jobs:
  • Test Manager * I coordinated functional activities of system integration testers participating on cross-functional teams for specific Product Development efforts.
  • Executed 3 releases simultaneously in Colorado and California as well as a major Kaiser system integration completed ahead of schedule.
  • Facilitate System Integration and UA testing efforts including Data allocation.
  • Performed a large-scale system integration annually.
  • Manage and monitor the testing progress during system integration test (SIT) cycles; request overtime as needed for testers.
  • Managed all system integration testing by Systems Engineering, Integration, and Systems Test teams on RequisitePro and ClearQuest test environments.
  • Followed the EDS Enterprise Testing Methodology to deliver testing services for System and System Integration testing.
  • Reviewed and assisted the team members in creating 1200 test cases for System Integration Testing.
  • Functioned as the Test Manager for the System Integration Test and the Customer Acceptance Test.
  • Implemented System Integration Test, Warm Body Test, Regression Test and Exploratory Test practices.
  • Delivered complete test data solution required for Regression and System Integration testing (SIT).
  • Received training on all facets of cable and system integration testing for this project.
  • Create and review test cases and performing system integration testing and support UAT.
  • Managed end to end System Integration and delivery to UAT.
  • Provide support to Development & System Integration teams.
  • ACE ID for System integration (SIT) and Customer Acceptance test (CAT) phases.
  • Involved in System Integration Testing with external/Internal interface and understood overall customer business functionalities.
  • Coordinated all test planning activities (data prep, system integration, Multi Generation Process Plan test scope).
  • Plan and schedule System Integration and System tests ensuring complete traceability for product and system design requirements.
  • Provided satellite communication system integration and testing solutions from C band through Ka band.

Show More

2 System Integration Jobs

No jobs at selected location

28. Jira

demand arrow
average Demand
Here's how Jira is used in Test Manager jobs:
  • Supported JIRA for bi-directional requirements mapping and Defects.
  • Synchronized requirements as JIRA issues were assigned to the lead developer to track development LOE and resolve any impediments.
  • Communicated bugs and defects to the developer and track all defects and bugs utilizing JIRA.
  • Captured and analyzed all defects during test phases and document JIRA bugs or improvements.
  • Coordinated with developers and record defects in JIRA to track until they are resolved.
  • Generated test logs and submitted bug directly to JIRA.
  • Created user stories and use cases in JIRA.
  • Managed and tracked defects using JIRA.
  • Resolved problem tickets using JIRA.
  • Log the defects in JIRA.
  • Test Execution and Maintenance* Extensive experience in Bug tracking tools Quality Center and,JIRA* Provide comprehensive release assessments and quality sign-off
  • Create and enforce defect lifecycle process and oversee defect tracking (JIRA), management and reporting of found defects.
  • Work as a Jira admin assign new user to project delete user and Create Project.
  • Used JIRA for bug tracking, SVN for version control and Confluence for doc sharing.
  • Planned and managed test resources Managed creation and resolution of test bugs in JIRA
  • Created each tasks for each story and update the status in Jira.
  • Used Jira for Bug tracking, Charles for debugging and Reporting defects.
  • Reported issues in Jira (bug tracking system).
  • Test Summary Report Preparation Environment: .Net, MQ Series, Oracle, UNIX, IBM AIX, IBM RFT and JIRA
  • Experienced with Agile software engineering methodologies Accomplishments Started using Jira board for daily stand up with both QA and Dev teams.

Show More

29. Selenium Webdriver

demand arrow
average Demand
Here's how Selenium Webdriver is used in Test Manager jobs:
  • Automated the Web Applications using Selenium WebDriver for regression testing.
  • Designed and developed selenium WebDriver programs with Java.
  • Integrate selenium WebDriver framework with Jenkins.
  • Implemented automation testing using Selenium WebDriver, JAVA.
  • Project: Market Place Roles & Responsibilities: Create framework for Best buy OLS, using selenium WebDriver.
  • Involved in designing of Automation Test cases using Selenium WebDriver, Java, Junit, Maven.
  • Educated team members on test automation with Selenium WebDriver using C# and Nunit.
  • Implemented automation using Selenium WebDriver, JAVA, Selenium Junit, Maven.

