Post job

Layer vs floor layer

The differences between layers and floor layers can be seen in a few details. Each job has different responsibilities and duties. Additionally, a layer has an average salary of $47,070, which is higher than the $39,772 average annual salary of a floor layer.

The top three skills for a layer include shingles, assembly line and reference points. The most important skills for a floor layer are VCT, tape measure, and hardwood.

Layer vs floor layer overview

LayerFloor Layer
Yearly salary$47,070$39,772
Hourly rate$22.63$19.12
Growth rate4%4%
Number of jobs37116,463
Job satisfaction--
Most common degreeHigh School Diploma, 52%High School Diploma, 60%
Average age4040
Years of experience--

Layer vs floor layer salary

Layers and floor layers have different pay scales, as shown below.

LayerFloor Layer
Average salary$47,070$39,772
Salary rangeBetween $32,000 And $67,000Between $25,000 And $62,000
Highest paying CityNew York, NYSeattle, WA
Highest paying stateAlaskaAlaska
Best paying companyLindsayUniversity of Washington
Best paying industry-Construction

Differences between layer and floor layer education

There are a few differences between a layer and a floor layer in terms of educational background:

LayerFloor Layer
Most common degreeHigh School Diploma, 52%High School Diploma, 60%
Most common majorBusinessBusiness
Most common college--

Layer vs floor layer demographics

Here are the differences between layers' and floor layers' demographics:

LayerFloor Layer
Average age4040
Gender ratioMale, 86.4% Female, 13.6%Male, 90.0% Female, 10.0%
Race ratioBlack or African American, 8.2% Unknown, 4.0% Hispanic or Latino, 28.0% Asian, 1.3% White, 58.1% American Indian and Alaska Native, 0.4%Black or African American, 7.8% Unknown, 3.6% Hispanic or Latino, 22.3% Asian, 1.3% White, 64.6% American Indian and Alaska Native, 0.4%
LGBT Percentage3%3%

Differences between layer and floor layer duties and responsibilities

Layer example responsibilities.

  • Install glue down LVT and LVP.
  • Clean all construction areas to avoid hazards.
  • Complete indoor and outdoor, residential and commercial construction projects.
  • Do demo work to get ready for tile to be place.
  • Work as pipe layer, laying water and sewer lines.make water and sewer taps for sewer lines.
  • Remodel and refurbish homes and commercial buildings, install windows, sheetrock, sinks, bathrooms, kitchens.
  • Show more

Floor layer example responsibilities.

  • Install pad, VCT, carpet tile, and cove base.
  • Utilize interlocking installations for hardwood floors.
  • Apply mortar to tile back, position the tile and press or tap with trowel handle to affix tile to base.

Layer vs floor layer skills

Common layer skills
  • Shingles, 16%
  • Assembly Line, 15%
  • Reference Points, 12%
  • Retaining Walls, 10%
  • Building Materials, 9%
  • Water Lines, 9%
Common floor layer skills
  • VCT, 45%
  • Tape Measure, 29%
  • Hardwood, 27%

Browse construction and extraction jobs