Post job

Scada operator vs utility plant operative

The differences between scada operators and utility plant operatives can be seen in a few details. Each job has different responsibilities and duties. It typically takes 6-12 months to become both a scada operator and a utility plant operative. Additionally, a scada operator has an average salary of $45,474, which is higher than the $42,253 average annual salary of a utility plant operative.

The top three skills for a scada operator include SCADA, and . The most important skills for a utility plant operative are plant equipment, auxiliary equipment, and HVAC.

Scada operator vs utility plant operative overview

Scada OperatorUtility Plant Operative
Yearly salary$45,474$42,253
Hourly rate$21.86$20.31
Growth rate-7%-7%
Number of jobs28,55219,159
Job satisfaction--
Most common degreeBachelor's Degree, 56%Associate Degree, 41%
Average age4747
Years of experience1212

Scada operator vs utility plant operative salary

Scada operators and utility plant operatives have different pay scales, as shown below.

Scada OperatorUtility Plant Operative
Average salary$45,474$42,253
Salary rangeBetween $32,000 And $64,000Between $29,000 And $59,000
Highest paying City-Highland, CA
Highest paying state-Washington
Best paying company-Yale University
Best paying industry-Energy

Differences between scada operator and utility plant operative education

There are a few differences between a scada operator and a utility plant operative in terms of educational background:

Scada OperatorUtility Plant Operative
Most common degreeBachelor's Degree, 56%Associate Degree, 41%
Most common majorBusinessBusiness
Most common collegeNortheastern UniversityDuke University

Scada operator vs utility plant operative demographics

Here are the differences between scada operators' and utility plant operatives' demographics:

Scada OperatorUtility Plant Operative
Average age4747
Gender ratioMale, 92.0% Female, 8.0%Male, 95.5% Female, 4.5%
Race ratioBlack or African American, 5.3% Unknown, 4.5% Hispanic or Latino, 8.8% Asian, 1.7% White, 77.3% American Indian and Alaska Native, 2.4%Black or African American, 8.0% Unknown, 4.5% Hispanic or Latino, 12.9% Asian, 1.8% White, 70.5% American Indian and Alaska Native, 2.3%
LGBT Percentage5%5%

Differences between scada operator and utility plant operative duties and responsibilities

Scada operator example responsibilities.

  • Maintain buildings HVAC / lighting automation systems and make adjustments as needed for tenant's comfort and to manage energy consumption.
  • Acknowledge and answer SCADA alarms by identifying priority levels and notifying appropriate personnel.
  • Prepare asphalt mixtures per customer requirements, load and unload tankers and monitor tanks and assist with paperwork
  • Conduct leak surveys along pipelines using flame-pak and CGI units.

Utility plant operative example responsibilities.

  • Maintain buildings HVAC / lighting automation systems and make adjustments as needed for tenant's comfort and to manage energy consumption.
  • Conduct work in an FDA regulate environment.
  • Enforce and comply with operational guidelines, OSHA and EPA regulations.
  • Maintain compliance with state regulators, cGMP, FDA and insurance company.
  • Last year of employment work include 20 hour each week doing plumbing work exclusively.
  • Perform some plumbing repairs, minor electrical work, some carpentry, plus general maintenance at plant and offices.
  • Show more

Scada operator vs utility plant operative skills

Common scada operator skills
  • SCADA, 100%
Common utility plant operative skills
  • Plant Equipment, 9%
  • Auxiliary Equipment, 7%
  • HVAC, 7%
  • Plant Operations, 6%
  • Control Systems, 5%
  • Cooling Towers, 5%

Browse production and manufacturing jobs