Show More

2 Selenium Webdriver Jobs

No jobs at selected location

30. Defect Triage

demand arrow
low Demand
Here's how Defect Triage is used in Test Manager jobs:
  • Organized Defect Triage Meetings with respective Stakeholders.
  • Instituted formal test cycle and process, including defect triage and test executions, which reduced errors and improved product quality.
  • Directed the daily testing and defect triage daily meeting to address defect fixes and negotiate project delivery dates with various stakeholders.
  • Led defect triage meetings and prioritized defects to ensure test cases were defined to test any defects during the retest phases.
  • Hosted / Participated in status communication including status meetings, executive status reporting, Defect triage meeting and audits.
  • Facilitated Defect Triage meeting with client and development teams' intern achieved defect closure and prioritizing defects.
  • Created the defect triage spreadsheets, project testing metrics and shared the same with the client.
  • Participated in defect triage meetings and reviewed open defects and coordinated with stake holders.
  • Facilitated all defect triage meetings, tracking and reporting from MS Team Foundation application.
  • Coordinated and involved in Defect Triage Meeting with Development and UAT business team.
  • Prioritized the defects found in testing using Defect Triage Meeting.
  • Represent QA team in the defect triage meeting.
  • Schedule and Host Defect Triage meetings daily.
  • Conduct Defect Triage meeting 2.
  • Facilitate daily Defect Triage meetings.
  • Defect prioritization and assignment for testing - Attending defect triage calls with end client in UAT and Model office testing.
  • Scheduled & Chaired defect triage meetings to ensure the defects are triaged and fixed with a minimum turnaround time.
  • Facilitated and conducted requirements workshops, defect triage calls and scope meeting with client stakeholders and onsite team.
  • Co-ordinated the defect triage and issue resolutions meetings with the interfacing teams.
  • Defect triage * Weekly report generation.

Show More

31. DB2

demand arrow
low Demand
Here's how DB2 is used in Test Manager jobs:
  • Project team used automated system testing tools to test health and life insurance mainframe including DB2 and client server applications.
  • Created test scripts to validate the source to target transformation using databases like DB2 and Microsoft SQL server.
  • Write complex SQL queries on DB2 over Mainframe to generate the raw data reports for analysis.
  • Coordinated planning and execution for large-scale $6M DB2 migration from Virginia to Colorado.
  • Modify and test COBOL/DB2 programs & corresponding JCL components as per the requirements.
  • Coded CICS screens and batch programs using SQL queries against DB2 tables.
  • Maintained existing CICS/DB2 and batch SQL software applications.
  • Browsed the DB2/IMS to verify database updates.
  • Train the new resources on Selenium, LISA automation, IBM DB2 Client and SOAP UI.
  • Created requirements and Test Cases in PACBASE Coded and unit tested changes in PACBASE utilizing IMS & DB2 SQL.
  • Web architecture consisted of IBM Websphere Java, Enterpise Java Beans, Oracle 8, DB2, Sun Solaris Unix.

Show More

32. ETL

demand arrow
low Demand
Here's how ETL is used in Test Manager jobs:
  • Have 4+ Year of experience on ETL Testing for RJIL, Tapestry and J D Edwards Enterprise and other projects.
  • Key contributor to the approach for MetLife FTE roles and responsibilities in support of the outcome based mode.
  • Transition lead for MetLife, worked with new vendor to ensure they matched the needs of the projects.
  • Created the project plans and test strategies for all the ETL testing and report testing projects.
  • Developed ETL test scripts based on technical specifications/Data design documents and Source to Target mappings.
  • Perform back-end testing of ETL and b/w the source and target using SQL queries.
  • Developed testing approach and procedure for new ETL application.
  • Cultivated relationships across approval agencies, including UL, CSA, ETL, CE, IEC, and TUV.
  • Performed End to End testing, which included verifying ETL workflows, OFSAA batch jobs and values on OBIEE report.
  • Involved in creation and reviews of test data, test scripts and procedures for testing multiple ETLs and databases.
  • Created and maintained the Traceability Matrix tracing the requirements, test cases and ETL maps.
  • Defined technical best practices for testing large scale ETL migration from Mainframe to Siebel.
  • Performed ETL Testing by using Informatica Power Center 9 and Data Stage 8.7.
  • Work within an Agile SCRUM methodology Create test strategy for ETL application.
  • Involved in writing SQL Queries for backend/ETL testing.
  • Test Environment: ETL, Cognos, Business Intelligence, DataWarehousing, TOAD, Databases (Teradata, Oracle, DB2)
  • Project includes prioritized enhancements for Middleware, Fircosoft ETL and the GSM Application.

