Post job

Master production scheduler vs project planner

The differences between master production schedulers and project planners can be seen in a few details. Each job has different responsibilities and duties. It typically takes 1-2 years to become both a master production scheduler and a project planner. Additionally, a project planner has an average salary of $86,926, which is higher than the $77,455 average annual salary of a master production scheduler.

The top three skills for a master production scheduler include master production schedule, logistics and customer demand. The most important skills for a project planner are project management, project planning, and microsoft project.

Master production scheduler vs project planner overview

Master Production SchedulerProject Planner
Yearly salary$77,455$86,926
Hourly rate$37.24$41.79
Growth rate-3%-3%
Number of jobs71,29356,558
Job satisfaction--
Most common degreeBachelor's Degree, 66%Bachelor's Degree, 67%
Average age4545
Years of experience22

What does a master production scheduler do?

A master production scheduler manages company processes by ensuring they are completed on time and they meet a client's expectations. They work with a master production schedule to ensure that individual commodities are produced in line with the present demands for the product. They work with manufacturing to determine the demands set for the product in terms of quantity, the time period for production, and the products that need to be procured for the manufacturing.

What does a project planner do?

A project planner is responsible for determining project management procedures according to business requirements and client specifications. Project planners schedule deliverables of outputs for every milestone to ensure that the team follows the track of guidelines, adhering to the company policies and project plans. They write status reports, conduct cost expenses analysis, and strategize techniques in maximizing the team's productivity and efficiency. A project planner also identifies opportunities to improve project workloads and adjust procedures as necessary to meet the highest goals and objectives.

Master production scheduler vs project planner salary

Master production schedulers and project planners have different pay scales, as shown below.

Master Production SchedulerProject Planner
Average salary$77,455$86,926
Salary rangeBetween $60,000 And $98,000Between $63,000 And $118,000
Highest paying CityOxnard, CADavis, CA
Highest paying stateWashingtonCalifornia
Best paying companyGCP Applied TechnologiesNovo Nordisk
Best paying industryPharmaceuticalHospitality

Differences between master production scheduler and project planner education

There are a few differences between a master production scheduler and a project planner in terms of educational background:

Master Production SchedulerProject Planner
Most common degreeBachelor's Degree, 66%Bachelor's Degree, 67%
Most common majorBusinessBusiness
Most common collegeWestern Carolina UniversityWestern Carolina University

Master production scheduler vs project planner demographics

Here are the differences between master production schedulers' and project planners' demographics:

Master Production SchedulerProject Planner
Average age4545
Gender ratioMale, 64.3% Female, 35.7%Male, 65.1% Female, 34.9%
Race ratioBlack or African American, 9.5% Unknown, 4.9% Hispanic or Latino, 17.4% Asian, 7.2% White, 60.5% American Indian and Alaska Native, 0.5%Black or African American, 10.3% Unknown, 4.9% Hispanic or Latino, 16.9% Asian, 7.0% White, 60.3% American Indian and Alaska Native, 0.5%
LGBT Percentage11%11%

Differences between master production scheduler and project planner duties and responsibilities

Master production scheduler example responsibilities.

  • Lead efforts to achieve high level of schedule accuracy, enhance WIP, and improve reliability of deliveries.
  • Lead daily production meetings with manufacturing and site logistics and facilitate many projects.
  • Implement and sustain the quality system to remain compliant with ISO [] standards.
  • Oversee production planner activities to ensure steady flow of WIP through plant and ultimately on time delivery of finish goods.
  • Assist in the review of MRP integrity pertaining to lead times, lot sizes, BOM, and shrinkage factors.
  • Determine supply/demand and capacity and load requirements into ERP system.
  • Show more

Project planner example responsibilities.

  • Utilize SharePoint and manage content to display and capture progress report information.
  • Manage logistics of all facets of the transition from housing, moving, inter-service agreements and education.
  • Manage event day logistics, including staging, set-up and strike; adherence to event schedule, and guest hospitality.
  • Follow EPC projects from the engineering office to the construction site to manage the execution and performance of the construction effort.
  • Manage retrofit projects for progressive stamping equipment.
  • Experience with CMMS (maximo), including writing job plans and pm's.
  • Show more

Master production scheduler vs project planner skills

Common master production scheduler skills
  • Master Production Schedule, 8%
  • Logistics, 7%
  • Customer Demand, 6%
  • Capacity Planning, 6%
  • ERP, 6%
  • Continuous Improvement, 4%
Common project planner skills
  • Project Management, 20%
  • Project Planning, 8%
  • Microsoft Project, 4%
  • Project Scope, 4%
  • Primavera P6, 4%
  • Project Controls, 3%

Browse office and administrative jobs