Show More

1 ETL Jobs

No jobs at selected location

33. E2E

demand arrow
low Demand
Here's how E2E is used in Test Manager jobs:
  • Defect management and issue resolution processes during E2E execution.
  • Performed E2E Test management in business transformation of Meridian capabilities into WCR system called Wire Checks and Remittance within EMEA Market.
  • Designed and developed E2E Test Plan, Test Execution Plan and created major portion of test cases for AMS system.
  • Involved in System Integration testing with external & internal interface team and performed E2E Testing.
  • Prepared E2E Test Plan, E2E Test strategy, Test Scenarios and Test Cases.
  • Test Scenario / Requirement reviews with Business SME's E2E Testing Strategy, Prioritization
  • Created and updated the E2E Management Plan, Risk analysis and mitigation plans.
  • Participate with E2E Business discussion to define acceptance criteria for user story.
  • Managed all phase of testing for functional testing to E2E testing.
  • Performed requirement risk assessment and take necessary actions with E2E teams.
  • Participate with E2E Business discussion to define a good requirement.
  • Focus in Integration, E2E and UAT Testing phases.
  • Worked with integrated teams to prepare Integration/E2E test plan.
  • Validated OTL E2E Plans for any incomplete scenarios.
  • Test Management: Lead QA project for testing the new business process of Distribution/Logistic/Supply Chain/Inventory/Merchandise as an E2E test manager.
  • Conducted production testing kick-off meeting Executed Test scenarios E2E and logged defects under Defect Module in ALM QC.
  • Major responsibilities included the following: Planning, coordinating and managing the overall Enterprise E2E test effort.
  • Managed E2E testing for Salesforce Application projects.
  • Test Strategy and Planning for the SIT and E2E for the P-8 project.

Show More

34. Waterfall

demand arrow
low Demand
Here's how Waterfall is used in Test Manager jobs:
  • Participated in the agile development methodology, iteration and agile release process and Waterfall.
  • Incorporated Agile testing methods within a reverse engineering and waterfall methodology.
  • Project is developed using waterfall methodology.
  • Established Agile Scrum and improved waterfall, SDLC standards to the process resulted in shorter development cycles to fulfill business requirements.
  • Led Waterfall to Agile transformation, allowing for timelier testing of issues and more accurate estimates.
  • Trained testing staff in waterfall based testing activities to support full test coverage.
  • Experience with Waterfall, Iterative, and Agile Project Life Cycle approaches.
  • Managed projects and testing using both Agile and Waterfall.
  • Experienced to work in both Waterfall and Agile projects.
  • Experienced IT project lead in Agile and Waterfall methodologies.

Show More

35. Html

demand arrow
low Demand
Here's how Html is used in Test Manager jobs:
  • Developed front-end GUI screens using HTML, JSP and CSS.
  • Developed test automation scripts in C#, SQL, ASP, javascript against a HTML framework running on .NET environment.
  • Developed test applications for SDK APIs using vbscript, javascript, XML, HTML, VB and C++.

Show More

36. CRM

demand arrow
low Demand
Here's how CRM is used in Test Manager jobs:
  • Provided test and evaluation of Customer Relationship Management (CRM), Business Intelligence, and custom solutions.
  • Tested the SAP CRM application on CRM 2007 sales order process and marketing.
  • Experienced on Sales force, CRM and Google play, Google Analytics, and Google purchase and payment Gateway applications.
  • Used Analysis tool to Analyze CRM and Omx Applications various Business Transactions Response Time using Load Runner.
  • Involved in QA activities, and test execution on Salesforce CRM application.
  • Core Business App - SAP CRM) * Setup customize and administer HP tools.

Show More

37. J2Ee

demand arrow
low Demand
Here's how J2Ee is used in Test Manager jobs:
  • Sun Technologies J2EE (Java, EJB, Servlets, JSP, JDBC, JMS, JSF, JNDI, RMI)
  • Performed front-end J2EE GUI, which utilized Weblogic as the middleware.

Show More

38. Load Runner

demand arrow
low Demand
Here's how Load Runner is used in Test Manager jobs:
  • Created and executed scenarios in Load Runner/JMETER to analyze system performance in Load Runner Analyzer under load.
  • Lead the performance testing of Oracle policy Admin Server using Load Runner (11.52V).
  • Test Design and Scripting in Perl, VuGen and C using Load Runner.
  • Design the Quick Test Professional and Load Runner scripts.
  • Analyzed the results using Load Runner Analysis.
  • Involved in designing the automation test scripts using QTP Conducted performance tests using Load runner.
  • Test Environment & Tools: QTP, Load Runner, .Net, SQL, Quality Center, and Visio.

Show More

39. Test Leads

demand arrow
low Demand
Here's how Test Leads is used in Test Manager jobs:
  • Directed test team actions, organized and re-planned test events based on real-time impacts, and mentored junior test leads.
  • Answer any Question/Queries of Client Test Leads on task done by offshore and provide on time solution and clarifications.
  • Adhere to internal testing methodologies including coaching of test leads of testing process used by the firms test team.
  • Line management of a team of 26 resources which includes Environment Managers, Test Leads and Test Analysts.
  • Have assessment sessions / meetings with client QA & Test Managers / Project Managers and test leads.
  • Set standards and processes that team of Test leads and team members would use across projects.
  • Work with the development leads or test leads from the project to understand Formal Integration Test.
  • Managed 9 testers and test leads and multiple projects, including schedules and resource assignments.
  • Provide test planning and execution oversight and direction of the test leads and test team.
  • Hired, managed and grew testers and Test Leads, in Redmond and India.
  • Manage team of 6 Test Leads and coordinate with other project development teams.
  • Assessed employee performance and provided performance reviews for test leads and core testers.
  • Act as the single point of contact between Development and Test Leads.
  • Provided constructive feedback while working with Test Leads/Vendors on documentation and process.
  • Managed a testing team of 12 on-shore testers and test leads
  • Managed 4 Test Leads and 10 outsourced resources.
  • Review various reports prepared by Test Leads.
  • Team size grew to 20+ testers and 3 Test Leads.
  • Gather Test Environment & Data Requirements, review with Test Leads and Testing Enablement.
  • Review with Test Leads and Testing Enablement Leads.

Show More

40. Toad

demand arrow
low Demand
Here's how Toad is used in Test Manager jobs:
  • Created and executed complex SQL queries to the Oracle Database to validate and test data using TOAD.
  • Executed complex SQL queries to the Oracle Database using TOAD to validate the billing output.
  • Used Oracle Toad and Mercury quality Center extensively for this effort.
  • Clear Commerce, Glue STC Seebeyond/Egate, SAP, Oracle 8I, SQL, Toad.

Show More

41. Agile Methodology

demand arrow
low Demand
Here's how Agile Methodology is used in Test Manager jobs:
  • Developed an agile methodology to meet key business initiatives for new, highly attractive package travel initiatives.
  • Supported for Production testing and new enhancements testing using Agile methodology.
  • Developed end to end testing strategy adhering to Agile methodology.
  • Analyzed user stories (Agile Methodology Requirements Documents), identified and corrected the test scenarios & Test Cases.
  • Project was executed in agile methodology - Sprint planning and execution.
  • Used Agile Methodology for development phase (Scrums and Iterations).
  • Follow Agile methodology (Scrum) and attend daily scrum meetings.
  • Led testing effort in use of Agile methodology.
  • Implement agile methodology techniques across QT.
  • Streamlined the process and overall quality of the deliverables by introducing agile methodology.
  • Followed Agile Methodology for releases and managing the Test document deliverables to the client.

Show More

4 Agile Methodology Jobs

No jobs at selected location

42. TFS

demand arrow
low Demand
Here's how TFS is used in Test Manager jobs:
  • Created and managed the testing tasks for a user story in Team Foundation System (TFS) 3.
  • Document all defects and follow up in the tracking system; Team Foundation System (TFS).
  • Create, maintain and execute test cases, use cases and Tasks in TFS/Test Manager.
  • Trained and coached staff on the use of TFS for test planning and defect processing.
  • Utilized Microsoft TFS for user story, test case and bug management.
  • Test Plan and Test Lab set up in Microsoft TFS.
  • Tracked defect in TFS (Team Foundation Server).
  • Find, Monitor & track product issues using MTM and TFS.

Show More

43. Linux

demand arrow
low Demand
Here's how Linux is used in Test Manager jobs:
  • Used assembly language C, customized operating system environments based on Linux/Unix.
  • Configured custom Redhat Linux environments to facilitate test of custom hardware.
  • automated and manual testing in Unix/Linux environment.
  • Coordinate and Validate customer projects ( M-Validation and Linux Scripts test) or problem during the customer project-progress.
  • Tested in Linux Environment All the defects is logged using Quality Center.
  • Test Manager for the wireless platform Smartscreens / Smartskins, a Linux based platform for wireless devices.

Show More

1 Linux Jobs

No jobs at selected location

44. Process Improvement

demand arrow
low Demand
Here's how Process Improvement is used in Test Manager jobs:
  • Have been particularly focused on departmental process improvements and implementation of a new version of the corporate test case repository software.
  • Process improvement initiatives towards improving project parameters such as productivity, quality and profitability on continuous basis.
  • Lead process improvement activities to identify and resolve quality related issues across organizational boundaries.
  • Identified opportunities for business process improvement and initiate efforts to make improvements.
  • Recommended process improvements, test methodology improvements, and automated test tools.
  • Organized post-project reviews or lessons-learned sessions of testing and recommending process improvements.
  • Facilitated process improvement Performance Testing, Performance Analysis and Capacity Planning.
  • Attained process improvements and Documenting lessons learned after each release.
  • Recommended and implemented key process improvements for the department.
  • Introduced continuous process improvements e.g.
  • Developed and implemented process improvement plan using six sigma tools that reduced environmental certification test from 60 days to 28 days.
  • Developed innovative Defect scrub process, along with numerous SEPI's (Software Engineering Process Improvements).
  • Interfaced with management on budgets, estimates, test progress, risks and process improvements.
  • Provided test project status, resolving test issues, test process improvement feedback.
  • Minimized the number of defects and bugs found in production through process improvements.
  • Lead Testing teams in process improvements within the Business Solution test area.
  • Defect Acceptance Rate, Process improvement lead for CPT space.
  • Used CMMI to guide process improvement across the project.
  • Conduct root-cause analysis to determine process improvement opportunities.
  • Implemented process improvements including daily metrics reporting to the Healtways Project Managers, Schedule planning, defect resolution process.

Show More

1 Process Improvement Jobs

No jobs at selected location

45. UK

demand arrow
low Demand
Here's how UK is used in Test Manager jobs:
  • Provided timely communications to the leadership of Morgan Stanley and development and user groups in the U.S. and UK.
  • Participated in Global Field Test Lead seminars in Finland, UK, Denmark, Germany, and China.
  • Provided end-to-end management and coordination of the US and UK test planning efforts.
  • Co-chaired all planning meetings with UK TLAM IPT.
  • brand Company Profile Tesco HSC is the India Operation center of Tesco UK.

Show More

46. Test Tools

demand arrow
low Demand
Here's how Test Tools is used in Test Manager jobs:
  • Utilized Mercury automated test tools for performance and regression testing.
  • Utilize manual/automated test tools for efficient test coverage.
  • Led the QC process by managing a professional staff, creating technical test plans and scripts and developing automated test tools.
  • Worked extensively with Web Testing using a variety of test tools such as LoadRunner, SQA Robot, Test Manager etc.
  • Researched and instantiated new web and test tools / technologies that streamlined testing, group coordination, and release management.
  • Use of automated test tools and processes were a priority as equipment and people resources were minimal.
  • Implemented WinRunner and LoadRunner automated test tools to speed up results and allow for load testing.
  • Attended various meetings on NFR resolution, usability, integrated test environments, test tools etc.
  • Supervised team of 4 test engineers responsible for implementation of automated test tools and strategies.
  • TEST TOOLS: Quality Center 9.0, QuickTest Professional 9.2, LoadRunner 8.0
  • Managed test tools, processes and monitored work of testing teams.
  • TEST TOOLS: Mercury Interactive TestDirector, WinRunner, AQT and LoadRunner
  • Initiated and led development of in-house system and component test tools.
  • TEST TOOLS: WinRunner, LoadRunner, TestDirector, QuickTest Professional
  • Lead the execution of Test Scripts using automated test tools.
  • Evaluate and deploy new test tools.
  • Provided Performance Test tools assessments.
  • Managed test team utilizing Mercury/HP test tools completing all test phases and giving production a error proof product for utilization.
  • Iused various automated test tools to aid in test case and report generation.

Show More

5 Test Tools Jobs

No jobs at selected location

47. PMO

demand arrow
low Demand
Here's how PMO is used in Test Manager jobs:
  • Work with cross-functional teams such as Development, PMO, Management, QA, Release, BSA for project deliveries.
  • Implemented qualitative process steps to programs in order to meet PMO Governance and required finance components were SOX compliant.
  • Participated in bug review meetings to explain and prioritize issues with PMO, Development and Product Managers.
  • Target users of this application are GCS (Global Customer Solutions) Custom Pricing and PMO teams.
  • Managed several project managers and followed PMO Project Management process guidelines to support the PMO governance model.
  • Incorporated Motorola's PMO processes into personal best practices, improving productivity for entire team.
  • Defect management and reporting, communicating defects to PMO and other stakeholders upon request.
  • Assisted the PMO to integrate the program with the overall project plan.
  • Managed PMO activities such as resourcing, billing and revenue reconciliation.
  • Share the UAT deliverable status to PMO/business/stake holders on daily basis.
  • Worked in a Project Management Office (PMO).
  • Developed or adhered to schedule set by PMO.
  • Implemented test department of PMO Implementation.
  • Key team member in developing cutover and release management strategy for PMO group.
  • Project Status Reporting to all stakeholders and PMOs.

Show More

48. C #

demand arrow
low Demand

49. HR

demand arrow
low Demand
Here's how HR is used in Test Manager jobs:
  • Controlled the releases depending upon accomplishments reached through automation and manual testing.
  • Collected the information through interviews and meetings with Operations & Business teams of UBS and drafted Business specifications and System requirements.
  • Assigned information technology projects throughout the system development life cycle including: analysis, design, coding, testing and implementation.
  • Assisted in the implementation of QA processes to ensure correctness of data flowing through each stage of ETL process.
  • Improved quality of test cases through development of test case standards and review with technical architects and development team.
  • Create training department resulting in design and development of twelve company training programs in under three years.
  • Performed all non-management QA and testing tasks, throughout the IWS team of Northern Trust.
  • Reduced heavy product test budget 40% through optimizing test routes and test customer selection.
  • Managed a team of 22 field test engineers spread between three geographically separated locations.
  • Managed four teams, each having about three to five QA professionals.
  • Managed all technical and process improvement activities within departments from inception thru implementation and closeout.
  • Participate in reviewing requirements, attending design/development, walkthroughs and reviews.
  • Lead Test case walkthrough meetings and assist the QDA to answer any questions which come up related to the test cases
  • Facilitated implementation of on-going shared service operations and initiatives throughout North America, India, Australia, and Japan.
  • Conducted project walkthroughs and meetings involving various leads from Development, QA and Technical Support teams.
  • Schedule weekly Reston conference call to discuss general issues and keep team synchronized with main office.
  • Lead Scenario Walkthrough Meetings to Freeze the Final Scenarios which are to be tested.
  • Worked hands on with complete NGS workflow from library prep through analysis.
  • Participate in Leadership team meetings, project status meetings and walkthroughs.
  • Organized Walkthroughs and Inspections with my team members and reviewed the status of the application Analyzed the Functional requirements.

Show More

6 HR Jobs

No jobs at selected location

50. GUI

demand arrow
low Demand
Here's how GUI is used in Test Manager jobs:
  • Worked extensively on testing manually the GUI and client/server functionality.
  • Provided guidance about exceptions and assumptions while developing estimates.
  • Designed, and implemented a suite of performance tests for the GUI and batch processes for Fannie Mae's TRAX system.
  • Provide necessary guidance to vendor resources on Requirements Management and Testing procedure to ensure compliance with the firm standards.
  • Work closely with offshore teams to resolve queries, issues, monitor progress and guide the project team.
  • Performed Manual Testing and localization testing (as part of data validation) for testing functionality and GUI.
  • Guided interviews with Subject Matter Experts to obtain technical specifications and data necessary to create test scripts.
  • Ensured team complied with HP's global method quality standards guidelines for testing.
  • Interviewed/hired Test Script Writers, Engineers, Linguists, Lingua-Aware Testers for multiple projects
  • Guide the Testing team by defining the test strategy and test plan.
  • Provided KT and guidance to client QA Manager and training of testers.
  • Guided and mentored junior engineers, molding them into senior leaders.
  • Guided systems to final customer sign off for testing accuracy.
  • Work Allocation and guiding team members.
  • Guided customer in the prioritization of software defects in respect to the criticality of their impact to the operational system.
  • Utilized UNIX and SQL to create test data and perform backend validation of GUI based applications.
  • Guided the testing team for timely and quality deliverables.
  • Provided Training coordination and guidance for the IPTs.
  • company guidelines, standards and regulations.
  • Provide guidance to testers on test execution process, tools and best practices for results documentation.

Show More

Test Manager Jobs

NO RESULTS

Aw snap, no jobs found.

20 Most Common Skills For A Test Manager

Test Cases

45.2%

Status Reports

8.9%

QA

4.9%

Project Management

4.3%

UAT

4.3%

Business Requirements

4.1%

SQL

3.6%

Test Procedures

2.8%

User Acceptance

2.5%

Windows XP

2.4%

Defect Management

2.1%

Platform

2.1%

QTP

1.9%

Onsite

1.9%

QC

1.7%

Suite

1.6%

Unix

1.4%

ALM

1.4%

XML

1.4%

Scrum

1.3%
Show More

Typical Skill-Sets Required For A Test Manager

Rank Skill
1 Test Cases 36.1%
2 Status Reports 7.1%
3 QA 3.9%
4 Project Management 3.5%
5 UAT 3.4%
6 Business Requirements 3.3%
7 SQL 2.9%
8 Test Procedures 2.2%
9 User Acceptance 2.0%
10 Windows XP 2.0%
11 Defect Management 1.7%
12 Platform 1.7%
13 QTP 1.6%
14 Onsite 1.6%
15 QC 1.3%
16 Suite 1.3%
17 Unix 1.2%
18 ALM 1.2%
19 XML 1.1%
20 Scrum 1.1%
21 HP Quality 1.1%
22 Sharepoint 1.0%
23 Mainframe 1.0%
24 Traceability Matrix 1.0%
25 Sdlc 1.0%
26 Soap User Interface 1.0%
27 System Integration 0.9%
28 Jira 0.9%
29 Selenium Webdriver 0.9%
30 Defect Triage 0.8%
31 DB2 0.8%
32 ETL 0.7%
33 E2E 0.7%
34 Waterfall 0.6%
35 Html 0.6%
36 CRM 0.6%
37 J2Ee 0.6%
38 Load Runner 0.6%
39 Test Leads 0.6%
40 Toad 0.5%
41 Agile Methodology 0.5%
42 TFS 0.5%
43 Linux 0.5%
44 Process Improvement 0.5%
45 UK 0.5%
46 Test Tools 0.5%
47 PMO 0.4%
48 C # 0.4%
49 HR 0.4%
50 GUI 0.4%
{[{skill.rank}]} {[{skill.name}]} {[{skill.percentageDisplay}]}%
Show More

5,830 Test Manager Jobs

Where do you want to work?

To get started, tell us where you'd like to work.
Sorry, we can't find that. Please try a different city or state.